Tshipise Safaris (Pty) Ltd v TD Nhlamulo and His Mother Logistics and Business Enterprises (Pty) Ltd and Others (538/2022) [2025] ZALMPPHC 124 (19 June 2025)

82 Reportability

Brief Summary

Contempt of Court — Mining Permit — Applicant sought to declare First and Tenth Respondents in contempt of a court order regarding mining activities — First Respondent's mining permit expired, yet mining continued unlawfully — Court found that both Respondents ignored previous court orders and continued illegal mining activities — Respondents held in contempt and interdict made final, with costs ordered against them.

REPUBLIC OF SOUTH AFRICA
IN THE HIGH COURT OF SOUTH AFRICA
(1)
(2)
(3) LIMPOPO DIVISION , POLOKWANE
REPORTAB LE: YES/NO
OF INTEREST TO THE JUDGES: YES/NO
REVISED.
························ ·~
DATE: 19 June 2025 SIGNATURE ..
In the matter between:
TSHIPISE SAFARIS (PTY) LTD
And
TD NHLAMULO AND HIS MOTHER LOGISTICS AND
BUSINESS ENTERPRISES (PTY) LTD CASE NO: 538/2022
APPLICANT
FIRST RESPONDENT
2
MINISTER OF MINERAL RESOURCES AND ENERGY SECOND RESPONDENT
REGIONAL MANAGER: DEPARTMENT OF MINERAL
RESOURCES AND ENERGY , LIMPOPO REGIONAL
OFFICE
MINISTER OF POLICE
STATION COMMANDER TSHAMUTUMBU
POLICE STATION
VAN DER WALT, EDWARD
MINISTER OF WATER AND SANITATION
MINISTER: DEPARTMENT FORESTRY ,
FISHERIES AND THE ENVIRONMENT
MULAUDZI , AZWIHANGWISI
MUNYAI, MUTHI MARIA
JUDGMENT THIRD RESPONDENT
FOURTH RESPONDENT
FIFTH RESPONDENT
SIXTH RESPONDENT
SEVENTH RESPONDENT
EIGHT RESPONDENT
NINTH RESPONDENT
TENTH RESPONDENT
3
DU PLESSIS AJ:
Introduction:
[1] This Court is tasked with the hearing of an Application involving 5 matters that
were consolida ted. The matters under case numbers 588/2022, 732/2023,
117 /2020 as well as 1391 /2020 were consolida ted with and under the
overarching matter with case number: 538/2022.
[2] At the inception of the hearing the Court indicated to the parties that the court
file for case number 538/2022 is the most complete and was it agreed between
the parties that this set of pleadings would be used for the hearing.
[3] The Applicant seeks relief as set out in Part B of the Notice of Motion under case
number 538/2022 and in the following terms:
3.1 That the First Respondent is declared to be in contempt of the Court
Order granted on 27 October 2020;
3.2 That the Tenth Responden t be declared to be in contempt of the Court
Order granted on 27 October 2020;
3.3 That interdict granted in paragraphs 2 and 3 of "PART A" be made final;
3.4 To the extent that the mining permit issued to the First Respondent in
respect of any of the Farms remains valid or has been renewed when
this matter is heard, it is reviewed and set aside;
3.5 The First, Sixth, Ninth and Tenth Respondents and any other
Respondent who opposes the application be order to pay the costs on
4
an attorney and own client scale, jointly and severally, the one to pay the
others to be absolved.
[4] Part A of the application under case number 538/2022 was granted by the
Honourable Acting Judge Madavha on 28 April 2023 and the rule nisi extended
to 5 February 2025.
Background:
[5] At the centre of the dispute between the parties, is a mining permit that was
granted to the First Respondent.
[6] The mining permit of the First Respondent expired, however the First
Respondent and the Tenth Respondent continues their mining activities.
[7] On the 27th of October 2020 the Honourable Judge Kgomo granted an order
under Case number: 1391/20201 in terms of which the parties were ordered to,
inter a/ia, enter into mediation (for both case numbers 1391/2020 as well as case
number 1265/2020).
