COMPETITION TRIBUNAL OF SOUTH AFRICA
Case no.: 101/LM/Oct05
In the Large Merger between:
Murray & Roberts Limited Acquiring
Firm
And
Concor Limited Target Firm
Panel: D Lewis (Presiding Member), Y Carrim (Tribunal Member) and
N Manoim (Tribunal Member)
Date of Hearing: 14 June 2006
Order issued on: 14 June 2006
Reasons issued on: 11 October 2006
Reasons for Decision
APPROVAL
1] On 14 June 2006, the Competition Tribunal issued a Merger Clearance Certificate
approving the transaction between Murray & Roberts Limited and Concor Limited. The
reasons for this decision follow.
THE TRANSACTION
1.i.1] In terms of the proposed transaction, Murray & Roberts Limited (“M&R”) will acquire
the entire issued share capital of Concor Limited (“Concor”) from its shareholders. 1
The transaction will be effected either by a scheme of arrangement or a substitute
offer.
2] M&R is the main operating subsidiary in the group of companies controlled by Murray
& Roberts Holdings Limited (“M&R Holdings”), a public company listed on the JSE.
The subsidiaries of M&R Holdings include the following firms: Murray & Roberts
Construction, Murray & Roberts Engineering Solutions, Murray & Roberts Marine,
Murray & Roberts Steel, Murray & Roberts Concessions and Murray & Roberts
Cementation.
3] Concor is listed on the JSE and is controlled by Hochtief AG (“Hochtief”), a German
company. Concor has the following operating divisions: Concor Building Division,
Concor Civils, Concor Engineering, Underground Mining, Opencast Mining, Concor
Roads, Concor Technicrete andConcor Facility Management.
4] M&R believes that the acquisition will inter alia be value enhancing for it and will give it
access to capabilities that M&R do not currently have, namely the Technicrete and
open cast mining division of Concor. For Concor, its controlling shareholder, Hochtief
wishes to exit its investment in Concor for strategic business reasons. 2
THE MERGING PARTIES’ ACTIVITIES
5] Through its subsidiaries, M&R Holdings is involved in construction, engineering,
construction materials and services and fabrication and manufacturing. Concor is
involved in civil engineering, building, structural and mechanical engineering, roads
construction, opencast mining contracting, underground mining contracting,
manufacturing of building and mining products and facilities management.
manufacturing of building and mining products and facilities management.
1 Other than the Concor shares held by Mexican Wave Investments (Pty) Ltd a wholly owned subsidiary
of M&R.
2 For more details on the transaction rationale, see pages 478 of the Commission’s record.
2
COMMISSION’S FINDINGS
6] The proposed transaction involves a number of product markets both at a vertical and
horizontal level. The investigation of the transaction conducted by the Commission
was lengthy and comprehensive.
7] The Commission and the parties are in agreement that overlaps occur in the following
areas of activity: Building/Construction, Civil Engineering, Engineering (general),
Roads, Facilities Management/Concessions and Underground Mining. 3
8] There is also a degree of vertical integration that occurs in that both parties supply
products used in the downstream markets for building/construction, roads construction
and civil engineering.
Vertical markets
9] The Commission identified several upstream markets in which the merging parties are
active. However, an examination of the market shares of the merging parties in all the
markets reveals that there are alternative suppliers and that foreclosure is not likely to
result from the merger in any of the identified markets. 4 Since these vertical markets
raise no competition concerns we do not deal with these any further in these reasons.
Horizontal markets
10] The Commission identified and analysed the following product markets:
i. The market for building construction (focusing on the large project sub market);
ii. The market for the provision of civil engineering services (focusing on the large
3 See page 65 of the Commission’s record (page 23 of the parties competitiveness report) and pages 67
of the Commission’s report.
4 See pages 3140 for more detail regarding the market share that would be enjoyed by the merged entity
3
project sub market);
iii. The market for the provision of engineering (general) services;
iv. The market for the provision of roads construction;
v. The market for the provision of facilities management; and The market for the
provision of underground mining services.
11] The market shares for the merged entity and changes in the HHI calculations in the
markets for the provision of engineering (general) services, underground mining, and
facilities management were notably high thereby raising prima facie competition
concerns. 5
12] In the course of the Commission’s investigation, an objection was received by the
South African National Roads Agency Limited (“SANRAL”) in relation to the market for
the provision of facilities management.
13] SANRAL is mandated under the National Roads Act 1998 to develop, maintain and
manage South Africa's national road network of some 16000kms. 6 SANRAL must also
strategically plan, design, construct, operate, rehabilitate and maintain the roads. 7 As
part of its mandate, SANRAL is responsible for the awarding of contracts for toll road
concessions and toll road operations. 8 SANRAL’s submissions were limited to the
market for toll road operations.
14] The Commission, after considering SANRAL’s objection, concluded that no
competition concerns arose from any of the markets identified above and accordingly
recommended that the transaction be approved unconditionally.
5 See annexure A attached to these reasons.
6 Page 3 of the transcript.
7 SANRAL was established in 1998 and is an independent, statutory company registered in terms of the
Companies Act. The South African government, represented by the Minister of Transport, is the sole
shareholder and owner of the Agency. www.nra.co.za
8 It is not clear from the evidence, how SANRAL determines which road should be upgraded through a
private concessionaire’s contract and which is to be upgraded by SANRAL. What is evident is that
SANRAL retains the choice.
4
15] A hearing was held on 14 June 2006. The following witnesses testified at the hearing:
i. Mr. Nazir Ali ;9
ii. Mr. Wynand Dreyer, 10
iii. Mr. Mario Gericke, 11
iv. Mr. Trevor Robinson, 12
v. Mr. Henry Laas. 13
16] Apart from SANRAL’s objection in relation to the market for the provision of facilities
management, no objections or concerns from customers were received in relation to
any of the other markets. The Tribunal had a residual concern about the market for
underground mining, which was adequately addressed in the hearing. (See note
below)
17] Accordingly, the only market in respect of which any objections were raised was the
market for facilities management. Most of the hearing and witness testimony was
focused on this market.
18] After hearing the witnesses and considering the evidence placed before the Tribunal
approved the merger unconditionally and issued a certificate on 14 June 2006. These
are the reasons for that order.
