Brain Gear Investments (Pty) Ltd v Buhle Waste (Pty) Ltd and Others; Sembcorp Silulumanzi (RF) (Pty) Ltd and Others v Buhle Waste (Pty) Ltd and Others; Sembcorp Utilities (Netherlands) NV v Buhle Waste (Pty) Ltd and Others (CCT 11/25; CCT 12/25; CCT 25/25) [2026] ZACC 41 (9 October 2026)

80 Reportability
Administrative Law

Brief Summary

Administrative Law — Review — Promotion of Administrative Justice Act — Municipality's decision regarding share transfer in water services provider — High Court granting review based on alleged non-compliance with Council resolution — Supreme Court of Appeal varying relief — Constitutional Court upholding review, finding that the Municipal Manager's actions constituted administrative action subject to review under PAJA and legality principles.

Comprehensive Summary

Summary of Judgment


1. Introduction


These matters comprised three related applications for leave to appeal to the Constitutional Court from the Supreme Court of Appeal, which had itself heard an appeal from the High Court of South Africa, Mpumalanga Division, Mbombela. The central question was whether conduct by the Municipal Manager of the City of Mbombela Municipality (acting for the Municipality) was subject to judicial review either under the Promotion of Administrative Justice Act 3 of 2000 (PAJA) or under the principle of legality.


The proceedings arose from a review application instituted by Buhle Waste (Pty) Limited in the High Court. Buhle Waste sought to set aside municipal conduct connected to the Municipality’s contractual consent requirements relating to a change of control in Sembcorp Silulumanzi (RF) (Pty) Limited (Silulumanzi), a water services provider operating under a concession contract with the Municipality. The High Court upheld the review and set aside the impugned municipal conduct; the Supreme Court of Appeal substantially confirmed that conclusion but adjusted aspects of the relief.


In the Constitutional Court, the parties who had opposed the review below—Brain Gear Investments (Pty) Limited (Brain Gear), Silulumanzi, South African Water Works (Pty) Limited (SAWW), Sembcorp Utilities South Africa (Pty) Limited (SUSA), and Sembcorp Utilities (Netherlands) NV (SUN)—sought leave to appeal. The dispute concerned the classification of municipal conduct within South African administrative law, the availability of legality review where the immediate source of power is contractual, and whether the review should have failed due to unreasonable delay.


2. Material Facts


In April 1999, following a tender process, the Municipality concluded a concession contract with Silulumanzi for the supply of water in part of the municipal area, expiring in October 2029. The contract was concluded in a statutory context under the Water Services Act 108 of 1997, with the Municipality acting as a water services authority and Silulumanzi as a water services provider. The concession contract contained a change-of-control clause requiring the prior written approval of the Municipality’s Council for any share transfer producing a change of control.


By February 2018, control of Silulumanzi was held within the Sembcorp group: SUN held 48% of Silulumanzi shares and its subsidiary SUSA held 52%. The group sought to exit Africa, and on 22 February 2018 SUN, SUSA, SAWW and Silulumanzi concluded a sale agreement under which SAWW would acquire SUN’s direct and indirect interest in Silulumanzi. A suspensive condition required unconditional Council approval within a defined period.


When SAWW and Silulumanzi sought the Municipality’s approval, the Municipality sought inclusion of a Mbombela-based BEE entity as a minority shareholder in Silulumanzi. Although the Municipality received legal advice that it could not insist on this as a condition for consent, the parties negotiated an arrangement under which a process would be followed to make a 28% shareholding available to a local BEE entity.


That arrangement was recorded in a Council resolution of 28 June 2018, granting conditional consent subject to suspensive conditions requiring SAWW and Silulumanzi to run a selection process for a 28% local BEE shareholder within 90 days. The resolution envisaged municipal oversight of the process and required the Acting Municipal Manager, as accounting officer, to confirm that the conditions had been met, failing which the conditional consent would lapse.


A structured selection process followed. Silulumanzi appointed PwC to assist. A steering committee (including municipal representatives) met repeatedly between July and September 2018. Requests for information were issued to selected local BEE entities, including Buhle Waste and Brain Gear. Three timely bids were received. PwC performed integrity due diligence and produced a ranking report in which Brain Gear outscored Buhle Waste; SAWW conducted additional evaluation and selected Brain Gear. An agreement for Brain Gear’s acquisition of the 28% shareholding was concluded on 28 September 2018.


Municipal correspondence revealed that the Acting Municipal Manager had expressed concerns regarding the integrity and compliance of the process, but internal legal advice dated 17 October 2018 concluded that the process had complied with the resolution. On 14 November 2018, an agreement between the Municipality and Silulumanzi recorded that Silulumanzi had, to the Municipality’s satisfaction, selected the local BEE shareholder, and the Municipality confirmed fulfilment of the Council’s conditions and gave unconditional and irrevocable consent to the change in control from an effective date stated as 28 September 2018. The court treated this municipal confirmation as the impugned conduct.


Buhle Waste launched review proceedings on 17 July 2019, later supplementing its case after receipt of the rule 53 record. It expanded its criticisms to include alleged conflicts of interest and asserted that municipal oversight and consultation had been inadequate. Further litigation steps occurred concerning production of documents, including the February 2018 agreement. During the High Court hearing in May 2022, Buhle Waste and SUN concluded a settlement order clarifying that Buhle Waste did not seek relief invalidating the February 2018 agreement or the June 2018 Council resolution, and that those instruments were valid and binding.


The High Court condoned the delay in bringing review proceedings and set aside the impugned municipal conduct, remitting the matter for reconsideration with directions. The Supreme Court of Appeal rejected defences based on internal remedies and delay, confirmed the finding that PAJA applied, upheld the setting aside of the decision, but removed certain paragraphs of the High Court’s remedial order as unnecessary.


3. Legal Issues


The Constitutional Court was required to determine, as a threshold matter, whether the impugned municipal conduct amounted to a reviewable act, either as administrative action under PAJA or as an exercise of public power reviewable under the principle of legality. This required legal characterisation of conduct occurring within a contractual framework, and thus involved questions of law and the application of law to fact.


Within that overarching enquiry, the Court addressed whether the Supreme Court of Appeal’s order had unintended consequences for the settlement order between Buhle Waste and SUN, and whether the relevant decision was indeed the act recorded on 14 November 2018. It further considered whether, even if legality review applied, the review should have been refused because Buhle Waste brought proceedings after an unreasonable delay and whether such delay should be overlooked. Although internal remedies under section 62 of the Local Government: Municipal Systems Act 32 of 2000 had featured below, the Court ultimately treated it as unnecessary to decide that issue given its conclusions on PAJA and delay.


4. Court’s Reasoning


The Court accepted that its constitutional jurisdiction was engaged because the appeal raised questions concerning the scope and application of PAJA and legality review, and related issues such as delay, internal remedies, and the remedial consequences of review. Leave to appeal was granted to Brain Gear and the SAWW parties because the issues were important in administrative law and there were reasonable prospects of success. SUN’s application was treated as conditional and ultimately became unnecessary once the Court clarified the consequences of the settlement order and the relief.


On the effect of the settlement order, the Court reasoned that a strict reading could suggest that if the Council’s conditions were not lawfully fulfilled, the conditional consent would lapse and in turn the suspensive condition in the February 2018 agreement would fail, potentially undoing the transaction between SUN and SAWW. However, the Court emphasised that review remedies are not mechanically determined by strict private-law logic, and it analysed the settlement order as intending to isolate and protect the validity of the February 2018 agreement and the June 2018 resolution while leaving open disputes about the fulfilment of the obligation to accommodate a local BEE shareholder. Since the Supreme Court of Appeal had set aside the High Court’s paragraph that had declared the suspensive conditions unfulfilled, the settlement order’s intended effect was not undermined in the way SUN feared. This meant SUN did not require further appellate relief.


On whether a relevant decision occurred on 14 November 2018, the Court acknowledged arguments that confirmation might have been given earlier (including by endorsement on a letter of 19 September 2018). It concluded that the case had been litigated below on the footing that the operative confirmation decision occurred on 14 November 2018, that this approach was justified on the affidavits, and that any misdating would in any event not have materially affected the pleaded grounds or defences.


The Court then addressed whether the 14 November 2018 confirmation constituted administrative action under PAJA. It rejected the contention that the confirmation was merely clerical or mechanical: it had legal consequences because it was the mechanism that rendered the Council’s consent unconditional and confirmed that the Council’s conditions had been met. The Court held that this could adversely affect rights and have direct, external legal effect.


However, the decisive obstacle under PAJA was the requirement in paragraph (a)(ii) of PAJA’s definition of “administrative action” that an organ of state must exercise a public power or perform a public function “in terms of any legislation”. The Court treated that phrase as requiring a meaningful legislative source for the specific power being exercised, and not a remote or general connection to legislation merely because the actor is a statutory body or operates in a regulated field. It reasoned that while the original concession contract arose from a procurement process and existed within the Water Services Act framework, the specific power being exercised in 2018 was the Municipality’s contractual power to grant or withhold consent to a change in control, as created by the concession contract. It was common cause that neither the Water Services Act nor other legislation required the concession contract to contain such a change-of-control clause. Similarly, the arrangement for selecting a local BEE shareholder was not imposed by legislation; it resulted from negotiation, notwithstanding that the Municipality may have been motivated by constitutional or statutory transformation objectives. The Council’s resolution, and the Municipal Manager’s later confirmation of compliance with it, therefore were not acts performed “in terms of any legislation” for PAJA purposes. On this basis, the High Court and Supreme Court of Appeal were found to have erred in treating the conduct as reviewable administrative action under PAJA.


The Court then turned to legality review. It restated that the exercise of public power must comply with legality constraints, including acting within lawful power and avoiding arbitrariness through rationality. Applying the factors used to distinguish private from public power, the Court held that the Council’s exercise of the contractual consent power—and thus the Municipal Manager’s confirmation that finalised that consent—was, on the facts, an exercise of public power. The Court emphasised that the concession contract was a public-function contract under the Water Services Act for delivery of a vital service; that the consent requirement existed to protect proper performance of the public function by controlling who might control the concessionaire; and that the Municipality possessed a significant position of power in granting or withholding consent. It also accepted that the Municipality’s insistence on local BEE participation pursued local economic and transformation aims. These features, taken together, sufficed to bring the conduct within legality review, even though PAJA did not apply.


Having found legality review applicable, the Court addressed delay using the legality framework rather than PAJA’s fixed 180-day period. It applied the two-stage enquiry: whether delay was unreasonable, and if so whether it should be overlooked. The Court treated the nature of the transactions as calling for prompt challenge: the decision enabled large commercial arrangements involving share acquisition, funding arrangements, and dividend flows, creating escalating prejudice and “unscrambling the egg” difficulties over time. Buhle Waste launched review almost eight months after it said it became aware of the decision. The Court found the explanation for that period materially deficient, noting the absence of specific evidence showing that post-decision information requests or settlement efforts accounted for the delay.


In determining whether to overlook the unreasonable delay, the Court considered prejudice and practical consequences. It found evidence that the transactions had progressed significantly and that parties (including Brain Gear and SAWW) had incurred costs and conducted affairs in reliance on implementation; by December 2019 the key agreements had been fully implemented. It also considered the nature of the alleged unlawfulness, characterising it as not egregious and largely framed as municipal passivity rather than corruption or dishonesty. The Court further evaluated the merits as a factor relevant to delay and found that the strength of Buhle Waste’s case was not as clear-cut as the lower courts had suggested, particularly because the Council resolution gave SAWW and Silulumanzi the primary role in administering and making the selection, with the Municipality’s role framed as oversight and consultation; the Municipality itself did not complain of non-consultation.


The Court concluded that there was no realistic prospect of crafting a remedy that could meaningfully mitigate the prejudice and practical disruption after such elapsed time, particularly since the entire structure of the price and effective date was tied to the earlier point in the concession’s lifespan. It accordingly held that this was not a case where the Court’s discretion should overlook the unreasonable delay. Because the delay point disposed of the legality review, it was unnecessary to decide internal remedy questions or to reach final determinations on the substantive merits and remedy.


Costs were approached through constitutional litigation principles. The Court applied Biowatch protection such that the Municipality bore its own costs, and it treated Silulumanzi (performing a public function in terms of the concession) similarly. It held that private parties who successfully resisted the review—Brain Gear, SAWW and SUSA—were entitled to their costs against Buhle Waste, including the costs of two counsel where employed. SUN bore its own costs given the procedural posture and that no adverse argument was pressed against it.


5. Outcome and Relief


The Constitutional Court made no substantive order on SUN’s application for leave to appeal (save costs), because SUN’s concern fell away once the settlement order’s intended effect was clarified. Leave to appeal was granted to Brain Gear and to Silulumanzi/SAWW/SUSA, and their appeals succeeded.


The Supreme Court of Appeal’s order was set aside and replaced with an order upholding the appeals, setting aside the High Court’s order, and dismissing Buhle Waste’s review application. The Court ordered that the Municipal Manager, the Municipality, the Council Chairperson and Silulumanzi bear their own costs in the High Court, while Buhle Waste was ordered to pay the costs of Brain Gear, SAWW and SUSA in the High Court, the Supreme Court of Appeal, and the Constitutional Court, including costs of two counsel where employed. SUN and Silulumanzi were ordered to bear their own costs in the Supreme Court of Appeal and Constitutional Court.