[8] The Court Order further provided very specific requirements for the First and
Tenth Respondents ' mining activities and also Ordered the Minister of Mineral
Resources to cause an investigation to be conducted by the Department of
Mineral Resources into the complaint in terms of Section 310(5) of the National
1 See Order of 27 October 2020, annexure 'CA 1.2', Supplementary Affidavit, pp 533 to 538.
5
Environmen tal Management Act 107 of 1998 lodged on 6 October 2020 and to
compile and deliver a report to the Court as well as to the respective Parties.
[9] This Court Order has unfortunately been ignored by the First and Tenth
Respondents as well as by the Second Respondent , to with the Minister of
Mineral Resources and Energy, placing them in contempt thereof.
[1 O] On 1 April 2022 the Applicant sought and obtained interim relief by way of a rule
nisi with return date on 24 January 2023. The order was issued by the
Honourable Tshidada J.
[11] From the terms of the rule nisi it is evident that it had immediate and interim
effect.
[12] On the return date, the rule nisiwas extended by consent between the Applicant,
the First and Tenth Respondents as well as the State Respondents (Second to
the Eight Responden ts) represented by the State Attorney.
[13] In addition to the first urgent application which was enrolled for hearing on 22
March 2023, a further application was brought seeking a declaratory order
confirming that the rule nisi issued on 1 April 2022 by this Court in fact had interim
effect as well as contempt proceedings against the First and Tenth Responden ts.
[14] The first urgent application arose as a result of the First and Tenth Responden ts'
repeated formal declarations that they did not regard themselves as bound to
the said rule nisi since it had no interim operational effect in the absence of a
6
declaration to that effect being specifically articulated in the rule nisi itself. This
despite having agreed to the extension of the return date to 8 August 2023.
[15] During this time the respondents did not comply with the terms and obligations
arising from the interim order. The First Respondent as represented by the Tenth
Respondent continued to mine outside of the boundary / area demarcated and
permitted by its mining permit and the associated Environmental Authorisation
issued by the Department of Mineral Resources and Energy. For that purpose it
traversed the properties of the Applicant with impunity.
[16] The First Responden t also unlawfully stockpiled sand outside of the permitted
mining area on the Applicant's land.
[17] The first urgent application was removed from the roll on the return date due to
the fact that Tshidada J was concerned that on 1 April 2022, on the date that the
rule nisi was granted, and unbeknownst to the Applicant and himself the First
Respondent's mining permit has apparently been renewed during the preceding
week.
[18] The rule nisi was sought and granted on the premise that the permit has lapsed.
[19] It is apposite to state that the rule nisi had been correctly issued in respect of
any unlawful sand mining activities executed outside of the permitted mining
area and any areas not covered by a lawfully obtained mining permit or
Environmental authorisation.
7
[20] The renewed or reissued mining permit would only protect the First Respondent
from the operation of the rule nisi if the First Respondent confined its mining
activities within the geograph ic boundaries of the demarcated , permitted mining
area. The Departmen t of Mineral Resources and Energy filed a report on 04
December 2020 in which it stated that 65% of the First Respondent's mining
activities occurred outside of the permitted mining area.
[21] The First Respondent brought an urgent application (the second urgent
application) under case number 588/2023 in the Limpopo Local Division,
Thohoyandou , against the Applicant, the Applicant's farm manager, the Musina
Local Municipality and the Government of South Africa as well as the Minister of
Mineral Resources.
[22] In the second urgent application the First Respondent applied for the interim
suspension of the operation of the rule nisi of 1 April 2022 together with a
mandamus directing the Department of Mineral Resources and Energy to
consider and / or issue / renew the Applicant's mining permit which in the First
Respondent 's own admission on oath had by then lapsed at midnight, 17 March
2022.