19] In these reasons, we deal only with the market for toll road operations (as a sub
market of facilities management). We do not deal with any of the other relevant
markets identified by the Commission in its investigation because in our view the
competition evaluation of the toll road operations market applies equally to any of the
other relevant markets identified by the Commission.
9 Chief Executive Officer of South African National Roads Agency Limited. Mr Ali was represented by Bell
Dewar & Hall Inc.
10 A director of Concor and Managing Director of Concor’s facility management division.
11 A manager at Northam Platinum.
12 Executive director and Concor Limited and Managing Director of Concor Mining.
13 Managing Director of Murray and Roberts Cementation.
5
RELEVANT GEOGRAPHIC MARKET
20] Both the Commission and the parties were in agreement that the relevant geographic
market in respect of all the above markets is national. We will accept, for the purpose
of analysing this transaction, that the relevant geographic market in respect of all the
above markets is national. 14
RELEVANT PRODUCT MARKET
The Market for Facilities Management
21] Facilities management involves the provision of management, administration and
technical services with regard to property belonging to third parties. The merging
parties’ activities in this market overlap only in respect of toll roads.
22] The parties and the Commission are in agreement that that this market can be divided
into two sub markets viz. Toll road concessions and Toll road operations.
Toll Roads Concessions
23] A toll road concession is a contract that is awarded to a consortium, for the
construction, operation and maintenance of a toll road. F irms who bid for such
concessions usually enter into consortia or joint ventures with other private parties,
commonly constituted by contractors, designers, engineers and financial institutions.
These third parties undertake to fund the construction, operation and maintenance of a
toll road. In return for their investment the successful consortia are entitled to collect
14 We have previously stated that our acceptance of a national market for these product markets “ does
not mean that international firms are unable to participate in the national South African markets for the
provision of these services.“ Murray & Roberts Limited and The Cementation Company (Africa) Limited
Case no: 02/LM/Jan04 at Paragraph 20.
6
tolls for a specified period. Hence, they usually conduct toll road operations as part of
the concession contract. The toll road concession includes a number of relevant
markets such as road construction, engineering services and toll road operations. 15
Toll Road Operations
24] Toll road operations generally involve the collection of tolls and the management and
maintenance of toll gates and roads.
25] The first toll road operations in South Africa commenced in 1983. Until 2001,
government sponsored toll road operations were conducted under operations
contracts in which most technical functions for a particular operation were carried out
on a selected subcontract basis. For example there would be subcontractors for each
of the aspects of the operations such as lane equipment installation, management of
information systems and, electromechanical work. This led to a plethora of operators
or service providers who had to be supervised and managed individually. Over time, it
became increasingly difficult to apportion responsibility for any revenue loss amongst
several subcontractors and to implement or improve supervision and controls to
remedy fraud or negligence. SANRAL embarked on a remodelling of these contracts
by transferring the risk and compliancy requirements to a single operator.
26] The comprehensive toll road operations and maintenance contract (CTROM) model
was implemented by SANRAL in order to better manage delivery, performance and
risk in relation to toll road operation by awarding a comprehensive contract to one
operator, who would be legally liable for compliance with all the terms and conditions
of that comprehensive contract. Routine road maintenance services were included in
these contracts in order to attract the medium and large contractors. 16 The operator
could subcontract with any number of other suppliers provided that it did so in terms of
could subcontract with any number of other suppliers provided that it did so in terms of
15 Examples of private concessionaires are Bakwena, N3TC, TRACC.
16 See page 1672 of the Commission’s record. Correspondence from Bell Dewar Hall to Commission
dated 26 April 2006.
7
the specifications prescribed by SANRAL. 17 These contracts are awarded through a
comprehensive tender process of relatively long duration, usually five years.
27] In parallel with this development was the continuation of the toll road concession
market in which SANRAL awarded a concession to a private sponsor, usually a
special purpose vehicle, to construct, operate and maintain a toll road. As stated
above these special purpose companies also conducted toll road operations as part of
their concession agreements.
28] A toll road operator may render toll road management services to either the
concessionaire who is entitled to recoup its investment through the collection of toll
fees or SANRAL, who has issued a tender for the operation and maintenance of toll
roads that it has constructed. The skills, technological expertise and experience
required for the operations and maintenance of toll roads would be the same whether
the construction of the road is done by privately sponsored concessionaires or whether
it has been constructed by SANRAL.
29] Hence, according to the merging parties the market for toll road operations would
include all those operators who render toll road management services to whosoever
requires it, whether this is the concessionaire or SANRAL. The parties provided the
following table of estimated shares for the toll road operations market:
Firm % Market share
Tolcon (M&R) 24.1
Intertoll 41.0
Tracc / Basil Read 17.0
Concor 5.3
Dragados 12.6
Total 100
30] Post merger, the merged entity will enjoy 29.4% of this market.
17 SANRAL letter 26 April 2006 at page 16711675 of the Commission’s record.
8
SANRAL’s submissions
31] In its submissions to the Commission, SANRAL initially argues for a further
segmentation of the market for toll road operations. It submits that the market should
be divided into (i) the market for privatelysponsored toll road operations and (ii) the
market for governmentsponsored toll road operations roads. 18
32] According to SANRAL, privatelysponsored toll road operations involve the
construction of the toll road itself. Governmentsponsored toll road operations, do not
involve the construction of the road itself and unlike in the privatelysponsored toll road
operations market, these companies would manage toll roads and collect toll fees on
behalf of government and charge a fee for the services rendered. This seems to be
the first basis of market segmentation put forward by SANRAL.
33] As a second basis for market segmentation SANRAL submits that the market for
governmentsponsored toll road operations is “not an easy market and is in fact very
competitive from a pricing point of view and has a different composition of efficiency
gains than toll road operations of a privatelysponsored road which is operated within
the confines of a concession contract.” 19
34] What SANRAL seems to be saying is that the basis for distinction was the size of the
margin that the operator made. Firms made a lower margin in the CTROM
(governmentsponsored) market than those in the concession (privatelysponsored)
market. Therefore, the market could be segmented on the basis of low and high
margins and only three firms operated in the governmentsponsored toll road
operations market, viz. Tolcon (M&R), Concor and Intertoll (Group 5). 20 This merger
18 According to SANRAL, the difference between the two is inter alia that under a privately sponsored toll
road, the concession company has to fund the construction of the toll road while under a CTROM or
government sponsored the road has already been constructed.