Cases Cited


Buhle Waste (Pty) Ltd v Municipal Manager City of Mbombela Municipality [2022] ZAMPMBHC 70; Brain Gear Investments (Pty) Ltd v Buhle Waste (Pty) Ltd [2024] ZASCA 168; Mazibuko v City of Johannesburg [2009] ZACC 28; 2010 (3) BCLR 239 (CC); 2010 (4) SA 1 (CC); Esorfranki Pipelines (Pty) Ltd v Mopani District Municipality [2022] ZACC 41; 2023 (2) SA 31 (CC); 2023 (2) BCLR 149 (CC); Grey’s Marine Hout Bay (Pty) Ltd v Minister of Public Works [2005] ZASCA 43; [2005] 3 All SA 33 (SCA); 2005 (6) SA 313 (SCA); 2005 (10) BCLR 931 (SCA); Trencon Construction (Pty) Ltd v Industrial Development Corporation of South Africa Ltd [2015] ZACC 22; 2015 (5) SA 245 (CC); 2015 (10) BCLR 1199 (CC); Chirwa v Transnet Ltd [2007] ZACC 23; [2008] 2 BLLR 97 (CC); 2008 (3) BCLR 251 (CC); 2008 (4) SA 367 (CC); (2008) 29 ILJ 73 (CC); Cape Metropolitan Council v Metro Inspection Services (Western Cape) CC [2001] ZASCA 56; 2001 (3) SA 1013 (SCA); 2001 (10) BCLR 1026 (SCA); Logbro Properties CC v Bedderson N.O. [2002] ZASCA 135; [2003] 1 All SA 424 (SCA); 2003 (2) SA 460 (SCA); Government of the Republic of South Africa v Thabiso Chemicals (Pty) Ltd [2008] ZASCA 112; 2009 (1) SA 163 (SCA); [2009] 1 All SA 349 (SCA); South African National Parks v MTO Forestry (Pty) Ltd [2018] ZASCA 59; 2018 (5) SA 177 (SCA); R (West) v Lloyds of London [2004] EWCA Civ 506; [2004] 3 All ER 233; Plover’s Nest Investment v De Haan [2015] ZASCA 193; Fedsure Life Assurance Ltd v Greater Johannesburg Transitional Metropolitan Council [1998] ZACC 17; 1998 (12) BCLR 1458 (CC); 1999 (1) SA 374 (CC); Pharmaceutical Manufacturers Association of South Africa: In re Ex Parte President of the Republic of South Africa [2000] ZACC 1; 2000 (2) SA 674 (CC); 2000 (3) BCLR 241 (CC); AMCU v Chamber of Mines of South Africa [2017] ZACC 3; 2017 (3) SA 242 (CC); 2017 (6) BCLR 700 (CC); [2017] 7 BLLR 641 (CC); (2017) 38 ILJ 831 (CC); Maqoma v Sebe N.O. 1987 (1) SA 483 (CK); [1987] 3 All SA 414 (Ck); Hayes v Minister of Housing, Planning and Administration, Western Cape 1999 (1) SA 1229 (C); Port Louis Corporation v Attorney General of Mauritius [1965] AC 1111 (PC); Minister of Home Affairs v Scalabrini Centre [2013] ZASCA 134; [2013] 4 All SA 571 (SCA); 2013 (6) SA 421 (SCA); Tlouamma v Mbethe, Speaker of the National Assembly of the Parliament of the Republic of South Africa [2015] ZAWCHC 140; [2016] 1 All SA 235 (WCC); 2016 (1) SA 534 (WCC); 2016 (2) BCLR 242 (WCC); Khumalo v MEC for Education, KwaZulu-Natal [2013] ZACC 49; 2014 (3) BCLR 333 (CC); 2014 (5) SA 579 (CC); (2014) 35 ILJ 613 (CC); Department of Transport v Tasima (Pty) Ltd [2016] ZACC 39; 2017 (1) BCLR 1 (CC); 2017 (2) SA 622 (CC); Buffalo City Metropolitan Municipality v Asla Construction (Pty) Ltd [2019] ZACC 15; 2019 (4) SA 331 (CC); 2019 (6) BCLR 661 (CC); Opposition to Urban Tolling Alliance v South African National Roads Agency Limited [2013] ZASCA 148; [2013] 4 All SA 639 (SCA); Biowatch Trust v Registrar, Genetic Resources [2009] ZACC 14; 2009 (6) SA 232 (CC); 2009 (10) BCLR 1014 (CC); Nu Africa Duty Free Shops (Pty) Ltd v Minister of Finance [2023] ZACC 31; 2023 (12) BCLR 1419 (CC); 2024 (1) SA 567 (CC).


Legislation Cited


Constitution of the Republic of South Africa, 1996 (including sections 9(2), 27(1)(b), 33(3), and 239); Promotion of Administrative Justice Act 3 of 2000; Water Services Act 108 of 1997; Local Government: Municipal Systems Act 32 of 2000 (section 62); Broad-Based Black Economic Empowerment Act 53 of 2003; Employment Equity Act 55 of 1998; Promotion of Access to Information Act 2 of 2000; Legal Succession to the South African Transport Services Act 9 of 1989.


Rules of Court Cited


Uniform Rules of Court, rule 53.


Held


The Court held that the Municipal Manager’s confirmation decision (treated as having been taken on 14 November 2018) was not “administrative action” under PAJA, because the relevant power was exercised under a contractual consent clause and not “in terms of any legislation” as required by PAJA’s definition. The Court held further that the decision nevertheless constituted an exercise of public power on the particular facts and was therefore susceptible to legality review.


However, the Court held that Buhle Waste brought the legality review after an unreasonable delay, that the explanation for the delay was inadequate, that the prejudice and practical consequences were substantial, and that the delay should not be overlooked. The review application should therefore have been dismissed, rendering it unnecessary to decide internal-remedy issues or finally determine the merits and remedial questions addressed in the courts below.


LEGAL PRINCIPLES


The judgment applied the principle that, due to subsidiarity, whether conduct is “administrative action” must be determined primarily by PAJA’s statutory definition rather than by a free-standing reliance on section 33 of the Constitution, and under-inclusiveness in PAJA would require a frontal challenge rather than judicial expansion.


It affirmed that for conduct by an organ of state to be “administrative action” under PAJA where paragraph (a)(ii) is relied upon, it is not sufficient that the actor is a statutory body or operates within a legislated field; the relevant decision must be an exercise of public power or performance of public function “in terms of any legislation”, and an overly remote connection to legislation would render that requirement meaningless.


The judgment further applied the principle that legality review extends to exercises of public power, and that the classification of power as public or private is context-sensitive, informed by factors including the actor’s public character, the source and nature of the power, superiority or coercive capacity, the relationship to public functions, and the public interest impact. Even where the immediate source of power is contractual, the power may be public on the facts.


Finally, it applied the legality-review doctrine that delay is addressed through a two-stage enquiry: whether the delay is unreasonable and, if so, whether it should be overlooked in the court’s discretion. The discretion is exercised through a multi-factor assessment that includes explanation, prejudice, consequences of setting aside, the feasibility of just and equitable relief, the nature and seriousness of the alleged illegality, and the overall merits insofar as relevant to the delay enquiry.

CONSTITUTIONAL COURT OF SOUTH AFRICA


Case CCT 11/25

In the matter between:


BRAIN GEAR INVESTMENTS (PTY) LIMITED Applicant

and

BUHLE WASTE (PTY) LIMITED First Respondent

MUNICIPAL MANAGER, CITY OF
MBOMBELA MUNICIPALITY Second Respondent

CHAIRPERSON, COUNCIL OF THE CITY
OF MBOMBELA MUNICIPALITY Third Respondent

CITY OF MBOMBELA MUNICIPALITY Fourth Respondent

SEMBCORP SILULUMANZI (RF)
(PTY) LIMITED Fifth Respondent

SOUTH AFRICAN WATER WORKS
(PTY) LIMITED Sixth Respondent

SEMBCORP UTILITIES SOUTH AFRICA
(PTY) LIMITED Seventh Respondent

SEMBCORP UTILITIES (NETHERLANDS) NV Eighth Respondent


Case CCT 12/25

And in the matter between:


SEMBCORP SILULUMANZI (RF)
(PTY) LIMITED First Applicant

SOUTH AFRICAN WATER WORKS
(PTY) LIMITED Second Applicant

SEMBCORP UTILITIES SOUTH AFRICA
(PTY) LIMITED Third Applicant

and

BUHLE WASTE (PTY) LIMITED First Respondent

MUNICIPAL MANAGER, CITY OF
MBOMBELA MUNICIPALITY Second Respondent

CHAIRPERSON, COUNCIL OF THE CITY
OF MBOMBELA MUNICIPALITY Third Respondent

CITY OF MBOMBELA MUNICIPALITY Fourth Respondent

BRAIN GEAR INVESTMENTS (PTY) LIMITED Fifth Respondent

SEMBCORP UTILITIES (NETHERLANDS) NV Sixth Respondent


Case CCT 25/25

And in the matter between:


SEMBCORP UTILITIES (NETHERLANDS) NV Applicant

and

BUHLE WASTE (PTY) LIMITED First Respondent

MUNICIPAL MANAGER, CITY OF
MBOMBELA MUNICIPALITY Second Respondent

CHAIRPERSON, COUNCIL OF THE CITY
OF MBOMBELA MUNICIPALITY Third Respondent

CITY OF MBOMBELA MUNICIPALITY Fourth Respondent

SEMBCORP SILULUMANZI (RF)
(PTY) LIMITED Fifth Respondent

SOUTH AFRICAN WATER WORKS
(PTY) LIMITED Sixth Respondent

SEMBCORP UTILITIES SOUTH AFRICA
(PTY) LIMITED Seventh Respondent

BRAIN GEAR INVESTMENTS (PTY) LIMITED Eighth Respondent



Neutral citation: Brain Gear Investments (Pty) Ltd v Buhle Waste (Pty) Ltd and
Others; Sembcorp Silulumanzi (RF) (Pty) Ltd and Others v Buhle
Waste (Pty) Ltd and Others; Sembcorp Utilities (Netherlands) NV
v Buhle Waste (Pty) Ltd and Others [2026] ZACC 41

Coram: Mhlantla ADCJ, Dambuza J, Kollapen J, Nuku AJ, Opperman AJ,
Rogers J, Savage J and Tshiqi J


Judgment: Rogers J (unanimous)

Heard on: 10 February 2026

Decided on: 9 October 2026

Summary: Review — Promotion of Administrative Justice Act 3 of 2000 —
definition of “administrative action” — Municipality’s decision
not taken “in terms of any legislation”

Legality review — contractual power — nevertheless on the facts
an exercise of public power

Legality review — unreasonable delay — factors relevant to
condonation – delay not overlooked




ORDER



On applications for leave to appeal from the Supreme Court of Appeal (hearing an
appeal from the High Court of South Africa, Mpumalanga Division, Mbombela):

1. In Case CCT 25/25 , no order is made on the application by Sembcorp
Utilities (Netherlands) NV (SUN) for leave to appeal, save in respect of
costs as reflected below.
2. Leave to appeal is granted in Cases CCT 11/25 and CCT 12/25.
3. The appeals in Cases CCT 11/25 and CCT 12/25 succeed.
4. The order of the Supreme Court of Appeal is set aside and the following
order is substituted in its place:
“(a) The appeals succeed.
(b) The order of the High Court is set aside and replaced by the
following:
‘(i) The application is dismissed.
(ii) The first, second and third respondents (the Municipal
Manager of the City of Mbombela Municipality, the City of
Mbombela Municipality and the Chairperson of the Council
of the City of Mbombela Municipality) and the fourth
respondent (Sembcorp Silulumanzi (RF) (Pty) Limited)
(Silulumanzi) must bear their own costs.
(iii) The applicant, Buhle Waste (Pty) Limited (Buhle Waste) ,
must pay the costs of the fifth respondent , Brain Gear
Investments (Pty) Limited (Brain Gear), the seventh
respondent, South African Water Works (Pty) Limited
(SAWW) and the ninth respondent , Sembcorp Utilities
South Africa (Pty) Limited (SUSA), including the costs of
two counsel where employed.’
(c) Silulumanzi and SUN must bear their own costs on appeal.
(d) Buhle Waste must pay the costs of Brain Gear, SAWW and SUSA
on appeal, including the costs of two counsel where employed.”
5. SUN and Silulumanzi must bear their own costs in this Court.
6. Buhle Waste must pay the costs of Brain Gear, SAWW and SUSA in this
Court, including the costs of two counsel where employed.

5


JUDGMENT




ROGERS J (Mhlantla ADCJ, Dambuza J, Kollapen J, Nuku AJ, Opperman AJ,
Savage J and Tshiqi J concurring):


Introduction
[1] The main issue in these three applications for leave to appeal is whether the
Municipal Manager of the City of Mbombela Municipality (Municipality) performed
an act which is subject to review, either in terms of the Promotion of Administrative
Justice Act1 (PAJA) or the principle of legality. In an application for review brought
by Buhle Waste (Pty) Limited (Buhle Waste), the High Court of South Africa ,
Mpumalanga Division, Mbombela (High Court) , answered this question affirmatively,
granted the review and set aside the impugned act .2 The Supreme Court of Appeal
(SCA) upheld this decision, but varied the relief granted by the High Court.3

[2] The parties who opposed the review in the High Court – Sembcorp Silulumanzi
(RF) (Pty) Limited (Silulumanzi), South African Water Works (Pty) Limited (SAWW),
Sembcorp Utilities South Africa (Pty) Limited (SUSA) , Sembcorp Utilities
(Netherlands) NV (SUN) and Brain Gear Investments (Pty) Limited (Brain Gear) – now
apply to this Court for leave to appeal.


1 3 of 2000.
2 Buhle Waste (Pty) Ltd v Municipal Manager City of Mbombela Municipality [2022] ZAMPMBHC 70 (High
Court judgment).
3 Brain Gear Investments (Pty) Ltd v Buhle Waste (Pty) Ltd [2024] ZASCA 168 (SCA judgment).

ROGERS J
6
Factual background
[3] In April 1999, and p ursuant to a tender process, the Municipality4 concluded a
concession contract with Silulumanzi 5 for the supply of water in part of the municipal
area (concession contract). The contract expires in October 2029. The contract was
concluded in terms of the Water Services Act ,6 with the Municipality being a “water
services authority” and Silulumanzi a “water services provider” as defined in the
Water Services Act. Clause 7.4.2 of the contract provides that no shares in Silulumanzi
having the effect of a change of control may be transferred without the prior written
approval of the Municipality’s Council.

[4] As at February 2018, SUN held 48% of the shares in Silulumanzi and its
wholly-owned subsidiary, SUSA, held the other 5 2%. The Sembcorp group, to which
SUN belong s, wished to dispose of its interests in Africa . To this end, on
22 February 2018 SUN, SUSA, SAWW and Silulumanzi concluded a contract in terms
of which SAWW bought all of SUN’s direct and indirect shareholding in Silulumanzi
for an adjustable price of R650 million (February 2018 agreement). The effective date
of the sale was 31 December 2017. In terms of clause 4.1.3, one of the suspensive
conditions to which the agreement was subject was the Municipal Council’s
unconditional approval of the transaction. This and the other suspensive conditions had
to be fulfilled within 180 days from the date of signature.

[5] SAWW and Silulumanzi sought the Municipality’s approval. The Municipality
wanted the parties to include a Mbombela -based broad-based black economic
empowerment (BEE) entity as a minority shareholder of Silulumanzi. The Municipality
received legal advice that it could not insist on this as a condition for granting consent.
Nevertheless, pursuant to negotiation, an agreement was reached that a process would
be followed to make a 28% shareholding in Silulumanzi available to a local BEE entity.

be followed to make a 28% shareholding in Silulumanzi available to a local BEE entity.