[23] The Court proceeded to issue a further rule nisi identical to the rule nisi of 1 April
2022, with its return date on 8 August 2023, suspending the operational effect of
its own interim order, presumably pursuant to the provisions of rule 45A.2
2 See Order of 11 April 2023, annexure 'A', FA, pp 23 to 26.
8
[24] The Departmen t of Mineral Resources and Energy was directed to consider
subject to consultation with the landowner, occupier and any interested and
affected party, the application for the Applicant's mining permit on the Applicant's
land. The order did not renew the First Respondent's mining permit, which has
lapsed in the interim. It rather directed the Department of Mineral Resources
and Energy to consider the application for renewal of the mining permit,
expressly subject to the rights of the affected parties to be consulted in the
process.
[25] It must be reiterated that the First Respondent admitted under oath, in its
application under case number 588/2023 that its mining permit had expired on
17 March 2023.
[26] Despite the lapsing of the First Responden t's permit and further despite the
issuing of the order by the High Court of Limpopo Division, Thohoyandou on 11
April 2023, the First Respondent assisted by the Tenth Respondent continued
with their mining activities from the 15th of April 2023.
[27] The First Respondent and the Tenth Responden t therefore unlawfully entered
the properties of the Applicant to continue their mining activities on the banks of
the Limpopo River, which is the boundary of the Applicant's land, thus conducting
illegal mining activities thereat.
[28] It is common cause that the First Respondent 's mining permit has neither been
renewed, although an apparent renewal application has been submitted on 3
9
March 2023, nor has the Applicant received any notification of any consultative
process in relation thereto. At no time was the Applicant notified of any
application for renewal as it was entitled to as an affected party.
[29] On Saturday, 15 April 2023, the deponent to the Applicant's founding papers,
Turner, observed heavy earthmoving equipment and trucks travelling towards
the boom gate at the access road by which the Applicant's land is accessed .
[30] Turner observed the First Responden t directed by the Tenth Respondent , in turn
being assisted by unknown operators of heavy equipment and machinery ,
mining and loading sand well outside of the erstwhile permitted mining area as
is evidenced by a series of photographs.3 It is evident from the photographs that
they depict not only the earthmoving equipment, but also the exact time and
location of the photographic evidence. These photographs also depict the Tenth
Respondent directing the unlawful mining activities personally .
[31] The Applicant's attorney corresponded with the First and Tenth Respondents '
attorney of record by way of WhatsApp correspondence , copies thereof are
annexed to the Founding Affidavit as annexure 'D'.4
[32] From the correspondence it is clear that both the attorney of record and the First
and Tenth Respondents hold the view that while awaiting the Department of
Mineral Resources and Energy's decision and despite the sand mining permit's
3 Par 17, FA, p 14 read with annexure 'C' at pp 40 to 48.
4 Par 19, FA, pp 15 to 16 read with Annexure 'D', FA at pp 49 to 50.
10
lapsing on 17 March 2023, they are entitled to carry on mining unabated. This
on the basis that" ... she has to work until the renewal is answered".
[33] It is apparent that the First and Tenth Respondents as well as their legal counsel
holds the view that since the Applicant is not the registered owner of a portion of
its land, known as "Vrouwensbrom", it has no locus standi to act or complain
about any mining activities undertaken by the First Respondent upon
Vrouwensbrom.
[34] The Applicant has been the beneficial owner of the farm Vrouwensbrom having
fully paid for the land more than twenty years ago when it was purchased from
the State and throughout this period the State has never challenged the
Applicant's bona fide ownership and possession of Vrouwensbrom and has yet
to proffer any explanation for its failure to have duly transferred the property to
the Applicant.
[35] On or about 12 April 2023 the Applicant's attorney addressed a letter to the
Department of Mineral Resources and Energy, which letter was also transmitted
to the attorney of the First and Tenth Responden ts. This letter set out the
challenges to the renewal of the First Respondent's mining permit. This letter is
attached to the Founding Affidavit as annexure 'B'. 5
[36] Since the granting of the order dated 11 April 2023, the First and Tenth
Respondent have been trespassing on the Applicant's land, have moved heavy
earthmoving equipment to and fro on its land, have unlawfully mined sand on the
5 FA, at pp 28 to 39.
11
banks of the Limpopo River without a mining permit or Environmen tal
Authorisation, stockpiling sand and continuing to do so unabated and illegally.