19 Page 1673 of the Commission’s record.
20 According to SANRAL, there were only 3 (three) players in the market for government sponsored toll
road operations. TRAC should not be included in the table above, as it is a special purpose vehicle
established for the sole purpose of operating the N4 Concession (Maputo Development corridor) and not
9
would therefore result in the current toll road operators being reduced from three to
two and this would increase the likelihood of coordination in the market. In addition,
bidders may be less competitive because of the lack of threat of a third bidder.
According to SANRAL, if the lowest tender were disqualified for some reason,
SANRAL would be compelled to accept the higher tender. SANRAL believed that the
reduced competitive environment would effectively defeat the benefits of the tender
process.
35] Furthermore, argued SANRAL, barriers to entry were high which meant that very few
players would enter the market in the foreseeable future. It submitted that the toll road
operations market is a highly specialised technical and financial field with highrisk
exposure and low profit margins, and substantial capital facilities were required.
Hence, it argued that the proposed transaction would substantially lessen competition
and requested the Tribunal to prohibit or approve it on conditions that would address
the competition concerns raised by SANRAL.
36] The Commission’s view was that its assessment of the market would remain the same
whether or not there was any further segmentation because these were bidding
markets. In addition, it argued that barriers to entry in the toll road operations market
were surmountable and there were sufficient potential entrants to alleviate any
competition concerns that may arise from this merger.
37] The parties, in response to SANRAL’s submission, agreed that a distinction could be
made from a commercial perspective between privatelysponsored toll road operations
and governmentsponsored toll road operations, in that –
i. The party actually performing the toll road operations in privatelysponsored toll
road operations generally formed part of the consortium that was granted the toll
road operations generally formed part of the consortium that was granted the toll
road concession. As privatelysponsored toll road operations were funded by
authorised to tender for further Govt. sponsored toll operations. Regarding Dragados, SANRAL submits
that it is involved only in the construction of roads and not the operation of toll roads in SA. Its
involvement is as part of a consortium which tenders for a concession for a privately sponsored toll road.
10
consortium members and not government, this meant that the toll road operator
would generally require significant financial resources in order to perform its
funding obligations to (and participate in) the consortium.
ii. With governmentsponsored toll road operations, the tolls were paid directly to
SANRAL and the toll road operator merely provided toll road operations for a
fee. Toll road operators were not required to have the same financial resources
as required for privatelysponsored toll road operations.
38] Both the merging parties and SANRAL agree that there is a difference between the
two operations in the achievable margins, but while SANRAL argues that this should
be a basis for market segmentation, the merging parties argue the contrary. The
merging parties argue further that from a competition law perspective, the relevant
market segment remained that of providing toll road operations and to distinguish
between separate markets for privatelysponsored toll road operations and
governmentsponsored toll road operations would mean distinguishing a relevant
market merely on the basis of the identity of the “customer” (SANRAL in government
sponsored operations and the private concession company in privatelysponsored
operations). In any event, they submitted, the nature of toll road concessions was
such that SANRAL (as the regulator tasked to act on behalf of road users) was
ultimately the “customer” for both types of toll road operations.
39] Evidence led by the merging parties and SANRAL’s CEO, Mr Nazir Ali indicated that in
CTROMs, (as opposed to privatelysponsored toll road operations), the margins are
smaller due to the highly regulated nature of the contracts. Opportunities for improving
margins were limited and were dependent to a large extent on how effectively
operators could manage their costs. These opportunities were further limited by the
fact that the technical specifications and contractual terms of these contracts were
prescribed.21 The more stringent these specifications and conditions, the more costly
the operations. The contracts often required the purchase of costly equipment and
software. The size of the penalty imposed by SANRAL in the event of fraud or non
21 By SANRAL. See pages 14591658 of the Commission’s record “Proforma Project documents for
Road and Bridge works and Directives for the Compilation of Tender and Contract documents”
11
performance also impacted on margins in the CTROM contracts. 22
40] The margins in privatelysponsored toll road operations, on the other hand, were
higher because the operations were usually conducted within the concession contract,
which included a range of other commercial activities. This enabled the operators to
spread their risks and costs across the concession activities. Greater efficiencies and
higher margins could be achieved by better planning, lower construction costs and
discounts.23
41] We accept that toll road operators, as part of concession agreements, may
make a higher margin than those in CTROM contracts and could possibly
require fewer financial resources. However, we would be hesitant to accept
differences in margins as a sole basis for market segmentation. 24 By and large,
margin achievements are dependent on far too many variables. 25
42] In support of its contention that there were only three players in the toll road operations
market, Mr Ali testified that only the three companies identified had actually bid for
CTROM contracts and had been awarded these. 26 These are listed as Tolcon
(M&R), Concor and Intertoll (Group 5). It argues that the Basil Read/Bouygues (BRB)
joint venture, which had been awarded the N17 CTROM contract, was not a
participant in the market because it was a special purpose vehicle formed for the
purposes of the N4 concession and that it had to obtain special permission from its
shareholders to tender for the N17 CTROM.
22 At page 1745 of the Commission’s record SANRAL document on “Comparison on CTROM tender
with current operating and maintenance costs.”
23 See interchange between Mr Ali and the Tribunal panel on pages 5357 of the transcript of 14 June
2006. See also Mr Dreyer’s evidence at page 92 of the transcript.
2006. See also Mr Dreyer’s evidence at page 92 of the transcript.
24 See inter alia, Massmart Holdings Limited and Moresport Limited Case no: 62/LM/Jul05, Clover
Fonterra Ingredients (Pty) Ltd and Clover SA (Pty) Ltd/New Zealand Milk Products SA (Pty) Ltd Case
number: 92/LM/Nov04 and JD Group Limited and Ellerine Holdings Limited Case No: 78/LM/Jul00 and
the cases referred to therein.
25 In this regard see also Massmart Holdings Limited and Moresport Limited Case no: 62/LM/Jul05 from
page 12, where the Tribunal’s approach to market segmentation is discussed.