4 Then called the Nelspruit Transitional Local Council.
5 Then called Greater Nelspruit Utility Company (Pty) Limited.
6 108 of 1997.

ROGERS J
7

[6] This negotiated arrangement was reflected in a resolution passed by the Council
on 28 June 2018 (Council resolution). The Council resolved in relevant part that—

“(c) conditional consent be granted with the specific suspensive condition that
SAWW and Silulumanzi immediately after this Council resolution, commence
with the process of obtaining a 28% Mbombela based [BEE] shareholder in
Silulumanzi and conclude the process within the prescribed 90 days from the
date of the Council resolution;
(d) the City of Mbombela, represented by the Executive Mayor and the Acting
Municipal Manager, oversee the process administered by SAWW and
Silulumanzi regarding the 28% [BEE] Mbombela based shareholder;
(e) SAWW and Silulumanzi to select the final 28% Mbombela based [BEE]
shareholder, in consultation with the representatives of the City of Mbombela;
(f) the Acting Municipal Manager, as Accounting Officer, be mandated to confirm
that the requirements above have been met as per the terms of the conditions
of the Conditional Consent granted;
(g) the Accounting Officer be authorised to sign all documents and do all things
necessary in order to implement the above;
(h) should the suspensive conditions stipulated in (c) above not be met within
90 days from the date of the Council resolution and written confirmation not
having been issued by the Acting Municipal Manager, confirming that all
suspensive conditions for the conditional consent have been met, the
conditional consent will automatically lapse and be of no further cause or effect
and may not be relied upon by any party.”

[7] Silulumanzi appointed PricewaterhouseCoopers Advisory Services (Pty)
Limited (PwC) to assist it in formulating selection criteria and implementing the bid
process. The parties established a steering committee comprising representatives from
Silulumanzi, SAWW, PwC and the Municipality. The steering committee met seven
times over the period 17 July 2018 to 19 September 2018.

ROGERS J
8
[8] On 3 August 2018 Silulumanzi issued a request for information to a closed list
of 11 local BEE entities. These included Buhle Waste and Brain Gear. This was
followed by a briefing session for interested entities. The closing date for bids was
24 August 2018. Only three entities, including Buhle Waste and Brain Gear, submitted
bids on time. PwC undertook an integrity due diligence (IDD) on the three bidders and
on 6 September 2018 prepared a ranking report. In terms of that report , Brain Gear
outscored Buhle Waste,7 while the third bidder was regarded as non -compliant and in
any event scored the lowest of the three. SAWW then engaged directly with Brain Gear
and Buhle Waste in order to make its own further assessment on so-called secondary
evaluation elements. In that process, Brain Gear again outscored Buhle Waste. 8 The
scores from the two processes were combined to arrive at final scores.9

[9] At the steering committee’s final meeting on 19 September 2018, the outcome
of this process was discussed, and the Municipality was informed that S AWW had
selected Brain Gear. On 28 September 2018 the last day of the 90-day period specified
in the Council resolution, an agreement was concluded between SAWW, Silulumanzi
and Brain Gear for the latter’s purchase of the 28% shareholding in Silulumanzi
(September 2018 agreement). The effective date was again 31 December 2017.

[10] Letters written by the Acting Municipal Manager, Mr Neil Diamond, before and
after 19 September 2018 reflect that he had concerns about the integrity of the selection
process and whether there had been compliance with the Council resolution. He sought
internal legal advice . On 17 October 2018 the Legal Services Department responded
that, having evaluated the process, it was satisfied that there had been compliance with
the resolution.

[11] On 14 November 2018, an agreement was concluded between the Municipalit y

[11] On 14 November 2018, an agreement was concluded between the Municipalit y
and Silulumanzi (November 2018 agreement) . Clause 5 of the preamble stated that

7 The scoring was 3.49:3.43.
8 The scoring was 1.00:0.25.
9 The final scoring was 4.49:3.68 in favour of Brain Gear.

ROGERS J
9
Silulumanzi had, to the Municipality’s satisfaction, selected the local BEE shareholder
and that the Municipality now confirmed fulfilment of the Council’s conditions and
wished formally to record this. In clause 3 , the Municipality acknowledged that the
transfer of shares in Silulumanzi would result in a change of control and the
Municipality unconditionally and irrevocably consented to the change in control from
the effective date, stated to be 28 September 2018.

[12] It is the conduct of the Municipality and the Municipal Manager, as reflected in
the November 2018 agreement, that Buhle Waste subsequently sought to have reviewed
and set aside.

Litigation history
High Court
[13] Buhle Waste ’s review application , which was launched on 17 July 2019, was
based on PAJA, alternatively on the principle of legality. The notice of motion targeted
a decision supposedly taken by the Municipality on 14 November 2018 to consent to a
transfer of shares by Silulumanzi to Brain Gear. 10 Buhle Waste alleged that the
Municipality had, in pre-litigation correspondence, distanced itself from any active role
in the selection process. The Municipality’s passive role was , according to
Buhle Waste, a violation of the Council resolution. Buhle Waste also alleged that the
Municipality, as a public entity, was bound by public procurement prescripts. The
Municipality, so Buhle Waste alleged, seem ed not to have been concerned about the
kind of entity with which it contracted. Buhle Waste’s founding affidavit also explained
why its delay in launching the review application should be condoned.

[14] Following receipt of the rule 53 record, Buhle Waste filed a supplementary
founding affidavit in September 2019. Buhle Waste expanded upon its contentions that
the Municipality had not properly overseen the process and that the selection of

10 This was inaccurate. The November 2018 agreement concerned the change of control from SUN to SAWW,

not the transfer of a 28% shareholding in Silulumanzi from SAWW to Brain Gear. This was corrected in an
amended notice of motion mentioned later in this judgment.

ROGERS J
10
Brain Gear had not occurred “in consultation with” the Municipality as contemplated
by the Council resolution. In addition, Buhle Waste alleged that—
(a) there had been impermissible conflicts of interest between Silulumanzi
and Brain Gear by virtue of the dual roles of Professor John Pempela
Shongwe (a director of Brain Gear and chair of Silulumanzi’s board) and
Mr Eddie Joseph Mabuza (a director of Brain Gear and allegedly
Silulumanzi’s Head of Economic Regulations);
(b) incorrect negative statements had been made about Buhle Waste in the
assessment;
(c) Brain Gear had been wrongly assessed as an existing operator in the water
sector with strong technical knowledge and experience, whereas it was a
newly incorporated company; and
(d) a red flag raised by PwC – that Brain Gear had misrepresented its BEE
status as contributor level one whereas it s status was contributor level
two – had been ignored.

[15] The application was opposed by the Municipality , SAWW, Silulumanzi,
Brain Gear and SUN. 11 The respondents complained that Buhle Waste had
unreasonably delayed in bringing the review. They contended that Buhle Waste had
failed to exhaust the internal remedy conferred by section 62 of the Local Government:
Municipal Systems Act 12 (Systems Act). 13 They denied that there was any conduct
reviewable in terms of PAJA or the principle of legality, contending that the giving of

11 SUN was not initially cited as a respondent. Pursuant to objections of non -joinder, it was later added as a
respondent.
12 32 of 2000.
13 Section 62(1) reads:
“A person whose rights are affected by a decision taken by a political structure, political office
bearer, councillor or staff member of a municipality in terms of power or duty delegated or
sub-delegated by a delegating authority to the political structur e, political office bearer,
councillor or staff member, may appeal against that decision by giving written notice of the

councillor or staff member, may appeal against that decision by giving written notice of the
appeal and reasons to the municipal manager within 21 days of the date of the notification of
the decision.”
Section 62(4)(b) provides that where the impugned decision is that of a municipal manager, the appeal authority
is the executive committee or executive mayor, or, if the municipality does not have an executive committee or
executive mayor, the council of the municipality.

ROGERS J
11
consent to a change of control in terms of the concession contract was a purely private
contractual matter, as was the process negotiated between the Municipality, Silulumanzi
and SAWW to accommodate a local BEE shareholder.

[16] In regard to conflict of interest, the relevant respondents stated that Mr Mabuza
had resigned from Silulumanzi in May 2018 for reasons unrelated to a possible process
to accommodate a local BEE shareholder. As to Professor Shongwe, they said that his
role in Silulumanzi was as the non-executive chair of the board and that he had played
no part in the selection process. In regard to the fact that Brain Gear was a newly
incorporated company, it had been made clear – so the relevant respondents said – that
the assessed experience and expertise was that of the individuals behind Brain Gear, not
the entity itself. They said that it was not unusual in empowerment transactions for a
special purpose vehicle to be established to take advantage of the opportunity; this was
often required by funders.

[17] There was a hiatus in the litigation from November 2019 to January 2021 while
Buhle Waste sought to compel the production of further documents. Having succeeded
in its application to compel, Buhle Waste filed a further supplementary founding
affidavit in January 2021, setting out what it regarded as revealing facts appearing from
the February 2018 agreement to which it had now obtained access. Buhle Waste also
stated (and this was not subsequently disputed) that the 28% shareholding was not
transferred to Brain Gear itself but to its wholly -owned subsidiary, Brain Gear
Investment South Africa (Pty) Limited (BGSA). According to Buhle Waste, it was
unlawful for the shares to be transferred to an entity that was not a bidder.

[18] Buhle Waste also filed an amended notice of motion in which it described the
impugned conduct of 14 November 2018 as being the Municipality’s consent to the

impugned conduct of 14 November 2018 as being the Municipality’s consent to the
transfer of SUN’s direct and indirect shareholding in Silulumanzi to SAWW . In
addition to setting aside the conduct in question, Buhle Waste sought an order
substituting itself in place of Brain Gear as the purchaser of the 28% shareholding for a
price of R221 million.

ROGERS J
12

[19] Supplementary answering affidavits and a replying affidavit were filed . The
review was enrolled for hearing in May 2022.

[20] On 26 May 2022, the first day of argument, SUN and Buhle Waste reached an
agreement in order to obviate the need for SUN to participate further in the case. This
was based on SUN’s view that the dispute did not relate to the transfer of control of
Silulumanzi from SUN to SAWW, but the subsequent proposed transfer of a 28%
shareholding in Silulumanzi from SAWW to the local BEE entity. The 28%
shareholding would only be available to a BEE entity (includ ing Buhle Waste, the
review applicant) if a 100% shareholding in Silulumanzi first passed from SUN to
SAWW.

[21] The above agreement was recorded in an order made on the same day (settlement
order). The settlement order reads (I substitute the abbreviated names used in this
judgment):

“1. The relief sought by Buhle Waste in this application does not extend to the
following:
1.1 the sale of shares agreement concluded on 21 February 2018 between
Silulumanzi, SAWW, SUN and SUSA, in terms of which SUN sold:
1.1.1 its shares in SUSA;
1.1.2 its shares in Silulumanzi to SAWW (the Sembcorp
Netherlands SPA);
1.2 the Municipality’s council resolution passed on 28 June 2018,
conditionally approving and consenting to the change of control in
Silulumanzi (June 2018 resolution).
2. The Sembcorp Netherlands SPA and June 2018 resolution are valid,
enforceable and binding.
3. Each party, as between Buhle Waste and SUN, shall pay its own costs.”

ROGERS J
13
[22] Argument then continued in relation to the other parties , after which judgment
was reserved. In its judgment the High Court condoned the delay in bringing the review,
reasoning that the conduct of some of the respondents in response to Buhle Waste’s
request for documentation had contributed to the delay; the delay was less than two
months; and the respondents had not claimed any prejudice. The High Court did not
deal with Buhle Waste’s alleged failure to exhaust the internal remedy.

[23] On the question whether the conduct of 14 November 2018 was susceptible to
review, the High Court held that the conclusion of the concession contract arose from
the legislative imperative contained in section 19 of the Water Services Act. The
contract regulated the delegation of a core function of the Municipality to Silulumanzi.
The High Court also referred to the right to sufficient water guaranteed in
section 27(1)(b) of the Constitution and the fact that, in terms of section 9(2) of the
Constitution, measures may be taken to advance categories of persons disadvantaged
by unfair discrimination. In negotiating for the inclusion of a local BEE shareholder ,
the Municipality had been inspired by the Broad-Based Black Economic Empowerment
Act14 (BEE Act). The Employment Equity Act15 (Equity Act) was also relevant, in the
High Court’s opinion. Furthermore, the High Court’s view was that the Municipality
had throughout acted from a position of superior authority. The need for its consent
under the concession contract had given the Municipality the “upper hand”, driven by
constitutional imperatives, in particular section 9(2). The selection of t he local BEE
shareholder was thus no private matter, and the Municipality’s conduct was reviewable
under PAJA.

[24] On the merits, the High Court found that, somewhere along the selection process,
the Municipality had abandoned its oversight role. Failure to fulfil the role specified in

the Municipality had abandoned its oversight role. Failure to fulfil the role specified in
the Council resolution was fatal to the decision of 14 November 2018 . Furthermore,
consent to the change of shareholding should never have been granted without due

14 53 of 2003.
15 55 of 1998.

ROGERS J
14
regard to all relevant facts, includ ing the alleged conflicts of interest and Brain Gear’s
misrepresentation of its BEE contributor level status . The Municipality had also
ignored information showing that Brain Gear did not have experience in the water
sector. The Municipality had also failed to interrogate the fact that, according to the
February 2018 agreement, the effective change of control had already occurred on
31 December 2017.

[25] The High Court thus made an order setting aside the decision of
14 November 2018 and remitted the request for consent to a change of control to the
Municipality for reconsideration , with directions as to the manner of reconsideration.
The High Court declared that, pending reconsideration, the suspensive conditions in the
Council resolution had not been fulfilled. The respondents , excluding SUN, were
ordered to pay Buhle Waste’s costs.16

16 The High Court’s order reads as follows in full (I substitute the abbreviated names used in this judgment):
“1. The decision taken by the Municipality on 14 November 2018 in terms of which it
consented to a change in control of Silulumanzi is declared unlawful and is hereby
reviewed and set aside.
2. The request for the consent regarding change in control of Silulumanzi is hereby
remitted to the Municipality for reconsideration of its decision of 14 November 2018.
3. In reconsidering its consent to a change in the control of Silulumanzi, the Municipality
shall take into account all what has been alluded to in this judgment regarding the
process that led to the appointment of [a] 28% [BEE] shareholder, its failure to exercise
oversight role as per its resolution of 28 June 2018 regarding the adjudication process,
issues of concern raised in this judgment leading to the appointment of Brain Gear as
a successful 28% [BEE] shareholder in Silulumanzi including the transfer of shares to
another entity after the consent was granted on 14 November 2018 and any other

another entity after the consent was granted on 14 November 2018 and any other
relevant factor and alluded to in this judgment.
4. A decision with regard to the reconsideration of its consent to a change in the control
of Silulumanzi should be concluded and delivered by not later than 17 October 2022.
5. Such a decision and the reasons thereof should be filed with the Court Registrar of this
Court and by email at [. . .].
6. The appointment of Brain Gear as a successful 28% [BEE] shareholder in Silulumanzi
and the effective date of the transfer of 28% [BEE] shareholding in Silulumanzi to
either Brain Gear or to BGSA based on the decision of 14 November 2018 is hereby
suspended pending the reconsideration of the decision to grant consent for a change in
the control of Silulumanzi.
7. It is hereby declared that pending the reconsideration of the municipal decision of
14 November 2014, the suspensive conditions in the resolution of 28 June 2018 have
not been fulfilled.
8. The Municipal Manager, the Chairperson of the Council of the City of Mbombela
Municipality, the Municipality, Silulumanzi, Brain Gear, SAWW and SUSA are
hereby ordered to pay the costs of the application including reserved costs and costs of

ROGERS J
15

Supreme Court of Appeal
[26] On petition the SCA granted leave to appeal, such leave having been refused by
the High Court. The Municipality did not prosecute its appeal, but the other High Court
respondents did. SUN appealed on the basis that the High Court’s review order had
undone the settlement order.

[27] The SCA rejected the appellants’ contention that Buhle Waste should have been
non-suited for failing to pursue an internal remedy. This was for two reasons. First, by
14 November 2018 Brain Gear had acquired rights pursuant to its selection. Therefore,
and in terms of section 62(3) of the Systems Act, 17 an internal appeal could not have
yielded effective relief. Second, an internal appeal would have been pointless because
of the Municipality’s stance that the selection of the BEE shareholder was the exercise
of a contractual power that had nothing to do with the Municipality. In regard to the
delay, the SCA found no reason to interfere with the exercise by the High Court of its
discretion to condone it.

[28] In regard to SUN’s position, the SCA reasoned that the settlement order was
unaffected by the High Court’s review order. The February 2018 agreement and the
Council resolution remained valid and enforceable . That had to be so, said the SCA,
otherwise Buhle Waste would have no grounds to challenge the decision of
14 November 2018 on the basis that the Municipality had failed to comply with the
conditions.

[29] Substantially for the reasons given by the High Court, the SCA agreed that the
decision of 14 November 2018 was “administrative action” reviewable in terms of
PAJA. The SCA also found no fault with the High Court’s reasoning on the merits of

employment of two counsel for Buhle Waste, such costs to be paid jointly and severally
the one paying the other to be absolved.”
17 Section 62(3) provides that “[t]he appeal authority must consider the appeal, and confirm, vary or revoke the

decision, but no such variation or revocation of a decision may detract from any rights that may have accrued as
a result of the decision”.

ROGERS J
16
the review. The SCA concluded that the impugned decision was unreasonable in that
“no reasonable person would have approved the sale of shares in Silulumanzi without
compliance with the conditions”.

[30] As to remedy, the SCA noted that the parties were in agreement that certain
orders made by the High Court were “unnecessary or tautologous”. On this basis, the
SCA set aside paragraphs 3 to 7 of the High Court’s order. Save as aforesaid, the appeal
was dismissed with costs.

In this Court
[31] In separate applications, Brain Gear (CCT 11/25), Silulumanzi , SAWW and
SUSA (CCT 12/25) and SUN (CCT 25/25) seek leave to appeal to this Court. Where
necessary, I shall refer to the applicants in CCT 12/25 collectively as the SAWW
parties. SUN’s application has been prompted by its understanding of statements made
in the other applications for leave to appeal to the effect that the SCA’s order, if left
undisturbed, will result in the conditions in the Council resolution being unfulfilled,
with the result that the suspensive condition in the February 2018 agreement will not
have been timeously fulfilled, causing the lapsing of that agreement. SUN’s application
for leave to appeal is conditional upon this Court finding that this is indeed the effect of
the SCA’s order.

Issues
[32] The submissions of the parties will be addressed in the context of the issues that
arise for determination, which are the following:
(a) Is this Court’s jurisdiction engaged and should leave to appeal be granted?
(b) Has the SCA order nullified the result achieved in the settlement order?
(c) Was any relevant decision taken by the Municipality on
14 November 2018?
(d) If so, was that decision “administrative action” for purposes of PAJA?
(e) If not, is that decision reviewable in terms of the principle of legality?

ROGERS J
17
(f) Are there grounds for interfering with the decision of the High Court,
confirmed by the SCA, that delay should be condoned?
(g) Was the internal appeal in section 62 of the Systems Act still available to
Buhle Waste when it learnt of the impugned decision? If so, should the
non-exhaustion of that remedy be overlooked ? Relatedly, what is the
significance of the fact that Buhle Waste did not seek condonation for
non-exhaustion?
(h) If the merits of the review are reached, should this Court interfere with
the conclusions reached by the High Court and SCA?
(i) If the appeal fails on its merits, should this Court interfere with the remedy
of remittal?

Issue (a): Jurisdiction and leave to appeal
[33] Issues (d) to (i) are constitutional matters. They concern the scope of PAJA and
legality review in a contractual setting as well as matters directly related to the review
of administrative action and the exercise of public power: delay, non -exhaustion of
internal remedies, whether a public body acted unlawfully and just and equitable relief.
Our constitutional jurisdiction is thus engaged.

[34] Issue (b) is a legal one about the interpretation of court orders. Although the
question is not of general public importance, it is necessary to answer it, because if it is
answered against SUN, the latter has contested the conclusions reached by the
High Court and SCA on issues (d) to (i).

[35] Issue (c) is a factual one. However, it is the gateway to the remaining issues. If
the High Court and SCA were right to focus on a decision said to have been taken on
14 November 2018, the constitutional questions already identified need to be answered.

[36] It is in the interests of justice to grant leave to appeal. Issues ( d) and ( e) raise
questions of importance in administrative law. As shall appear presently, the applicants
have reasonable prospects of success on those issues. If this Court finds against the

ROGERS J
18
applicants on issue (c) or (d), there may be a question as to whether it is in the interests
of justice for this Court to revisit the decisions of the courts below on issues (f) to (i),
but it will be convenient to defer that question until those issues are reached.

[37] Leave to appeal should thus be granted.

Issue (b): The effect of the SCA order on the settlement order
[38] The intention behind the settlement order was evidently to immunise the
February 2018 agreement from indirect attack. The formulation of the settlement order
is not a model of clarity. The fact that the Council resolution was not being attacked
did not mean that there was not an attack on the fulfilment of the conditions in the
Council resolution. If the conditions in the resolution were not fulfilled, the consent in
the Council resolution would lapse. Similarly, the fact that there was no attack on the
February 2018 agreement did not mean that the agreement was not subject to suspensive
conditions, one of which was the obtaining of consent from the Municipality within a
specified period.

[39] Accordingly, on a strict construction of the settlement order, a finding that the
conditions in the Council resolution were not lawfully fulfilled would le ad to a
conclusion that the relevant condition in the February 2018 agreement was not fulfilled,
with the resultant lapsing of that agreement. This, however, was not the intention of the
parties. It would not have been in the interests of any of them to press for a result that
could cause the February 2018 agreement to lapse. That agreement was needed in order
to vest 100% of the shares in Silulumanzi in SAWW as the source from which a 28%
shareholding could be transferred to a local BEE entity . SUN would not have been
willing to withdraw from active involvement in the High Court proceedings if there
were a risk that success in the review for Buhle Waste could lead to the lapsing of the
February 2018 agreement.

February 2018 agreement.

[40] In argument before us, none of the parties supported an outcome that might flow
from a strict construction of the settlement order. On ordinary principles relating to the

ROGERS J
19
fulfilment of suspensive conditions, there is no doubt that if a successful review resulted
in a conclusion that the conditions in the Council resolution were not lawfully fulfilled,
the consent in the resolution would lapse, with the result that the relevant condition in
the February 2018 agreement would not have been fulfilled. However, just and
equitable relief in review proceedings does not have to follow strict legal logic.

[41] The outcome a pparently intended by the parties to the settlement order, not
contested by anyone in argument before us, was to separate the Council resolution into
two distinct components: a consent to the transfer of control from SUN to SAWW; and
an obligation on SAWW to transfer a 28% shareholding to a local BEE entity selected
in the manner set out in the resolution. The second of these components was thereby
changed from a suspensive condition into a separate obligation, such that the granting
of consent (the first component) was treated as unconditional, the only question being
whether the further obligation (the second component) had been lawfully fulfilled.

[42] Paragraph 7 of the High Court’s order was not consistent with this understanding
of the consent order. However, that paragraph was among those set aside by the SCA.
Paragraphs 1 and 2 of the High Court’s order can stand without impairing the intended
effect of the settlement order. I t follows that the need for SUN to pursue an appeal in
this Court falls away.

Issue (c): Was any relevant decision taken on 14 November 2018?
[43] In their opposing papers in the High Court, some of the respondents pointed out
that the Municipality had not , on 14 November 2018 , taken the decision described in
the original notice of motion, namely a decision approving a transfer of shares from
Silulumanzi to Brain Gear. That is correct, but the error was corrected in the amended
notice of motion, and nothing more need be said about it.

notice of motion, and nothing more need be said about it.

[44] Some of the applicants in this Court argue that confirmation of fulfilment of the
conditions in the Council resolution occurred on 19 September 2018, not
14 November 2018. This is based on a signed endorsement at the foot of a letter

ROGERS J
20
addressed by Silulumanzi to the Municipality on 19 September 2018, notifying the latter
of the appointment of Brain Gear. The endorsement, pre-typed in the letter, stated that
the Municipality confirm ed by its signature that Silulumanzi had complied with the
terms of the Council resolution and that the consent had thus become unconditional.

[45] Buhle Waste had not seen this letter when it launched its review application in
July 2019. It formed part of the rule 53 record. In its first supplementary affidavit in
the High Court , Buhle Waste , after criticising the contents of the letter, said that “it
appears that it was pursuant to this letter ” that the Municipal Manager “appended his
signature and granted consent”. In traversing the supplementary affidavit, the
Municipality’s deponent , Mr Mojaki Mosala, Senior Manager: Legal Services,
responded to this allegation by admitting that on 19 September 2018 the Municipality
granted consent. However, earlier in the same affidavit, in setting out the factual matrix,
Mr Mosala said that the Municipality gave its approval for the transfer of shares to
SAWW on 14 November 2018. The answering affidavit did not contend that Buhle
Waste should have been targeting a decision taken on 19 September 2018 rather than
14 November 2018.

[46] None of the other respondents, in their High Court answering affidavits, stated
that, if the Municipality had taken any decision susceptible to review, it was taken on
19 September 2018 rather than 14 November 2018. SUN alleged that the
Municipality’s operative decision was taken on 28 June 2018, not on
14 November 2018. SUN’s contention was misconceived, because Buhle Waste was
not complaining about the resolution but about the subsequent conduct and the eventual
confirmation that the conditions in the resolution had been fulfilled.

[47] With reference to delay, Silulumanzi alleged in its answering affidavit that the

[47] With reference to delay, Silulumanzi alleged in its answering affidavit that the
decision sought to be reviewed was taken on 28 September 2018. This, however, was
the date on which the September 2018 agreement between SAWW, Silulumanzi and
Brain Gear was concluded ; it was not the date of any relevant decision by the
Municipality. In the same answering affidavit, Buhle Waste’s allegation in the first

ROGERS J
21
supplementary affidavit – that it appeared that it was pursuant to the letter of
19 September 2018 that the Municipal Manager appended his signature and granted
consent – was the subject of a bald denial.

[48] A fair reading of all the affidavits in the High Court leaves me in no doubt that
the case was not contested there on the basis that the Municipal Manager’s confirmation
of compliance with the conditions in the resolution occurred on 19 September 2018
rather than 14 November 2018. This may explain why the counter-signing of the letter
of 19 September 2018 was not the subject of further attention. It was signed “pp” with
a signature that appears to be that of the Deputy Municipal Manager,
Mr Spetho Mhlongo. This seems to have been overlooked by Buhle Waste’s deponent
when he said that the letter appeared to have been countersigned by the Municipal
Manager. There is no evidence that Mr Mhlongo had Mr Diamond’s authority to sign
on his behalf. Contemporaneous correspondence suggests that as at 19 September 2018
Mr Diamond was not yet satisfied that the conditions in the Council resolution had been
fulfilled.

[49] I thus consider that the courts below were correct to approach the case on the
footing that the relevant decision was taken on 14 November 2018. In any event, it
would not matter that the confirmation had already been given on 19 September 2018.
The mis-dating of the decision would not affect any of the grounds of review or defences
raised. Although an earlier date would add two months to the delay, this would not
have affected the adjudication of the delay defence. By the time Buhle Waste came into
possession of the letter of 19 September 2018, it had already launched the review
application. The fact that it discovered, after launching the review, that the relevant
decision might have been taken earlier than 14 November 2018 could thus have had no
bearing on the adequacy of its explanation for the delay.

bearing on the adequacy of its explanation for the delay.

[50] For the sake of completeness, I agree with the submission made by counsel for
SUN that the Council resolution did not require that the Municipal Manager’s
confirmation should be given within 90 days from the date of the resolution. What had

ROGERS J
22
to be concluded within 90 days was the process for the selection of the local BEE
shareholder. In the High Court, nobody suggested that the Municipal Manager’s
confirmation on 14 November 2018 came too late.

Issue (d): Did the decision of 14 November 2018 constitute “administrative action”?
The statutory definitions
[51] The next question is whether the decision of 14 November 2018 was
“administrative action” for purposes of PAJA. That expression is defined in section 1
of PAJA as meaning—

“any decision taken, or any failure to take a decision, by—
(a) an organ of state, when—
(i) exercising a power in terms of the Constitution or a provincial
constitution; or
(ii) exercising a public power or performing a public function in terms of
any legislation; or
(b) a natural or juristic person, other than an organ of state, when exercising a
public power or performing a public function in terms of an empowering
provision,
which adversely affects the rights of any person and which has a direct, external legal
effect.”

[52] The word “decision” is defined as meaning—

“any decision of an administrative nature made, proposed to be made or required to be
made, as the case may be, under an empowering provision.”

[53] “Empowering provision” is defined as meaning—

“a law, a rule of common law, customary law or an agreement, instrument or other
document in terms of which an administrative action was purportedly taken.”