26 Page 42 of the transcript.
12
43] In addition, in order to define the relevant market, it seems that SANRAL has placed
some reliance on the fact that BRB has indicated that it does not intend to bid for
another CTROM contract, after its contract for the N17 expires in 2008, due to the
“imbalance between risk and reward”. The Commission seems to suggest that BRB’s
involvement in the market is exceptional because participants that are in the toll road
concession business generally do not participate in the CTROM business. 27
44] While BRB may have voiced its hesitation to continue in the CTROM market, this is
clearly a statement of intent, which may or may not occur sometime in the future. At
this point in time, BRB is in both the CTROM and concession markets and therefore
must be included as a participant. 28 The fact that contractual restrictions of this type
are in place voluntarily, rather than imposed by regulation, implies that a competitor
could negotiate out of these restrictions and bid for tenders in both the concessions
and CTROM submarkets, as has happened in the BRB case. Furthermore, the
suggestion that BRB is somehow an exception seems misplaced given that the
merging parties themselves participate in both the CTROM and concession space. 29
45] SANRAL’s own tender documentation reveals that several firms were invited to submit
tenders for certain toll road projects. 30 These documents also reveal that the bidders
competed on the basis of price rather than margin. 31 Mr Ali himself asserts that the
27 See the Commission’s Report at page31 .
28 While BRB has indicated that it has concerns with the low margins in the CTROM business, it may
decide to continue to have a presence in this part of the market for any other business reason at that
future time.
29 See SANRAL’s website and the individual websites of TRAC, N3TC and Bakwena.
30 Page 1684 (CTROM prequalification evaluation report) where SANRAL
30 Page 1684 (CTROM prequalification evaluation report) where SANRAL
recommends 8 applicants be invited to tender viz. N2 Toll Operations Joint Venture,
Basil Read/Kobitech Transport/Bouygues, Stocks Cintra N2 Joint Venture, Rumdel
Holdings Ltd, Tolcon, Intertoll Nkobi Consortium, Concor Holdings (Pty) Ltd and
Cofiroute.
31 See correspondence from Bell Dewar Hall to the Commission dated 26 April 2006 on page 1674 of
the Commission’s record. Also see pages 4950 of the transcript, where the Chairperson questions Mr Ali
on this.
13
market for toll road operations is “very competitive from a pricing point of view”. 32
46] In any event, it seems that nothing much turns on these distinctions since in a
subsequent submission SANRAL concedes that the relevant market is toll road
operations. In addition, Mr Ali conceded, during his testimony, that there was no
difference between the two types of operations in relation to the technical knowledge
and level of skills required and in the functions of the two operations 33 and that the
companies who conducted the toll road operations, as part of a concession agreement
would be able to conduct toll road operations for a government sponsored toll road
operation.34 Furthermore as demonstrated in the N4 East extension tender, there
could be a continuum between the two types of toll road operations. 35
47] For these reasons we agree with the merging parties that while a commercial
distinction could be drawn in relation to the extent of financial resources required or
margins achieved, these differences were not sufficient in themselves to further
segment the toll road operations market into a concession market and a CTROM
market for purposes of competition evaluation.
48] Nor can this Tribunal rely on the type of customer (concessionaire versus SANRAL) as
a basis for further segmentation of the relevant market in this particular transaction.
The type of customer serviced (e.g. business versus residential) has been used by
competition authorities in other mergers or jurisdictions as one of many indicia to
segment markets into submarkets. 36 However, in this merger, no such distinction
could be made because the ultimate customer is SANRAL, who determines the terms
and conditions of both the concession and the CTROM tenders for national toll roads.
and conditions of both the concession and the CTROM tenders for national toll roads.
49] Accordingly, we conclude that the relevant market for purposes of this transaction is
32 Ibid. At page 1673 of the Commission’s Record.
33 Page 24 of the transcript of 14 June 2006.
34 Ibid. Also Page 39 of the transcript.
35 The N4 is a privately sponsored concession. SANRAL initially put out the extension of the N4 East as
a CTROM tender but eventually awarded the N4 East extension to the existing N4 concessionaire.
36 Multichoice Subscriber Management (Pty) Ltd and Tiscali (Pty) Ltd Case No: 72/LM/Sep04.
14
the provision of toll road operations.
IMPACT ON COMPETITION
50] In each of the markets identified in Annexure A, the post merger market shares seem
notably high and prima facie raise competition concerns. In the market for toll road
operations the market shares for the merged entity will be 29.4%, with an HHI of 2993
suggesting a fairly concentrated market. 37 An HHI above 1800 is generally
considered to be an indication of a highly concentrated market. The change in HHI of
255 points is significant enough to cause concern and attract closer antitrust scrutiny.
51] The Commission and merging parties argue that despite the seemingly high market
share percentages and the change in HHI of 255 points for this market, these figures
are not necessarily indicative or an accurate reflection of market power since market
shares may fluctuate significantly as a result of the grant of one or more large project/s
to a particular market participant. 38 All of the activities of the merging parties involve
large projects and lumpy capital investments, which arose infrequently through a
bidding process. The Commission and the parties argued that the transaction was
unlikely to raise competition concerns, whether in the form of coordinated effects or
unilateral conduct, as suggested by SANRAL since a “ strong and peculiar feature of
the relevant markets is that each of them are socalled bidding markets.” 39
Furthermore, they argue, SANRAL has countervailing power to offset any exercise of
market power on the part of a supplier.
52] In our evaluation of the impact on competition below, we proceed on the basis that the
relevant market is the broader market for toll road operations, rather than the narrower
markets suggested by SANRAL. Hence, in our view, this is not a 32 merger and the
market would include at least the five players identified in the table in paragraph 30,
market would include at least the five players identified in the table in paragraph 30,
which have been awarded a toll road operations contract, whether this be a CTROM or
37 As are all the other markets in annexure A.
38 Page 66 of the Commission’s record.
39 Page 66 of the Commission’s record.
15
concession contract. 40 In accordance with this Tribunal’s traditional approach to
mergers41 we conclude that this transaction is unlikely to lead to a substantial
lessening of competition and that the remaining players, post merger, would be able to
constrain any exercise of market power by the merged entity. But in the event that we
are wrong on our definition of the relevant markets, we are persuaded that this market
has the features of a traditional bidding market as discussed below, and that this
would further ameliorate any competition concerns identified by SANRAL.
Bidding markets
53] The Commission’s reliance on the fact that any competition concerns that may attend
this merger will be ameliorated by the fact that these are bidding markets stems from
the understanding that the manner in which project specifications are developed and in
which tenders are adjudicated in a particular market limit the ability of a supplier to
exercise market power. 42
54] In traditional bidding markets, 43 the bidding process would usually involve a pre
qualifying process, with a fair amount of interaction between the suppliers and the
client. The tender is usually at a very high level of detail. The prequalifying process
requires all prospective bidders to qualify with predetermined criteria. Prospective
bidders, who qualify at this stage, would compete only on price at the last stage of the
bidding process and the winner would take it all. Once a contract is awarded, the
consequence is a relative increase in market share for the winner. This high market
share endures for as long as the contract endures. Customers in these markets under
consideration are large sophisticated clients who set the specifications and terms of
the tender. 44 The investment required is usually of a large capital nature, with tenders
the tender. 44 The investment required is usually of a large capital nature, with tenders
40 This the case with all the markets identified in annexure A, including underground mining.
41 And in accordance with section 12A of the Act
42 See Murray & Roberts Limited and The Cementation Company (Africa) Limited Case no: 02/LM/Jan04
41
43 See 'When Two is Enough: Competition in Bidding Markets.' Bishop and Bishop, European
Competition Law Review , Vol.17, no.1. Bishop and Walker, The Economics of EC Competition Law, &
Maxwell 1999.
44 For a further discussion of bidding markets and market power see Murray & Roberts Limited and The
16
occurring infrequently and contracts enduring for a relatively long period of time. 45
55] Klemperer46 identifies the features of an ideal (classical) bidding market, relying on
the European Commission’s definitions. The term bidding market is associated with
contests where:
i. Competition is ‘winner take all’, so each supplier either wins all or none of the
order;
ii. Competition is ‘lumpy’;
iii. Competition begins afresh for each contract, and for each customer;’
iv. Entry of new suppliers into the market is easy; and
v. A ‘bidding system’ or ‘bidding process’ is involved.
56] However Klemperer cautions regulators against suspending antitrust scrutiny of a
transaction simply because it is a “bidding market”. He argues that many markets that
are claimed as classical bidding markets (and which therefore would provide
protection against the exercise of market power) are in fact not such markets.
Therefore, one must carefully consider the extent to which the special features of
auctions and bidding processes in a particular transaction mean that competition
evaluation should indeed be different than for ordinary economic markets.
57] According to Klemperer if a market displayed all of 13 (“Bertrand market”) or 14
(“contestable market”) features identified above as a bidding market then it would
make sense for competition authorities to tolerate (assuming 5) the creation of
maintenance of highly concentrated markets. 47 He goes on to argue why the same
range of competitive problems may beset bidding markets and ‘ordinary’ economic
markets. He argues that with the rise of ecommerce, government privatisations and
both public and private outsourcing the role of auctions has greatly increased in the
Cementation Company (Africa) Limited 02/LM/Jan04 at Paragraph 41et seq.
Cementation Company (Africa) Limited 02/LM/Jan04 at Paragraph 41et seq.
45 For an in depth discussion on bidding markets see . Klemperer, “ Bidding Markets ”, Working Paper, UK
Competition Commission (2005)
46 SeeKlemperer supra at page 4.
47 Klemperer, page 7.
17
economy. As bidding markets move more and more away from the Bertrand or
contestable type of markets, regulators need to be more circumspect about markets
described as “bidding markets”. Hence regulators need to examine the features of
each socalled bidding market, the product and the bidding process itself in its
evaluation, as it does in other ‘ordinary’ markets. This was precisely the approach
adopted by the Tribunal in the Cementation case.48
58] This Tribunal has previously cautioned that all markets claimed as bidding markets are
not necessarily capable of limiting the ability of participants to exercise market power.
In Murray & Roberts Limited and The Cementation Company (Africa) Limited the
Tribunal stated that “there appears to be no particular reason why the existence of
bidding markets should prevent the exercise of market power in the market for
providing, for example, protective clothing or explosives or some or other input that is
required […] on a daily basis.” 49
59] This is because there may be a number of reasons why confidential bidding was
preferable in markets in which working equipment or other inputs are supplied on a
relatively small scale and a regular basis. Examples of such bidding processes can
usually be found where a public entity or a private corporation is the purchaser of
motor vehicles or cleaning and maintenance services or IT and other services. The
reasons why bidding processes are preferred may be numerous varying from the need
to promote fairness and transparency to promoting competition between bidders to
obtaining the best possible price. Such tenders and bidding processes occur regularly
and are relatively small and do not provide a greater degree of protection form market
power.
60] Put simply, there is no magic in the words “bidding markets”. Just because merging
60] Put simply, there is no magic in the words “bidding markets”. Just because merging
parties invoke the word “bidding markets” does not mean that the Tribunal must
suspend its antitrust scrutiny of the transaction before it. Not all bidding markets
48 Contrary to Klemperer’s assertion that this Tribunal failed to properly scrutinise a 32 merger. See
Klemperer at page 10, footnote 12.
49 At paragraph 41 of the Commission’s report.
18
provide protection against the exercise of market power simply by virtue of being
bidding markets. However, a merger in bidding markets that display the
characteristics of a Bertrand type market is less likely to result in a lessening of
competition in the form of either unilateral or coordinated effects.
61] The markets identified by the Commission in this merger are not markets for some or
other input that is required by the customers for the merging parties on a regular basis.
These markets are markets where the product or service that is the subject of the
bidding is a large, lumpy capital investment project, taking place over some duration of
time and which occurs infrequently.
62] We turn to consider the characteristics of the toll road operations market.