ROGERS J
23
[54] “Organ of state” is defined as having the meaning assigned to it in section 239
of the Constitution, where it is defined as meaning—

“(a) any department of state or administration in the national, provincial or local
sphere of government; or
(b) any other functionary or institution—
(i) exercising a power or performing a function in terms of the
Constitution or a provincial constitution; or
(ii) exercising a public power or performing a public function in terms of
any legislation, but does not include a court or a judicial officer.”

[55] PAJA is the national legislation contemplated in section 33(3) of the
Constitution. In terms of the principle of subsidiarity, 18 the question whether conduct
is “administrative action”, and thus reviewable in terms of PAJA, depends on the
definition of that term in PAJA. In interpreting PAJA, a court must prefer an
interpretation that accords with the Constitution, 19 but ultimately it is the meaning of
“administrative action” in PAJA rather than in section 33 of the Constitution that is
decisive. If PAJA is under-inclusive, the Act must be frontally challenged.

The main cases relied upon in argument
[56] During argument we were referred to most of the leading cases on the often
difficult question of deciding whether conduct is “administrative action” for purposes
of PAJA, particularly where the immediate source of the power is contractual. The
authorities do not provide an altogether coherent and consistent set of principles.
Unsurprisingly, therefore, both sides were able to cite cases that appeared to support
their positions.


18 See Mazibuko v City of Johannesburg [2009] ZACC 28; 2010 (3) BCLR 239 (CC); 2010 (4) SA 1 (CC) at
para 73 and Esorfranki Pipelines (Pty) Ltd v Mopani District Municipality [2022] ZACC 41; 2023 (2) SA 31
(CC); 2023 (2) BCLR 149 (CC) at paras 43-6.
19 Grey’s Marine Hout Bay (Pty) Ltd v Minister of Public Works [2005] ZASCA 43; [2005] 3 All SA 33 (SCA);

2005 (6) SA 313 (SCA); 2005 (10) BCLR 931 (SCA) at para 22.

ROGERS J
24
[57] For the applicants, particular emphasis was placed on Trencon Construction.20
This Court said that while the decision in that case to award the tender was a matter of
public law, ordinarily an issue arising under the subsequent contract, such as a price
adjustment subject to negotiation, “ought to fall squarely within the domain of private
law”.21 Reference was also made to Langa CJ’s minority judgment in Chirwa,22 where,
after observing that the terms and conditions of service of employees of Transnet were
controlled through contracts,23 he said:

“However, it could be argued that the Legal Succession to the South African Transport
Services Act [9 of 1989], the statute founding Transnet, is the source of all powers and
functions providing the basis for its operational activities, including those of a
contractual nature. This argument cannot hold water. It would render the requirement
that the decision be taken ‘in terms of any legislati on’ meaningless, as all decisions
taken by a body created by statute would meet the requirement. If that is what the
legislature intended, one would have expected them to have said as much. Instead they
chose to distinguish between powers exercised by th e same body, including a body
created by legislation, according to the source of the power.”24

[58] Other cases cited in support of the view that in the present matter we are in the
realm of private rather than public law included Metro Inspection Services ,25 Logbro
Properties26 and Thabiso Chemicals.27 In regard to MTO Forestry,28 the SAWW parties

20 Trencon Construction (Pty) Ltd v Industrial Development Corporation of South Africa Ltd [2015] ZACC 22;
2015 (5) SA 245 (CC); 2015 (10) BCLR 1199 (CC).
21 Id at para 75.
22 Chirwa v Transnet Ltd [2007] ZACC 23; [2008] 2 BLLR 97 (CC); 2008 (3) BCLR 251 (CC); 2008 (4) SA 367
(CC); (2008) 29 ILJ 73 (CC). The majority judgment was given by Skweyiya J. Langa CJ’s judgment, concurring

in the result, was supported by Mokgoro J and O’Regan J.
23 Id at para 182.
24 Id at para 183.
25 Cape Metropolitan Council v Metro Inspection Services (Western Cape) CC [2001] ZASCA 56; 2001 (3) SA
1013 (SCA); 2001 (10) BCLR 1026 (SCA).
26 Logbro Properties CC v Bedderson N.O. [2002] ZASCA 135; [2003] 1 All SA 424 (SCA); 2003 (2) SA 460
(SCA).
27 Government of the Republic of South Africa v Thabiso Chemicals (Pty) Ltd [2008] ZASCA 112; 2009 (1) SA
163 (SCA); [2009] 1 All SA 349 (SCA).
28 South African National Parks v MTO Forestry (Pty) Ltd [2018] ZASCA 59; 2018 (5) SA 177 (SCA).

ROGERS J
25
argue that, regardless of whether one follows the approach in the majority judgments or
the dissenting judgment , the same conclusion would be reached on the facts of the
present case, namely that the Municipal Manager’s decision was not “administrative
action”. Brain Gear distinguished the majority judgments in MTO Forestry on the basis
that in the present case, unlike that case, the relevant provision of the concession
contract does not mirror any statutory power.

[59] For a comparative perspective of review proceedings in a contractual setting, the
SAWW parties referred to De Smith’s Judicial Review.29 They drew particular attention
to R (West),30 where the English Court of Appeal confirmed a line of authority in the
High Court that Lloyd’s of London did not operate in the public sphere, or at any rate
did not do so in relation to the types of functions under consideration in those cases ,
namely the functions performed by the Council of Lloyd’s and its committees when
exercising regulatory powers in relation to the affairs of members of Lloyd’s, members’
agents and managing agents of Lloyd’s syndicates.

[60] Buhle Waste, for its part, argue s that we should find that the present case is
covered by public law principles, with particular reliance on MTO Forestry. Buhle
Waste also refers to the following passage in Logbro Properties, where Cameron JA
said this with reference to Metro Inspection Services:

“The case is . . . not authority for the general proposition that a public authority
empowered by statute to contract may exercise its contractual rights without regard to
public duties of fairness. On the contrary : the case establishes the proposition that a
public authority’s invocation of a power of cancellation in a contract concluded on
equal terms with the major commercial undertaking, without any element of superiority
or authority deriving from its public position, does not amount to an exercise of public
power.”31

power.”31


29 Hare et al De Smith’s Judicial Review 9 ed (Sweet & Maxwell, London 2023) at 139-55.
30 R (West) v Lloyds of London [2004] EWCA Civ 506; [2004] 3 All ER 233.
31 Logbro Properties above n 26 at para 10.

ROGERS J
26
A mechanical or clerical act?
[61] Some of the applicants argue that the confirmation of 14 November 2018 was a
purely mechanical or clerical act falling outside the scope of “administrative action”.
The decision was said not to have adversely affected anyone’s rights or to have had
direct, external legal effect. We were referred in that regard to the decision in
Plover’s Nest.32

[62] I disagree. The Council delegated to the Municipal Manager the duty to confirm
that the conditions had been fulfilled. It was his confirmation that would signal that the
Council’s consent had become unconditional. The Council resolution was not
self-executing. The Municipal Manager could not lawfully have confirmed compliance
when objectively the re had not been compliance . C onversely, he could not properly
have withheld confirmation if objectively there had been compliance. His function was
not discretionary in the true sense. Nevertheless, the assessment of compliance was not
mechanical. It involved a consideration of whether there had been adequate oversight
and consultation.

[63] The Municipal Manager’s decision on 14 November 2018 rendered the
Council’s consent unconditional. At the same time, and by necessary implication, the
Municipal Manager confirmed that Brain Gear had been lawfully selected as the local
BEE shareholder. For as long as the Municipal Manager’s decision stood, the fact that
the consent was unconditional and that Brain Gear had been duly selected could not be
impugned.

[64] Plover’s Nest is distinguishable. In that case a municipal council granted
approval for a consolidation and subdivision subject to six conditions. The
municipality’s senior town planner wrote to the property owner to notify it of the
council’s resolution. Due to a n honest mistake , he mentioned only the first two
conditions. The SCA held that the town planner had not engaged in “administrative

32 Plover’s Nest Investment v De Haan [2015] ZASCA 193.

ROGERS J
27
action” by writing the letter; his only intention had been to communicate the council’s
decision. In the present case, by contrast, the council delegated a distinct power to the
Municipal Manager. Once exercised, that power had legal consequences for as long as
it stood.

Further requirements for “administrative action”, particularly “in terms of any
legislation”
[65] The Municipal Manager, in performing the confirmation function, was acting as
an “organ of state” contemplated in paragraph (a) of the definition in section 239 of the
Constitution. A municipality acts through its council and officials. In this instance, the
Municipal Manager was acting for the Municipality under delegated authority from its
Council.

[66] In order to constitute “administrative action”, the conduct must, by virtue of the
definition of “decision”, be “of an administrative nature”. I am inclined to think that
the Municipal Manager was indeed called upon to make a decision “of an administrative
nature”, but in the light of my conclusion on the “in terms of any legislation”
requirement, it is not necessary to express a definite opinion ; I shall assume that the
decision was “of an administrative nature” . The confirmation decision, as I have said,
had direct, external legal effect. It rendered the Council’s consent unconditional and
confirmed the due selection of Brain Gear as the local BEE partner. This had a direct
and external legal effect on SUN, SAWW, Silulumanzi, Brain Gear and Buhle Waste;
and the effect on Buhle Waste was adverse.

[67] The critical question, therefore, is whether the Municipal Manager’s decision fell
within the scope of paragraph (a) of the definition of “administrative action”. His power
to issue the confirmation contemplated by the Council resolution was not a power
conferred on him by the Constitution or by a provincial constitution. Was it an exercise
of a public power or the performance of a public function in terms of any legislation?33

of a public power or the performance of a public function in terms of any legislation?33

33 Although the expression “empowering provision” is defined in PAJA as including a range of instruments in
addition to legislation, that term is found only in paragraph (b) of the definition of “administrative action”. For

ROGERS J
28
For reasons that shall appear presently, I am willing to assume that the Municipal
Manager was exercising a public power or performing a public function. But was it “in
terms of any legislation”? A meaning must be given to th at phrase. To say that
everything an organ of state does is done in terms of legislation, because of some distant
connection to a legislative source, is to render the requirement “in terms of any
legislation” meaningless.

[68] Since the Municipal Manager’s confirmation decision was made pursuant to the
Council resolution, it is necessary to enquire, first, whether , in making the decision
reflected in the resolution , the Council itself was exercising a power or performing a
function “in terms of any legislation”. If the answer is no, it would follow in my view
that the Municipal Manager’s subsidiary confirmation decision was likewise not made
“in terms of any legislation”.

[69] In the present case, the awarding of the concession contract in 1999 took place
in terms of procurement legislation, and Silulumanzi’s function of supplying water was
also in terms of legislation, the Water Services Act. But we are not here concerned with
either of those functions. Pursuant to the procurement process, a contract was
concluded between the Municipality and Silulumanzi. That contract had a clause that
required the Council’s consent for a change in control of Silulumanzi. The requirement
for such consent is contractual. It is common ground that neither the
Water Services Act nor any other legislation required the contract to include a clause
forbidding a change of control without the consent of the local authority.

[70] Accordingly, when in June 2018 the Council gave its consent to the chang e in
control, albeit conditionally, it was not taking a decision “in terms of any legislation”.
It was exercising a power reserved to it by a contract.

It was exercising a power reserved to it by a contract.


purposes of paragraph (a) of the definition, the power or function must be exercised or performed in terms of
legislation. Paragraph (b) is not relevant to decisions of municipalities. The fact that a contract or a council
resolution might fall within the definition of “empowering provision” is thus not relevant in the present case.

ROGERS J
29
[71] The provisions in the resolution for the selection of a local BEE shareholder were
a facet of the exercise by the Council of its contractual power. It is once again common
cause that there was no legislative requirement that a sale of shares to a new controller
be accompanied by an allocation of shares to a local BEE entity. The Municipality
acknowledged that it could not have made this a condition of granting its consent. The
inclusion of the condition was a matter of negotiation, not legal imposition. It may be
that the Municipality was inspired to request this component by the transformational
goals served by section 9(2) of the Constitution and by the BEE Act and Equity Act,
but the Constitution and those Acts did not make it a legal requirement that a local BEE
shareholder be accommodated.

[72] I may add, in that regard, although I do not think it matters, that SAWW is itself
a BEE entity. The Municipality’s purpose was not to give the new controller a BEE
character; this it already had. The Municipality’s purpose, it appears, was to act on its
political mandate by advancing local interests through the retention of some of the
profits from the concession contract within the Mbombela economy.

[73] This being the character of the Council resolution, confirmation of compliance
with the conditions in the resolution cannot be regarded as a function performed in terms
of legislation. It follows in my view that the High Court and SCA erred in finding that
the impugned decision was reviewable in terms of PAJA.

Issue (e): Is the confirmation decision reviewable in terms of the principle of legality?
[74] The exercise of public power must at a minimum conform with the principle of
legality. This entails, among other things, that functionaries should do nothing beyond
the powers conferred on them by the law 34 and that their decisions should not be

34 Fedsure Life Assurance Ltd v Greater Johannesburg Transitional Metropolitan Council [1998] ZACC 17; 1998

(12) BCLR 1458 (CC); 1999 (1) SA 374 (CC) at paras 56-9.

ROGERS J
30
arbitrary – their decisions must be rationally related to the purpose for which the power
was given.35

[75] Was the Municipal Manager exercising a public power in November 2018?
There are no bright lines to distinguish private powers from public powers, especially
where some of the parties involved discharge public functions, but decisions of this
Court hold that the following factors are among those to be considered:
(a) the relationship of coercion or power that the actor has in its capacity as
a public institution;
(b) the impact of the decision on the public;
(c) the source of the power;
(d) the nature and subject-matter of the power; and
(e) whether there is a need for the decision to be exercised in the public
interest.36

[76] Once again, it is convenient to ask, first, whether the Council was exercising a
public power when it passed its resolution on 28 June 2018. If the answer to that
question is yes, it would follow inexorably that the Municipal Manager’s confirmation
decision was also an exercise of public power, because it was that decision which gave
finality to the Council resolution.

[77] Although the fact that the actor in June 2018 was a municipal council is not
decisive, the statutory nature of the actor is also not without significance . As to the
source of its power, the Council was exercising its contractual right to grant or withhold
consent to a transfer of control of Silulumanzi. Although this was a contractual power,
it was a power created in a contract concluded pursuant to a public procurement process.


35 Pharmaceutical Manufacturers Association of South Africa: In re Ex Parte President of the Republic of South
Africa [2000] ZACC 1; 2000 (2) SA 674 (CC); 2000 (3) BCLR 241 (CC) at para 85.
36 AMCU v Chamber of Mines of South Africa [2017] ZACC 3; 2017 (3) SA 242 (CC); 2017 (6) BCLR 700 (CC);
[2017] 7 BLLR 641 (CC); (2017) 38 ILJ 831 (CC) at paras 74 -5, quoting from Chirwa above n 22 at para 186
(judgment of Langa CJ).

ROGERS J
31
[78] Importantly, the concession contract is a contract contemplated by the Water
Services Act and involve s the performance by Silulumanzi of an important public
function. This leads naturally to the question why it was made a term of the contract
that there could not be a change in control of Silulumanzi without the Council’s consent.
Silulumanzi’s initial members were listed in an annexure to the concession contract and
there were provisions regulating the allocation of further shares to third parties approved
by the Council. These provisions, and the clause requiring the Council’s consent for a
change in control, show that the identity of Silulumanzi’s shareholders was a matter in
which the Municipality had an interest.

[79] We have no direct evidence on why, in 1999, the Municipality should have been
concerned about the shareholding in an d control of Silulumanzi, but there is only one
possible explanation: a belief that the identity and character of Silulumanzi’s controller
could have a beneficial or adverse effect on Silulumanzi and thus on the performance
of its water supply functions. We know that SUN, which acquired control of
Silulumanzi some time after the conclusion of the concession contract in 1999, was a
global organisation with expertise in water supply. When , in February 2018,
Silulumanzi sought the Municipality’s consent to a change of control, it set out the
benefits which Silulumanzi would reap from having SAWW as its new controller. This
included sophistication , knowledge and capacity to meet any unusual or additional
capital requirements Silulumanzi would have to see the concession contract to term .
SAWW would enhanc e its technical capabilities by selecting Arup as a technical
strategic partner. Moreover, in the bid process for selecti ng a local BEE entity, the
expertise and track record of bidders were important criteria.

[80] This, to my mind, shows that the power to grant or withhold consent to a change

[80] This, to my mind, shows that the power to grant or withhold consent to a change
in control was insisted upon by the Municipality to safeguard the proper performance
by Silulumanzi of the concession contract. A delinquent controller could lead to a
delinquent concessionaire. This is undoubtedly a public purpose, directly connected
with the function of a water services provider in terms of the Water Services Act.

ROGERS J
32
[81] We do not know whether the clause in the concession contract requiring the
Council’s consent for a change in control was negotiated specifically with Silulumanzi
or was a provision in the standard contract which the successful bidder in 1999 would
have to conclude. If it w ere part of a standard contract, one could say that this clause
was imposed on the successful bidder by the Municipality from a position of superiority.
Even if it were individually negotiated with Silulumanzi, the position subsequent to the
conclusion of the contract was that the Municipality had a power to grant or withhold
consent to a change in control. The clause did not say that consent to a change in control
could not be unreasonably withheld.37 There was thus a distinct element of superiority
vested in the Municipality when, in February 2018, Silulumanzi asked the Municipality
to consent to the change of control. They were, to a significant extent, at the mercy of
the Municipality as to whether their transaction could go ahead.

[82] This window of power that opened for the Municipality in the first half of 2018
may explain, at least in part, how the Municipality was able to get the other parties to
accept an arrangement by which a 28% shareholding would be made available to a local
BEE entity. It might well be so that the Municipality did not think it could stipulate this
as a condition for consenting to the change in control. But if the Municipality’s proposal
were not accepted, the other parties could not be certain that the Council would then
give its unconditional consent. Although a withholding of consent could perhaps have
been challenged in court, this would have come at a cost: legal expense, delay and the
uncertainties of litigation.

[83] Finally, in pressing for a 28% shareholding for a local BEE entity, the
Municipality was seeking to achieve a benefit for the economy in its municipal area,
while at the same time serving transformation objectives.

while at the same time serving transformation objectives.


37 For the limiting effect of a clause stipulating that consent may not be unreasonably withheld, see
paragraphs 73- 4 of Rogers AJA’s dissenting judgment in MTO Forestry above n 28 and the cases collected in
footnote 25 of that judgment. (It is not necessary, for purposes of the present case, to express any opinion on the
correctness of the differing judgments in that case.)

ROGERS J
33
[84] These various circumstances in their totality justify a conclusion that, in adopting
the resolution of 28 June 2018, the Council was exercising a public power. It follows,
as I have said, that the completion of that act through the Municipal Manager’ s
confirmation of compliance was likewise the exercise of a public power. The
confirmation decision was thus susceptible to review in terms of the legality principle.

Issue (f): Condoning delay
The High Court and SCA’s reasoning
[85] The High Court dealt with delay on the basis that the case was governed by
PAJA.38 The review was launched slightly less than two months after the expiry of the
180-day period specified in section 7(1) of PAJA. The High Court condoned the delay.
The High Court held that the Municipality and other parties had not played open cards
with Buhle Waste, which had contributed to the delay. Buhle Waste had obtained
certain information during June-July 2019 and did some research on Brain Gear.
According to Buhle Waste, it was only at that time that it could give its legal team the
relevant information. The Municipality had been aware in September 2018 that
Buhle Waste was disgruntled, and even then there was a threat of litigation. According
to the High Court, none of the respondents in that Court claimed any prejudice in
consequence of the two-month delay.

[86] The SCA, which likewise approached the case as a PAJA review, held that the
appellants in that Court had failed to make out a case that the High Court did not
exercise its discretion judicially. 39 In the SCA, the appellants also submitted that
Buhle Waste’s poor prospects on the merits should be taken into account. Since the
SCA ultimately found for Buhle Waste on the merits, this contention did not impress
that Court.


38 High Court judgment above n 2 at paras 107-9.
39 SCA judgment above n 3 at paras 29-30.

ROGERS J
34
The parties’ submissions on delay
[87] The submissions were made on the assumption that PAJA was applicable. The
applicants submitted that , in terms of section 9(1) of PAJA , Buhle Waste had been
required to make a formal application for condonation, which it had not done. The
explanation for the delay was said to have been unreasonable and did not cover the
entire period of the delay. Reference was made in that regard to this Court’s judgments
in Unitas Hospital40 and Ingonyama Trust.41

[88] The SAWW parties submit that the high watermark of Buhle Waste’s
explanation is that it was awaiting certain information from the Municipality. It would
be inimical to the purpose of the 180 -day requirement if a litigant were permitted to
delay launching proceedings “until it ambulated its way through a PAIA 42 application
process before the proverbial clock commenced ticking”. They submit that as early as
25 September 2018, when Buhle Waste’s attorneys wrote to the Municipality,
Buhle Waste was alive to the grounds of review and had the essential facts necessary to
launch it. To similar effect, Brain Gear argues that Buhle Waste was not entitled to wait
until it had all available facts.

[89] The applicants also place emphasis on the prejudice they have suffered on
account of the delay (more on this later). They criticise the High Court for finding that
they had not alleged prejudice.

[90] Buhle Waste submits, without further explanation, that delay is a “red herring”.
It argues that in any event it sought and obtained condonation from the High Court , a
decision subsequently confirmed by the SCA.


40 Van Wyk v Unitas Hospital [2007] ZACC 24; 2008 (2) SA 472 (CC); 2008 (4) BCLR 442 (CC) at paras 20 and
22.
41 eThekwini Municipality v Ingonyama Trust [2013] ZACC 7; 2013 (5) BCLR 497 (CC); 2014 (3) SA 240 (CC)
at para 28.
42 PAIA is the acronym for the Promotion of Access to Information Act 2 of 2000.

ROGERS J
35
Delay in legality reviews
[91] I have concluded that PAJA is inapplicable. Delay remains relevant, however,
in legality reviews. The analysis is done by answering two questions : (a) whether the
delay was unreasonable, a factual enquiry in which a value judgment is made in light
of all relevant circumstances; (b) if the delay was unreasonable, whether the court’s
discretion should be exercised to overlook the delay.43

[92] There are some similarities, but also some differences, in the approach to delay
in terms of PAJA and the legality principle. These differences were traced in
Buffalo City.44 For present purposes, the first three principles applicable to delay in the
context of a legality review, as explained in that case, can be summarised thus:
(a) First, w hereas section 7(1) of PAJA specifies a period of 180 days, a
legality review is not subject to a fixed period. The question whether a
delay is unreasonable “involves the exercise of a broader discretion” than
in the case of section 7 of PAJA. No explicit condonation application is
required in order for a court to undertake this analysis.
(b) Second, the reasonableness of the delay must be assessed with reference,
among other things, to the explanation offered. If the delay is explained
and justified, and the explanation covers the whole period, the delay is not
unreasonable. An unexplained delay, conversely, will necessarily be
unreasonable.
(c) Third, even if the delay is unreasonable, the court may overlook it , but
there must be a basis for the court to exercise its discretion. The basis
must be gleaned from the fact s made available and /or objectively
available factors. The approach to overlooking delay is flexible – a
“factual, multi-factor and context-sensitive framework”. Matters to be
considered include (i) potential prejudice to affected parties ; (ii) the

43 Khumalo v MEC for Education, KwaZulu-Natal [2013] ZACC 49; 2014 (3) BCLR 333 (CC); 2014 (5) SA 579

(CC); (2014) 35 ILJ 613 (CC) at para 49 and Department of Transport v Tasima (Pty) Ltd [2016] ZACC 39; 2017
(1) BCLR 1 (CC); 2017 (2) SA 622 (CC) at para 152.
44 Buffalo City Metropolitan Municipality v Asla Construction (Pty) Ltd [2019] ZACC 15; 2019 (4) SA 331 (CC);
2019 (6) BCLR 661 (CC) at paras 44-71.

ROGERS J
36
possible consequences of setting aside the impugned decision ;
(iii) whether prejudicial consequences can be ameliorated through a just
and equitable remedy; (iv) the nature of the impugned decision, including
the extent and nature of the alleged illegality and the merits of the review;
and (v) the conduct of the applicant and whether it has acted in good faith,
bearing in mind that state actors are subject to a higher duty to respect the
law.

[93] Since the High Court and SCA did not undertake the delay analysis within the
legality framework, this Court is at large to reassess the delay defence. Furthermore,
and contrary to the SCA’s finding, the High Court in my view committed several
material misdirections, which I shall identify later.

Was eight months prima facie unreasonable?
[94] In assessing whether a delay is unreasonable, and in addition to the matters
mentioned in Buffalo City, the nature of the decision and the likelihood of prejudice
occurring if the decision is implemented in the absence of a timely challenge must be
taken into account. What might be a reasonable period to obtain legal advice and
prepare papers in one case might be unreasonable in another case.

[95] The decision here was one which called for a prompt challenge. As an
unsuccessful bidder, Buhle Waste knew that Brain Gear would be concluding a contract
to buy a 28% shareholding in Silulumanzi for a price of some R221 million.
Buhle Waste would have foreseen that Brain Gear, like Buhle Waste itself, would be
obtaining finance to fund the share purchase. Having acquired the shares, Brain Gear
would likely receive dividends from Silulumanzi, and these would be used to repay
debt. The longer such a transaction remained unchallenged, the greater the potential
prejudice to Brain Gear and its funders, and the greater the difficulty in “unscrambling
the egg”, if and when a review succeeded.

ROGERS J
37
[96] In addition, a successful challenge to the impugned decision had the potential to
unravel the February 2018 agreement between SUN and SAWW. I have already
explained why that is so. This outcome was averted only by the settlement order of
May 2022. If the Municipal Manager’s confirmation remained unchallenged for any
significant length of time, a very large sum of money would in the meanwhile have been
paid by SAWW to SUN (prior to potential adjustments, the basic price was
R650 million), and dividends would have begun to accrue to SAWW as from the
effective date, 31 December 2017.

[97] According to Buhle Waste, it learnt of the impugned decision on
28 November 2018. It launched the review on 19 July 201 9, just under eight months
later. Given the nature of the impugned decision and the underlying transactions which
were likely to be affected, eight months would on the face of it be an unreasonable delay
in the absence of a proper explanation.

The explanation for the delay
[98] Buhle Waste’s initial founding affidavit gave scant detail to explain the delay.
Its deponent said that , after learning of the impugned decision, Buhle Waste sought
legal advice and further information from the Municipality in terms of PAIA. The
Municipality, according to the deponent, was slow in giving the information and did not
furnish all of it. Throughout the process, he said, Buhle Waste tried to engage with the
Municipality to reach an amicable resolution to avoid review proceedings.

[99] Although Buhle Waste’s attempt to get information from the Municipality was
again mentioned in the first and second supplementary founding affidavit s,
Buhle Waste’s deponent did not give dates as to when information was requested and
furnished. It appears, however, from other documents in the record that the PAIA
request was made on 17 October 2018 . On 25 October 2018 , the Municipality ’s
Mr Mosala wrote to Buhle Waste’s attorneys stating that it was making the requested

Mr Mosala wrote to Buhle Waste’s attorneys stating that it was making the requested
documents available. The attorneys were asked to contact Mr Mosala to make
arrangements for collection. There is evidence that at least one document in response

ROGERS J
38
to that request – PwC’s IDD report – was given to Buhle Waste on 1 November 2018.
All of this was before the impugned decision was even taken. There is no evidence of
requests for information made or responses given, or of interactions aimed at an
amicable resolution, during the period 28 November 2018 to 17 July 2019 – in other
words, during the period of just under eight months which Buhle Waste took to institute
the review.

[100] It was in its second supplementary founding affidavit that Buhle Waste’s
deponent made the statement mentioned by the High Court, namely that “[d]uring June
and July 2019 Buhle Waste had obtained some of the information and carried out some
of the research on Brain Gear” to enable it to brief counsel. No further details were
given. The nature of the research on Brain Gear was not explained. In its first and
second supplementary affidavits, Buhle Waste attached company search reports in
respect of Brain Gear and BGSA, but the earliest of those is dated 5 September 2019,
more than a month after the review was launched.45

[101] In its replying affidavit, Buhle Waste said that the respondents’ delay defence
was an attempt to escape scrutiny. Even if the respondents were correct about delay,
the circumstances of the case demonstrated that it was in the interests of justice to
entertain the review and to condone the delay. The Court, according to the deponent,
had the power to fashion an appropriate remedy.

Overlooking delay
[102] In my view, the delay was unreasonable. It is thus necessary to consider whether
the Court should nevertheless overlook the delay.

Prejudice to other parties
[103] In its initial answering affidavit, SAWW said that it was prejudiced by the delay.
Since 28 September 2018 Silulumanzi – and “effectively [SAWW] and Brain Gear” –

45 The report in question was attached to Buhle Waste's first supplementary affidavit filed on 26 September 2019.

ROGERS J
39
had been executing their contractual obligations under the concession contract. Setting
aside the impugned decision at such a late stage would prejudice not only SAWW and
Brain Gear, which had arranged their business affairs in line with the concession
contract, but also the many residents of the concession area. In its initial answering
affidavit, Silulumanzi said that prejudice was clear, without further elaboration.