63] In general, the bidding process for toll road operations takes place in the following
manner. SANRAL in its discretion decides to issue a tender for either a toll road
concession or a CTROM. It does so after some investigation and approval of its
Contracts Committee. Once such a decision is made, seemingly with a fair amount of
interaction with key players in the industry, SANRAL prescribes the specifications of
the tender and embarks, with the assistance of consultants, on a prequalifying
process whereby it invites potential bidders to submit expressions of interest. Many
companies, both national and international, who are known by these consultants as
potential players in the market are invited to participate in the process. 50 A proportion
of those approached are likely to submit expressions of interest. 51 A list of these is
drawn and on the basis of some predetermined criteria by SANRAL, 52 usually related
to experience and credibility, a shorter list of firms is drawn up. These shortlisted
to experience and credibility, a shorter list of firms is drawn up. These shortlisted
bidders are then asked to submit formal bids. It is at this stage of the process that
companies may decide or decline to submit a formal bid.
50 For example in the N2 CTROM tender, fprequalifying documents were sent out. SANRAL letter
26April06
51 In the N2 CTROM, 21 of the 50 companies that were approached submitted expressions of interest.
52 For example, in the N2 CTROM application, only 8 out of 21 submissions were invited to tender, two of
theses being international players.
19
64] The tender is usually designed along SANRAL’s specifications. However, a fair
exchange of information and interaction regarding the tender specifications and
possible business models could take place during the prequalifying stage. 53 After
bids have been submitted a bidder is chosen on the basis of price and the winner
takes it all. The duration of the contracts are usually five years (CTROM) but could be
extended.54 Tenders are put out afresh at the end of the contract period. The
investment required is usually in the region of R100million or more.
65] This process demonstrates that SANRAL goes into the market, for a large capital
investment with an approximate idea of the price, quality, and duration of contract and
technical specifications of its purchase. It approaches prospective suppliers after a
process of technical and financial modelling and international benchmarking
conducted by its consultants 55 and sets a very high level of detail in the bid. While
SANRAL may not have specific knowledge about the costs of equipment, 56 it has
sufficient knowledge about the technical specifications and the potential costs of the
operators, which enables it to estimate the margins and the areas in which bidders
may compete. 57 This high level of detailed knowledge about its projects makes it very
difficult for bidders to construct a collusive bid.
66] In addition, the tender process, which is very tightly controlled by SANRAL, isolates
suppliers and makes it difficult for them to collude. During the prequalifying stage,
SANRAL approaches a group of preselected bidders, who are then shortlisted by
SANRAL. Some of this group are rejected because they are not suitable or credible
applicants, according to criteria predetermined by SANRAL. Those who remain and
applicants, according to criteria predetermined by SANRAL. Those who remain and
whom SANRAL invites to submit a formal bid, may do so or decline to do so. Until that
point in time none of the interested prospective bidders know with any certainty
whether they will be on the shortlist or not, nor are they able to influence the short
53 See Mr Ali’s evidence on the variable and flat fee options at page 5455 of the transcript.
54 Concession contracts are obviously longer.
55 Page 51 and 71 of the transcript.
56 See Mr Ali’s evidence on page 28 of the transcript.
57 For example, Mr Ali was able to tell us that the CTROM market was very price competitive and had
tight margins.
20
listing which is done according to predetermined criteria set by SANRAL. 58
Obviously, the more experienced players will be able to predict with a measure of
accuracy due to their longer involvement in and knowledge of the sector, whether they
are likely to be shortlisted, but unlike in a beauty contest type application 59 in which
public hearings on bids are often mandatory, each application is confidential and
bidders do not have insight into the other bidders applications. 60
67] All the bidders at this last stage are credible bidders and are required to comply with
the technical specifications prescribed by SANRAL, the only basis of competition being
price. 61 SANRAL is even able to predict with some measure of accuracy, the extent
of the price competition because the Minister prescribes toll fees and bidders tend to
compete largely in the area of cost management. 62 The selection of the successful
bidder is made by SANRAL in confidence and the winner is awarded the full contract,
rather than only some aspects of it. 63 Given this kind of process, it seems extremely
unlikely that any of the bidders, assuming some collusion on their part, would be able
to assess whether any of them were cheating or were deviating from the terms of their
collusive agreement.
68] Mr Ali suggests that if there were only two players 64 in the market this may lead to
collusion on allocation of markets, trading conditions or increased prices and possibly
predatory pricing. 65 However the fact that these tenders are infrequent, concern very
large projects and last over a fairly long duration, does not in our view provide an
58 According to Mr Ali points are awarded to each bidder on the basis of a number of predetermined
criteria.
59 This a procedure utilised by regulators in some sectors such as gaming, telecommunications or
broadcasting where the legislation may require public participation or scrutiny of applicants for
broadcasting or telecommunications licenses.
60 SANRAL may exchange information with bidders but these are bilateral as between a particular bidder
and SANRAL.
61 Indeed Mr Ali, himself asserts that the CTROM process together with SANRAL’s tender processes has
led to a competitive market which has become “very price competitive.”
62 Sthe evidence of Mr Ali and Mr Dreyer.
63 Nor is the contract awarded to more than one bidder in partnership.
64 Our view is that this is not a 32 merger.
65 SANRAL seemed more concerned about increased prices rather than predatory pricing.
21
incentive for such collusion. By its own admission, the market for toll road concessions
has grown at a much slower pace than that anticipated by SANRAL. Tenders are few
and far between than was initially anticipated. There is also a measure of
unpredictability in the awarding and duration of these tenders. At times a tender has
started out as a CTROM and been converted to a concession 66 and at times the
duration of the contract has been extended by an additional short period. 67
69] A bidder is unlikely to stay out of one bid in favour of its partnerincollusion when
there is some uncertainty as to when its turn will come up next, or if at all, or about the
extent of foregone profits in the case of a possible conversion to a more lucrative
contract (CTROM to concession). Likewise, a bidder is unlikely to engage in predatory
pricing if it is uncertain about when, or if at all, it will be able to recoup any losses
incurred due to such strategies.
70] Nor is there any evidence that a predator in the CTROM business is likely to recoup its
losses through the concession business. All the bidders in the toll road concession
business tend to be large consortiums, consisting of several shareholders. Unless the
toll road operator in the CTROM business is a shareholder of a concessionaire, he will
have to bid against others for the business of the concessionaire, the basis of
competition being similar to that of the CTROM contracts. He would also have to
recoup his investments (and any losses incurred as a result of predatory pricing in the
CTROM business) over a much longer period of time.