[104] Brain Gear, in its initial answering affidavit , said that it had already incurred
substantial costs in preparing to close the September 2018 agreement with SAWW, with
closing anticipated to be completed within a few weeks. It had already paid a deposit
of R6 million pursuant to its selection as the preferred bidder and had paid advisers and
consultants about R1 million (lent to it by its shareholders) in preparing for the closure
of the agreement. The money would be lost if its selection as the preferred bidder were
set aside. Brain Gear, its deponent said, had conducted itself on the basis that Buhle
Waste had chosen not to challenge the Municipality’s decision . Buhle Waste had not
sought an interdict pending the review.

[105] Brain Gear pointed out that as early as 25 September 2018, about 10 months
before the review was launched, Buhle Waste’s attorneys had written to the
Municipality about its non-selection, threatening litigation if the Municipality granted
its approval. From that letter, according to Brain Gear, it was apparent that Buhle Waste
was already alive to the grounds which formed the basis of its review application.

[106] In response to the allegations in support of condonation contained in the second
supplementary founding affidavit, SAWW, SUSA and Silulumanzi , in a joint
supplementary answering affidavit, denied the absence of prejudice. The y submitted
that the impugned decision had been implemented and the prejudice would be enormous
to all the respondents.

to all the respondents.

[107] It appears from this affidavit that the transaction between SUN and SAWW was
closed out on 21 December 2018 at an adjusted price of R689 070 644 and that, with
effect from that date , Silulumanzi’s directorship changed in line with the change of

ROGERS J
40
control. The deponent stated that it had been the intention that the September 2018
agreement between SAWW and Brain Gear would be closed out at the same time. By
mid-December 2018 the parties were ready to do so; Brain Gear had paid its equity
contribution and had finalised its negotiations with the Public Investment Corporation
(PIC) to fund a portion of the price. At the last moment, however, the PIC refused to
sign the funding agreements, delaying closure. Brain Gear’s acquisition of the 28%
shareholding had only been closed out on 12 December 2019.

[108] Brain Gear, in its further affidavit, said that Buhle Waste was simply ignoring
the steps already taken by Brain Gear to give effect to the transaction. By the time that
this affidavit was filed (January 2022), so the deponent pointed out, more than two years
had passed since Brain Gear reached closure on the transaction. In anticipation of
closure (which was initially expected to occur in the latter part of December 2018, but
only occurred in December 2019), Brain Gear had dedicated resources to the
Silulumanzi board , assisted with operational matters and closed out various finance
agreements to fund the purchase price. Substantial costs had been incurred, such as
travelling for board and other meetings. It had repaid R48 million of the loan funding
and received dividends of about R51 million.

[109] It is thus apparent that even as at July 2019, when the review was launched, SUN,
SAWW and Brain Gear had incurred costs, received benefits and stood to be prejudiced
by any relief granted pursuant to the review. The prejudice deepened afterwards. I am
alive to the fact that some of the costs alleged by Brain Gear may have been incurred
after July 2019. However, SAWW and Brain Gear could not have been expected at that
late stage to put matters on hold , and contractually Brain Gear would not have been
entitled to do so unilaterally.

entitled to do so unilaterally.

[110] I have previously mentioned that there was a hiatus in the litigation between
November 2019 and January 2021, during which time Buhle Waste was seeking access
to a copy of the February 2018 agreement . This led to Buhle Waste’s second
supplementary founding affidavit, filed on 28 January 2021. Although Buhle Waste in

ROGERS J
41
that affidavit made much of the February 2018 agreement to which it had recently
obtained access, its additional points were misconceived. Contrary to its assertion, the
fact that the agreement had an effective date of 31 December 2017 did not mean that
control of Silulumanzi had passed to SAWW before the Council passed its June 2018
resolution. The effective date was simply part of a pricing mechanism. It would only
become relevant if and when the agreement became unconditional. 46 Similarly,
Buhle Waste’s claim that the accommodation of Brain Gear as a local BEE entity was
a sham had no factual foundation.

[111] Perhaps the relevant respondents in the High Court would have been better
served by promptly furnishing Buhle Waste with a copy of the February 2018
agreement. In the event, however, the delay which Buhle Waste brought about by
insisting on its production yielded nothing of any moment.

Nature of the impugned decision
[112] Turning to the nature of the impugned decision, it is of some significance that
the Municipality’s decision did not give rise to any transaction to which the
Municipality was a party. The Municipal Manager’s decision merely confirmed that a
consent to change in control had become unconditional. The real effect of confirmation
was on transactions between SUN and SAWW, and between SAWW and Brain Gear,
in other words on private parties. It was not within the power of the Municipality to
delay implementation of the agreements after receipt of the review application. The
contracts between SUN and SAWW and between SAWW and Brain Gear had
contractual force. Absent an interdict, which Buhle Waste never sought, the parties to
those contracts had to fulfil their obligations.

[113] As to the nature and extent of the alleged illegality, I would not characterise it as
egregious. One must bear in m ind that the review was directed at the conduct of the

egregious. One must bear in m ind that the review was directed at the conduct of the

46 Buhle Waste should have known this, because the agreement which the local BEE entity would have to sign,
and on which bidders were invited to comment, also had an effective date of 31 December 2017.

ROGERS J
42
Municipality, not the conduct of SAWW, Silulumanzi and Brain Gear. This distinction
was not always kept clearly in view by the High Court and SCA in their reasoning on
the merits of the review. The decision under review was not SAWW’s decision to select
Brain Gear as the local BEE entity. The only legitimate target of a review against the
Municipality was that the Municipal Manager should not have confirmed compliance
with the Council resolution because , as a fact , there was not adequate municipal
oversight in the selection process or consultation with the Municipality on the final
selection. No corruption or dishonesty was alleged against the Municipality. The
allegations of bias and nepotism were directed at SAWW and Silulumanzi, not the
Municipality. In essence, the complaint against the Municipality was that its officials
were too passive in the bid process.

Merits of the review
[114] In regard to the merits of the review (as a factor relevant to overlooking delay),
they are not as clear -cut as the judgments of the High Court and SCA suggest. Those
Courts saw the Municipality as having a more decisive role than is justified by the terms
of the Council resolution. The relevant municipal officials were required by the
resolution to “oversee” a process that was to be “administered” by SAWW and
Silulumanzi. It was not the function of the Municipality to determine what the process
would be or to implement it, though it could, of course, make proposals if it thought the
process inadequate. In truth, the process itself does not appear to have been the subject
of any serious criticism. It has not been said that the selection criteria and the rules
imposed on bidders fell short. The access given to municipal officials to the virtual data
room, the presence of its officials at the seven meetings of the steering committee and
the contributions they made at those meetings favour the conclusion that the
Municipality did indeed “oversee” the process.

Municipality did indeed “oversee” the process.

[115] The other relevant aspect of the Council resolution was that SAWW and
Silulumanzi were to select the local BEE entity “in consultation” with the municipal
officials. Now it is important to note that this condition imposed an obligation on
SAWW and Silulumanzi, not on the municipal officials. Where one party must consult

ROGERS J
43
with another before making a decision, it is usually that other party who complains if
no or inadequate consultation occurred. In the present case, the Municipality has not
complained that SAWW and Silulumanzi failed to consult with it on the selection of
Brain Gear.

[116] Where the exercise of a power is subject to a condition that the decision-maker
first consult with another , the other party must be given a reasonable opportunity to
state their views.47 The other party is not compelled to offer any views,48 but if it does
so the decision-maker must consider th em in good faith . The decision-maker is not,
however, obliged to act in accordance with the consulted person’s views.49

[117] The events relevant to consultation are those that happened in September 2018.
Mr Diamond and Mr Mosala from the Municipality were present at the second last
meeting of the steering committee on 7 September 2018. PwC presented its ranking
report as a slide presentation , show ing that Brain Gear had outscored Buhle Waste.
Mr Diamond said that he would like more information than was provided in the slides,
and he sought clarity on certain matters. PwC replied that further information would be
shared. SAWW’s represent ative asked PwC to share its full I DD report with the
Municipality. PwC had reservations about this, but proposed sharing an abridged
version. In regard to the final selection, Mr Diamond confirmed that it was important
for the successful bidder to be “clean” and to have a bona fide business with a good
track record. The same courtesies should be extended to Brain Gear and Buhle Waste.
He added, however, that it was not the intention of the Municipality “to participate in
the finalisation of the process”.


47 See Maqoma v Sebe N.O. 1987 (1) SA 483 (CK); [1987] 3 All SA 414 (Ck) at 489J-493B and Hayes v Minister
of Housing, Planning and Administration, Western Cape 1999 (1) SA 1229 (C) at 1240B-3B.

of Housing, Planning and Administration, Western Cape 1999 (1) SA 1229 (C) at 1240B-3B.
48 Port Louis Corporation v Attorney General of Mauritius [1965] AC 1111 (PC) at 1124D -E and Minister of
Home Affairs v Scalabrini Centre [2013] ZASCA 134; [2013] 4 All SA 571 (SCA) ; 2013 (6) SA 421 (SCA) at
paras 43-4.
49 Tlouamma v Mbethe, Speaker of the National Assembly of the Parliament of the Republic of South Africa [2015]
ZAWCHC 140; [2016] 1 All SA 235 (WCC); 2016 (1) SA 534 (WCC); 2016 (2) BCLR 242 (WCC) at paras 91-2.

ROGERS J
44
[118] On the same day, PwC wrote to the Municipality to say that it was willing to
furnish a copy of its ranking report to the Municipality , provided the latter
acknowledged that it was receiving the report for information purposes only and subject
to certain other qualifications stated in the letter. For the rest, w e do not know what
information was furnished to Mr Diamond pursuant to the matters raised at this meeting.
There is no complaint from the Municipality that it requested further information which
was not forthcoming.

[119] At the last steering committee meeting on 19 September 2018 , the Municipality
was represented by Mr Mhlongo, the Deputy Municipal Manager, and Mr Mosala. PwC
made a slide presentation about the final selection. In response to a question from
Mr Mhlongo, PwC confirmed that Brain Gear’s relevant experience was that of the
individuals, not the company. SAWW’s representative, Mr van Wyk, said that SAWW
had selected Brain Gear as their final preferred participant. Mr Mhlongo said he would
like to see “the composition of the preferred bidder”. Mr van Wyk confirmed that the
PwC evaluation report had been circulated in full. Mr Mosala asked that the PwC
presentation be made to Mr Diamond in order for him to be able to give his consent.
Mr van Wyk replied that he had consulted with Mr Diamond in order to convey who
the chosen participant was. SAWW’s attorney added that Mr Diamond had confirmed
at the second steering committee meeting that the process would not be delayed due to
his absence from meetings. The meeting ended with Mr Mhlongo conveying his thanks
to everyone involved for a process “professionally done”.

[120] Once again, we do not know whether information about the “composition of the
preferred bidder” was shared pursuant to Mr Mhlongo’s request. We do not have details
of Mr van Wyk’s consultation with Mr Diamond prior to the meeting. But once again,

of Mr van Wyk’s consultation with Mr Diamond prior to the meeting. But once again,
we do not have any complaint from the Municipality that information was not given or
that consultation did not occur.

[121] In the period between the last two meetings of the steering committee,
Mr Diamond, in correspondence, raised concerns about the integrity and neutrality of

ROGERS J
45
the selection process. On 12 September 2018 , he asked Silulumanzi and Mergence
Investment Managers (Pty) Limited (Mergence) (the fund manager for SAWW’s main
shareholder) to confirm that they had given no special favours to any bidder and to
disclose any possible unfair advantage, undue benefit or conflict of interest.

[122] Mergence sent its reply on 17 September 2018, stating that it was not directly
involved in the process but confirming that none of its employees had preferred any
participant in the bidding process.

[123] It appears from a chasing letter that Mr Diamond wrote on 16 September 2018
that SAWW furnished a response earlier that day. SAWW’s letter is not, however, in
the record. Mr Diamond’s concerns were apparently not fully assuaged by SAWW’s
response, because on 17 September 2018 he addressed a further letter to SAWW. The
further letter is not in the record, but something of its content can be gleaned from
SAWW’s reply dated 19 September 2018:
(a) Mr Diamond was apparently of the view that SAWW had “not kept to the
timeframes set by the steering committee” in finalising the process. In
reply, SAWW said it was unsure what Mr Diamond was referring to.
According to SAWW, it had been agreed at the previous steering
committee meeting that SAWW and Silulumanzi would present the final
selection at the meeting scheduled to take place that same day,
19 September 2018. The selection would in any event be made prior to
28 September 2018, the deadline set by the Council resolution.
(b) Mr Diamond had also expressed “serious concerns on the process”, which
he hoped SAWW would convey to Silulumanzi and Mergence. SAWW’s
response was to ask Mr Diamond to articulate his exact concerns about
the process so that they could respond in more precise terms.

[124] SAWW’s letter stated that Silulumanzi had replied or would reply separately.
Silulumanzi’s reply to Mr Diamond’s concerns is not in the record. There has been no

ROGERS J
46
complaint from the Municipality that Silulumanzi did not furnish a reply. Mergence,
we know, did reply.

[125] Whether Mr Diamond clarified his concerns in response to SAWW’s request is
unknown. SAWW’s request was not unreasonable. What is apparent is that, in addition
to the two steering committee meetings in September 2018, there was correspondence
between Mr Diamond and the other role players, not all of which has been placed before
us. Although SAWW had chosen Brain Gear as its preferred bidder by
19 September 2018, the process only had to be finalised by 28 September 2018. There
was, thus, still slightly more than a week for further engagement to occur pursuant to
Mr Diamond’s correspondence with SAWW and Silulumanzi.

[126] It is true that , as late as 11 October 2018 , Mr Diamond was seeking in -house
legal advice because he believed there had not been full compliance with the conditions
in the Council resolution, “in particular , the element of consultation”. On
17 October 2018, he received advice that the process had complied with the Council
resolution. It is unsatisfactory that the Municipality in its affidavits did not provide
further information about Mr Diamond’s concerns. Mr Diamond himself did not make
an affidavit. We do not know in what respects he was concerned about the element of
consultation. None of the parties has provided evidence that , in the period up to
28 September 2018, the Municipality provided input calling into question the selection
of Brain Gear.