71] While the merged entity will have a fairly large market share (estimated as 29.4%), the
remaining players in the market are highly credible and experienced competitors. It
remaining players in the market are highly credible and experienced competitors. It
would seem unlikely that they would allow the merged entity to gain market share
through a series of anticompetitive conduct. 68
66 For example the N4 East extension started out as CTROM tender but was ultimately granted to the
existing N4 concessionaire. Page 6768 of the transcript.
67 For example, this possibility exists in the case of the Tsitsikamma CTROM contract. At page 69 of the
transcript.
68 This is true of all the other relevant markets identified by the Commission and reflected in Annexure A.
22
72] These combinations of factors persuade us that this market is competitive and is likely
to continue being competitive, despite SANRAL’s concerns about collusion.
Countervailing Power
73] While the Tribunal has not always found favour with the argument of countervailing
power, in this particular merger, SANRAL, is the ultimate customer in toll road
operations and in road construction, a large customer in engineering (general)
services and is clearly a sophisticated customer, who is knowledgeable about
international benchmarking, pricing and margins. In our view SANRAL is a price maker
in the relevant market 69 since as a regulator and customer it is able to determine not
just the technical specifications, quality of service, duration and commercial terms of a
tender, but is also able to determine the size of the market. The markets for toll road
concessions and operations are completely dependent on whether SANRAL decides
to issue a tender or not. 70 In our view this countervailing power on the part of
SANRAL acts as a disincentive to suppliers to exercise market power.
Barriers to Entry
74] SANRAL listed several key barriers to entry which had arisen and prevented further
entrants from entry and participation in this market notably that it was a highly
specialised technical and financial field with high risk exposure, low profit margins and
substantial capital facilities required. 71 The Commission however found that in the
market for toll road operations entry barriers were in fact surmountable.
75] The Commission submits that SANRAL itself contributes to the raising of entry
barriers by its stringent regulatory or contractual specifications. SANRAL’s
requirements were so stringent that only experienced and established players
69 As well as in road construction.
69 As well as in road construction.
70 Mr Ali conceded in the hearing that the market has not grown as rapidly as anticipated because
SANRAL had not issued as many tenders for toll road operations as expected – Page 57 of the transcript.
71 Page 1673 of the Commission’s record.
23
could meet them. An example of this is the shortages prescribed by SANRAL
in CTROM contracts. The internationally accepted standard for shortages i.e.
the extent of allowable shortages in toll fees collected before penalties are
applicable is circa 5%. 72 SANRAL on the other hand prescribes a shortage of 0%.
This means that if an operator incurs any shortages whatsoever in the toll fees to be
collected, that operator is liable to pay a penalty. According to market participants, this
is overkill on the part of SANRAL since the additional costs associated with the
collection of fees do not justify the extra income generated by this and serves as a
discouraging factor for potential entrants. 73
76] As a second basis in support of its contention, the Commission asserts that supply
side substitution from large construction companies was possible. International
suppliers of toll road equipment were also potential entrants in the toll road operations
market. In support of this, the Commission points to the BRB presence in the toll road
operations,74 as well as to Toll Link which has recently formed a consortium with
Intertoll for a CTROM tender. 75
77] In our view the issue of a shortage percentage may be relevant to the degree of
regulatory barriers, but the fact that the market is a regulated one and requires a high
level of technical and specialised knowledge suggests that the barriers to entry in the
relevant market are high for new players. The barriers to entry do not seem as easily
surmountable as that argued by the Commission. Nor does it appear that supply side
substitution is as easy as that suggested in the Commission's report.
78] In other words, the barriers to entry in the CTROM business could be relatively higher
72 Page 46 of the Commission’s Report.
73 Page 46 of the Commission’s report.
72 Page 46 of the Commission’s Report.
73 Page 46 of the Commission’s report.
74 In our view, BRB is a player in the relevant market.
75 This joint venture, which includes a BEE partner company, has submitted a tender for the N2 South
Toll road. According to the Commission, t he role of Toll Link in that joint venture is to design, supply and
install toll road equipment; the role of Intertoll is to collect the toll fees; the role of the BEE company is to
supply the labour force. Toll Link has also submitted that it is considering entering the South African
market for toll operation market on its own. At page 4647 of the Commission’s Report.
24
than those in the concessions business due to lower margins, switching costs 76 and
more stringent terms and conditions, but because the business of operating toll roads,
whether these be in a CTROM or concession contract, requires specialised technical
skills and knowledge, suggests to us that the barriers to entry are high.
79] This is supported by the evidence of Mr Dreyer, who confirms that while Intertoll’s
roots can be found in the parking garage management services, 77 supply side
substitution cannot take place easily without a significant upgrading of skills and
knowledge,78 This may explain why Toll Link, an equipment supplier is part of a
consortium with Intertoll rather than bidding on its own. 79 It appears that International
players who have shown an interest in the market recently seem keener to partner
with local players rather than enter on their own. 80 Hence, we are of the view that
barriers to entry in the toll road operations market are high.
80] SANRAL, as customer and regulator, could obviously facilitate entry through a number
of mechanisms without compromising on health, safety and environmental standards.
It could amend its tenders, combine tenders to improve economies of scale for
operators or benchmark its terms and conditions more favourably thereby attracting a
wider pool of bidders and still retaining its objectives of efficient delivery and risk
transfer. It could also decide to increase the number of toll road concessions versus
CTROM tenders in order to attract new players into the market or it could increase the
size of the market by issuing more tenders.
81] However even if there was no such intervention by SANRAL, and new players could
not enter this market easily due to the regulatory requirements and the high level of
not enter this market easily due to the regulatory requirements and the high level of
76 Because these contracts typically run for a period of five years, operators in the CTROM business may
experience switching costs more frequently than in the concession business where contracts are typically
for 1520year periods.
77 See Page 92 of the transcript .
78 Page 92 of the transcript.
79 Indeed without suspending our antitrust scrutiny these markets show the characteristics of a typical
Bertrand market.
80 At page 9092 of the transcript. This seems to be the implication in the exchange between Mr
Unterhalter and Mr Dreyer.
25
technical and specialist knowledge required, we are persuaded that the remaining
players and prospective bidders in the relevant market for toll road operations (both
CTROM and concession) pose a credible constraint on the merged entity to ameliorate
any competition concern arising from this merger.
82] The market share figures submitted by the merging parties and the Commission reflect
only those players who have been awarded tenders, not all of those who had
submitted bids or who are prospective bidders in the relevant market. SANRAL’s own
documentation, in particular its list of prequalifying prospective bidders, suggests that
there are alternative credible competitors to the merged entity in the relevant market,
who even if they are not successful in a tender and hence would not necessarily be
reflected in the market share figures, would, by virtue of being on the short list provide
a constraint on the merged entity. 81 In a bidding market such as this one and where
there will be at least more than two prospective bidders post merger, 82 the mere fact
that another entity submits, or could submit, a competing bid is likely to place a
sufficient constraint on the merged entity. 83
NOTE ON UNDERGROUND MINING
83] As stated earlier, our analysis of the market for toll road operations applies equally to
all the other relevant markets identified by the Commission. The market participants
and their relative market shares are reflected in annexure A.
84] The Tribunal had a residual concern in relation to the market for underground mining.
The Commission, without making a final determination, had identified several possible
narrower functional product markets in underground mining viz. design and planning,
shaft sinking, mine development and extraction of ore. The merging parties argued
that while both of them were involved in the broader underground mining market, they
that while both of them were involved in the broader underground mining market, they
81 Page 1684 of the Commission’s record.
82 SANRAL itself had identified 8 prospective bidders. See footnote 30 and 52.
83 See Bishop supra footnote 43, which argues that in a bidding market such as this one, even if there
were only two players, a competing bid is likely to place a sufficient constrain on the exercise of market
power.
26
focussed on different aspects of the market, suggesting that there was no overlap in
their activities. Mr Trevor Robinson (Concor) and Mr Henry Laas (M&R Cementation)
submitted that no competition concerns arose in this market because M&R tended to
work more in the capital expenditure aspects of the market and Concor tended to
focus on the working costs aspects of underground mining. 84
85] Mr Mario Gericke of Northam Platinum Gericke submitted that the merging parties
were both involved in the broader market for underground mining, but that Northam
Platinum did not necessarily see them as competitors because it had different
contracts with each of the merging parties. 85
86] Although the merging parties argued that no competition concerns arose in this market
due to a difference in focus, no further evidence was led to justify a narrower definition
of the market. Both parties were involved in one or more of the services identified by
the Commission in underground mining and while they were currently focussed on
different aspects of that market, no evidence was led that, post merger, they would
elect to focus on only one of the services contained within the broader market of
underground mining. All the witnesses in fact confirmed that the relevant market for
purposes of this transaction was the market for underground mining. 86
87] We are satisfied that the relevant market is the broad market for underground mining
and the relative market shares and participants as listed in Annexure A. While the
post merger market shares prima facie raise concerns, the accretion in market share is
only 5%. Our evaluation of the competition impact of the transaction (above) leads us
to conclude that despite the relatively high market share in this market, the transaction
does not lead to substantial lessening or prevention of competition.
does not lead to substantial lessening or prevention of competition.
84 See evidence of Mr Robinson and Mr Laas pages 124125 and at page133 respectively.
85 Northam had a backfilling contract with Concor and a cementation contract for ceiling operations with
M&R
86 Indeed Mr Gericke had no concerns about the merger itself but was concerned that the merging
parties honour their contractual commitments with Northam. In the hearing, the merging parties provided
Mr Gericke with such undertaking.
27
CONCLUSION
88] For the reasons stated above, we find that the transaction is unlikely to substantially
prevent or lessen competition in any of the relevant markets. There are no public
interest issues and we accordingly approve the transaction without conditions.
_________________________ 11 October 2006
Y Carrim Date
Concurring: N Manoim and D Lewis
Tribunal Researcher: M MuruganModise
For the merging parties: Advocate D Unterhalter instructed by Werksmans.
For SANRAL: Mr S Langbridge (Bell Dewar Hall).
For the Commission: M Mohlala (Mergers and Acquisitions) and D Motsamai (Legal Services).
28
ANNEXURE A 87
Estimated national market shares for the provision of building construction services, focusing on
the large project sub market for 2005
Competitor Market share (%)
WBHO 23
M&R 13
Concor 6
GrinakerLTA 19
Group 5 19
Stocks Building Africa 19
Others 1
TOTAL 100
HHI (Premerger) 1874
HHI (Postmerger) 1974
Change in HHI 156
Estimated national market shares for the provision of civil engineering services, focusing on the
large project sub market for 2005
Competitor Market share (%)
GrinakerLTA 20
M&R 16
Concor 7
Group 5 16
Steffanutti & Bressan 8
WBHO 7
Others 26
TOTAL 100
HHI (Premerger) 1208
HHI (Postmerger) 1400
Change in HHI 192
Estimated national market shares for the provision of engineering services for 2005
Competitor Market share (%)
M&R 19
Concor 7
Group 5 30
DSE 21
Cosira 18
SMEI 3
S&P 2
87 Page 27 29 of the Commission’s Report.
29
TOTAL 100
HHI (Premerger) 2089
HHI (Postmerger) 2355
Change in HHI 266
Estimated national market shares for the provision of roads construction services for 2005
Competitor Market share (%)
WBHO 34
GrinakerLTA 24
Group 5 12
M&R 8
Concor 7
Raubex 8
Haw & Ingles 7
TOTAL 100
Estimated national market shares for the provision of underground mining services for 2005
Competitor Market share (%)
M&R 43
Concor 5
GrinakerLTA 7
Shaft Sinkers 12
DellmannHaniel SA 2
JIC Mining 6
Others 25
TOTAL 100
HHI (Premerger) 2232
HHI (Postmerger) 2662
Change in HHI 430
Estimated market shares for the provision of facilities management services for 2005
Competitor Market share (%)
Tolcon (M&R) 24.1
Intertoll (Group 5) 41
Tracc 17
Concor 5.3
Dragados 12.6
TOTAL 100
HHI (Premerger) 2893
HHI (Postmerger) 2993
Change in HHI 255
30