[127] All of this places Buhle Waste at a distinct disadvantage in claiming an absence
of consultation. Usually, as I have said, complaints about an absence of consultation
are made by the person who should have been consulted. Here , the complaint is made
by an outsider to the process, one with no inside knowledge of what actually happened,
in circumstances where the Municipality itself has not ultimately contended that there

in circumstances where the Municipality itself has not ultimately contended that there
was inadequate consultation. Buhle Waste’s case, based on an absence of consultation,
must therefore be regarded as marginal at best.

ROGERS J
47
Buhle Waste’s objections to Brain Gear’s selection
[128] Much emphasis was placed by Buhle Waste, and by the High Court and the SCA,
on the conflict of interest involving Professor Shongwe and Mr Mabuza; Brain Gear’s
alleged lack of experience and track record; the red flag raised by Brain Gear’s alleged
misrepresentation of its BEE contributor level status; and the fact that the 28%
shareholding was transferred not to Brain Gear but its subsidiary BGSA.

[129] If the Municipality had been vested with the power to select the local BEE entity,
these criticisms could potentially have been raised as grounds to review its decision to
select Brain Gear. As a fact, however, the power did not vest in the Municipality and it
did not make the selection. These potential objections are, in truth, criticisms of the
decision made by SAWW and Silulumanzi to select Brain Gear. The review, however,
was not directed at any decisions made by SAWW and Silulumanzi.

[130] Insofar as the review of the Municipality’s conduct is concerned, the above
matters have a more tangential relevance. If these were matters that should have caused
SAWW not to select Brain Gear, one might say that a failure by the Municipality to
raise them with SAWW point s to a lack of adequate oversight and consultation. To
some extent, this requires an assessment of how material these various criticisms are. I
make the following brief observations in that regard.

[131] The alleged conflict of interest arose from the dual association of
Professor Shongwe and Mr Mabuza with Brain Gear and Silulumanzi. These
associations were fully disclosed in Brain Gear’s bid. According to SAWW’s
answering affidavit in the High Court, the Municipality was well aware of the dual
associations. The evidence in the High Court was , furthermore, that Mr Mabuza
resigned from Silulumanzi on 15 May 2018 with effect from 15 June 2018 for reasons

resigned from Silulumanzi on 15 May 2018 with effect from 15 June 2018 for reasons
unrelated to any proposed sale of shares to a local BEE entity. He was thus no longer
at Silulumanzi by the time the selection process got underway.

ROGERS J
48
[132] There is certainly discomfort at the fact that Professor Shongwe was associated
with one of the bidders while also being the chair of Silulumanzi’s board. On the other
hand, Silulumanzi was not the sole decision-maker in selecting the BEE entity. Indeed,
SAWW was the party that would be selling the 28% shareholding to the successful
bidder. The evidence in the High Court was that Professor Shongwe’s role at
Silulumanzi was non-executive and that he played no part in the selection of the bidder.
The evidence does not enable one to conclude that the Municipality was unaware of his
dual role or that information about it was hidden from the Municipality. This might
have been one of the concerns behind the letters Mr Diamond wrote in September 2018.
What he made of it we do not know , save that in the end he was willing to sign an
agreement confirming compliance with the Council’s conditions.

[133] As to t he objection that Brain Gear was a newly incorporated entity without a
track record or expertise, this fact was made clear in Brain Gear’s bid document. It was
clarified at the final meeting of the steering committee that the relevant experience in
relation to Brain Gear was that of the individuals and key personnel, not the company
itself. The Municipality thus knew the facts, and I am far from satisfied that it was
bound to resist Brain Gear’s selection for this reason.

[134] Brain Gear’s alleged misrepresentation of its BEE contributor level status was
explained in the answering papers as follows. At the time it submitted its bid,
Brain Gear did not consult a BEE rating agency. This was because the relevant Codes
of Good Practice stated that any enterprise with an annual turnover of R10 million or
less qualified as an “exempted micro -enterprise” and that any such enterprise which
was 100% black-owned qualified as a level one contributor. Because all of Brain Gear’s
shareholders were black persons, Brain Gear assumed that this was its status. It

shareholders were black persons, Brain Gear assumed that this was its status. It
transpired, however, that because one of the shareholders had been born in Malawi, this
person did not qualify as a “black person” for purposes of contributor level status,
despite the fact that he was a South African permanent resident. Brain Gear approached
a rating agency which issued a certificate stating that it was a level two contributor. On
the material before the High Court, there appears to have been no basis for thinking that

ROGERS J
49
Brain Gear had deliberately misrepresented its status, and the correct status was known
by the time the selection was made.

[135] Finally, I doubt that anything turns on the fact that the 28% shareholding was
transferred to BGSA rather than to Brain Gear. The explanation was that Brain Gear’s
funders wished to have a special -purpose vehicle. BGSA was a wholly -owned
subsidiary of Brain Gear. At any rate, no finger can be pointed at the Municipality. It
was told that Brain Gear had been selected. The transfer of the shares to BGSA occurred
subsequent to the impugned decision of 14 November 2018.

Ameliorating the effects of delay with a just and equitable order?
[136] Crafting a meaningful remedy that would ameliorate the effects of delay is not
possible. Even if the delay were overlooked and the merits were decided in favour of
Buhle Waste, this might be one of those rare cases where a court could do no more than
declare the Municipality’s conduct unlawful, without setting anything aside or remitting
anything for further consideration.

[137] Not all of the difficulties in this regard are attributable to the eight-month delay
in launching the review application. But the fact is that , by December 2019, both the
February 2018 and September 2018 agreements had been fully implemented. SAWW
and Brain Gear have now been involved as shareholders in Silulumanzi for more than
six years. Dividends have been received , funders repaid. It strikes me as practically
impossible to wind back the clock.

[138] Importantly, the only point of setting aside the Municipal Manager’s
confirmation would be to allow some further process of selection to take place. But
practically, how would this be done? It must be remembered that the Municipality was
not running a process to sell a 28% shareholding in Silulumanzi to the highest bidder.
The Municipality itself has never had any shares to sell. The idea, in June 2018, was

The Municipality itself has never had any shares to sell. The idea, in June 2018, was
for SAWW to make a 28% shareholding in Silulumanzi available to a local BEE entity.

ROGERS J
50
That was eventually done, and Brain Gear has owned the 28% shareholding for more
than six years.

[139] In the 2018 process, it was SAWW that set the price of R221 million for the 28%
shareholding. This made sense, because SAWW would be selling the 28% shareholding
to the successful local BEE entity. The price of R221 million was linked, even though
not with mathematical precision, to the price SAWW had to pay SUN for a 100%
shareholding in Silulumanzi. The February and September 2018 agreements had an
effective date of 31 December 2017. Although we do not have evidence as to how the
price was arrived at, Silulumanzi was required by clause 6.3 of the concession contract
to have no other business than the supply of water under that particular contract. The
price for a 100% shareholding and for a 28% shareholding, in transactions with an
effective date of 31 December 2017, must have been based on the remaining term of
the concession contract, that is, 11 years and 10 months.50

[140] If the confirmation were set aside and the matter remitted to enable a local BEE
shareholder to be selected afresh, what would the price for the 28% shareholding be? It
was no part of the function of the Municipality in 2018 to set the price, and it would be
no part of the function of the Municipality in 2026 to set the price. To require a
successful bidder to pay the 2018 price – R221 million – would make no sense, because
by the time a fresh selection process is finalised the concession contract is likely to have
no more than three years to run. To substitute a successful bidder as the 28%
shareholder with effect from 31 December 2017 would be entirely unrealistic. In the
intervening period of more than eight years, Brain Gear has been receiving dividends ,
repaying funders, contributing to the management of Silulumanzi and incurring related
costs. It is most unlikely that Brain Gear would be able to pay over to a successful

costs. It is most unlikely that Brain Gear would be able to pay over to a successful
bidder all dividends received from Silulumanzi with effect from 31 December 2017,
even if it were just to make it do so.


50 January 2018 to October 2029.

ROGERS J
51
Conclusion on delay
[141] In my opinion, this is not a case in which the unreasonable delay should be
overlooked. It is a case where a challenge had to be brought promptly and pursued as
a matter of urgency; this it was not.

[142] As I have already said, this Court is entitled to consider the delay defence afresh,
since it must be assessed within the framework applicable to a legality review rather
than PAJA. I have also said that the High Court committed material misdirections in
granting condonation under PAJA , and these would in any event have justified
intervention. Briefly, these were the misdirections:
(a) The High Court stated that the Municipality “and other parties” provided
“scant information” to Buhle Waste “before the alleged delay”, and there
was unwillingness to play open cards regarding requested information.
This was said to have contributed to the delay.
(b) However, there were no allegations by Buhle Waste – even vague ones –
about requests for information from any parties other than the
Municipality prior to the launching of the review in July 2019. In fact,
there is nothing to show that any of the parties who stood to suffer
commercial prejudice knew anything of the review before it was instituted
on 19 July 2019.
(c) The High Court did not ask itself whether any relevant requests for
information were made to the Municipality after 28 November 2018, the
date on which, according to Buhle Waste, it learnt of the impugned
decision. As I have said, there is no evidence that any such requests were
made. The only evidence of a PAIA request is the one made in
October 2018.
(d) If, in its reference to parties other than the Municipality, the High Court
had in mind the period between November 2019 and January 2021 during
which Buhle Waste was pressing for a copy of the February 2018
agreement, this was of no relevance in explaining the initial eight -month
delay.

ROGERS J
52
(e) The High Court repeated Buhle Waste’s statement in the second
supplementary affidavit that it was only during June -July 2019 that “it
obtained some information and carried out some research on Brain Gear”.
This vague statement, unsupported by any detail or documentary
corroboration, is worthless as an explanation.
(f) The High Court stated that none of the respondents claimed prejudice
occasioned by the delay of less than two months. That is a statement made
on the premise that a delay of 180 days or less would be reasonable. Even
in relation to PAJA, that proposition is unsound. Section 7(1) requires a
review to be instituted “without unreasonable delay and not later than
180 days after” the relevant date. A delay longer than 180 days is
presumptively unreasonable and requires condonation. It does not follow
that a delay of under 180 days is presumptively reasonable. 51 Moreover,
the High Court did not refer to any of the evidence of prejudice put up by
the respondents in that Court.

Conclusion
[143] In the light of the above conclusions, it is unnecessary to consider the question
of non-exhaustion of internal remed ies or to reach a definite conclusion on the merits
or about just and equitable relief. The appeal must succeed on the basis that Buhle
Waste was not entitled to bring a PAJA review and that its legality review should have
been dismissed because of unreasonable delay.

[144] As to costs, Buhle Waste is entitled to Biowatch protection52 as against the
Municipality.53 In other words, the Municipality must bear its own costs in the High

51 Opposition to Urban Tolling Alliance v South African National Roads Agency Limited [2013] ZASCA 148;
[2013] 4 All SA 639 (SCA) at para 26, approved by this Court in Buffalo City above n 44 at para 49.
52 Biowatch Trust v Registrar, Genetic Resources [2009] ZACC 14; 2009 (6) SA 232 (CC); 2009 (10) BCLR 1014
(CC).

(CC).
53 This flows from the fact that a review application is ordinarily a constitutional matter: Nu Africa Duty Free
Shops (Pty) Ltd v Minister of Finance [2023] ZACC 31; 2023 (12) BCLR 1419 (CC); 2024 (1) SA 567 (CC) at
para 149 (majority judgment) and paras 279-84 (minority judgment, where the authorities are reviewed).

ROGERS J
53
Court.54 The same should apply in my view to Silulumanzi. It performs a public
function in terms of the concession contract. Silulumanzi must, thus, bear its own costs
in the High Court, the SCA and in this Court.

[145] No costs order was made by the High Court against SUN. To the extent that
SUN needed appellate intervention in the SCA, this was not because of any action by
Buhle Waste. SUN did not need appellate intervention in this Court, nor did
Buhle Waste argue for a position adverse to SUN. SUN should thus bear its own costs
in the SCA and this Court.

[146] There is no basis, however, for costs not to follow the result as between
Buhle Waste on the one hand, and SUSA and Brain Gear on the other, they being private
parties.

Order
[147] The following composite orders are made in Cases CCT 11/25, CCT 12/25 and
CCT 25/25:
1. In Case CCT 25/25, n o order is made on the application by Sembcorp
Utilities (Netherlands) NV (SUN) for leave to appeal , save in respect of
costs as reflected below.
2. Leave to appeal is granted in Cases CCT 11/25 and CCT 12/25.
3. The appeals in Cases CCT 11/25 and CCT 12/25 succeed.
4. The order of the Supreme Court of Appeal is set aside and the following
order is substituted in its place:
“(a) The appeals succeed.
(b) The order of the High Court is set aside and replaced by the
following:
‘(i) The application is dismissed.

54 The Municipality did not participate in the SCA appeal or in this Court.

ROGERS J
54
(ii) The first, second and third respondents (the Municipal
Manager of the City of Mbombela Municipality, the City of
Mbombela Municipality, and the Chairperson of the
Council of the City of Mbombela Municipality ) and the
fourth respondent (Sembcorp Silulumanzi (RF) (Pty)
Limited) (Silulumanzi) must bear their own costs.
(iii) The applicant, Buhle Waste (Pty) Limited (Buhle Waste) ,
must pay the costs of the fifth respondent , Brain Gear
Investments (Pty) Limited (Brain Gear), the seventh
respondent, South African Water Works (Pty) Limited
(SAWW) and the ninth respondent , Sembcorp Utilities
South Africa (Pty) Limited (SUSA) , including the costs of
two counsel where employed.’
(c) Silulumanzi and SUN must bear their own costs on appeal.
(d) Buhle Waste must pay the costs of Brain Gear, SAWW and SUSA
on appeal, including the costs of two counsel where employed.”
5. SUN and Silulumanzi must bear their own costs in this Court.
6. Buhle Waste must pay the costs of Brain Gear, SAWW and SUSA in this
Court, including the costs of two counsel where employed.

For the Applicant in CCT 11/25 , Fifth
Respondent in CCT 12/25 and Eighth
Respondent in CCT 25/25:

For the First Respondent in CCT 11/25,
CCT 12/25 and CCT 25/25:

For the Fifth, Sixth and Seventh
Respondents in CCT 11/25 and
CCT 25/25 and the Applicants in CCT
12/25:

For the Eighth Respondent in
CCT 11/25, Sixth Respondent in CCT
12/25 and Applicant in CCT 25/25:
J Whitaker and Z Sing instructed by
Van Der Schyff and Associates
Incorporated

J G Wasserman SC and S Tshikila
instructed by Malatji and Co Attorneys

G Marcus SC and S Pudifin-Jones
instructed by Garlicke and Bousfield
Incorporated


K Hofmeyr SC and M Salukazana
instructed by Deneys Reitz Incorporated
t/a Deneys