[37] The mining activities were conducted far beyond the demarcated boundaries of
the permitted mining area.
[38] This is so despite formal attempts on the part of the Applicant to stop the unlawful
and criminal conduct on the part of the First and Tenth Respondents.
[39] The Applicant employed a land surveyor at its own expense to locate the
perimeter points of the permitted mining area. The Applicant then installed
concrete bollards to which blue plastic extension were attached. The blue plastic
extensions were visible above the Limpopo River water level. The first and Tenth
Respondents destroyed these demarcat ion points.
[40] During the rainfall season in the summer, the river overflows and the demarcated
mining area is under water. However, the Respondent continues to mine on the
banks of the river outside of the permitted mining area. This is not denied by the
First and Tenth Respondents .
[41] The Applicant further argued that the First and Tenth Respondents have allowed
third parties to mine, extract and remove sand under the First Respondent 's
mining permit. This is unlawful and conflicting with Section 27(8) of the Mineral
and Petroleum Resources Development Amendment Act, Act 49 of 2008.
12
[42] The intervention of the Fifth Respondent was sought by the Applicant. Despite
the fact that more than 130 criminal complaints have been preferred against the
First and the Tenth Respondents at the Tshamutumbu police station and a Police
Officer was dispatched to the scene of the First and Tenth Responden ts' unlawful
activities, no action was taken to stop the mining activities.
[43] The Applicant submitted that the Tshamutumbu SAPS refused to investigate any
of the complaints of the Applicant regarding the First and Tenth Responden ts'
illegal mining activities. The SAPS merely stated that the illegal mining activities
must be referred to the Departmen t of Mineral Resources and Energy.
[44] However, upon receipt of the complaints the Departmen t of Mineral Resources
and Energy advised the Applicant to report the matter to the Tshamutumbu
SAPS.
[45] On 18 December 2022 the Third Responden t served a final Compliance Notice
in terms of Section 31 L of National Environmen tal Managemen t Act, 107 of 1998
on the First Responden t. This Final Notice directed the First Responden t to
cease mining and to rehabilitate the mining area.
[46] This Final Notice has neither been challenged nor withdrawn and remains in full
force and effect.
[47] Despite the fact that the Final Notice is still effective, the Departmen t of Mineral
Resources and Energy failed to take any enforcemen t action against the First
Respondent. In fact, despite there being a Final Notice, the Department of
13
Mineral Resources and Energy renewed the First Respondent's mining permit
and the associated Environmenta l Authorisation on or about 23 March 2022.
[48] The Applicant has lodged appeals to the Eight Respondent (the Departmen t of
Forestry, Fisheries and the Environment) in terms of Section 43 of National
Environmen tal Managemen t Act, 107 of 1998 and in respect of the renewal of
the mining permit an appeal was lodged at the Director General of the Second
Respondent in terms of Section 96 of the Mineral and Petroleum Resources
Development Amendment Act, Act 49 of 2008.
[49] The Departmen t of Mineral Resources and Energy did not respond to the
Applicant's appeal under Section 96 as read with Regulation 7 4 of the Mineral
and Petroleum Resources Development Amendment Act, Act 49 of 2008 and did
not take the steps as prescribed in Regulation 7 4.
[50] Both appeals are currently the subject matter of Rule 53 review proceedings in
the Pretoria High Court under case number: 2023/13831.
[51] It is common cause between the parties that the First Respondent 's mining
permit lapsed on 17 March 2023 and together with it also the associated
environmenta l authorisation.
[52] It is further also common cause between the parties that the First and Tenth
Respondent have continued with their illegal mining activities.
14
[53] The First Responden t's application for the renewal of its mining permit of 3 March
2023 has been abandoned. It must be noted that the prescribed public
participation process has not occurred and no final Basic Assessment Report
has been submitted which reflect or incorporate the Applicant's comments .
[54] Due to the Applicant's review application that is pending in the Gauteng Division,
Pretoria, in respect of appeals lodged against the renewal alternatively extension
of the First Responden t's mining permit and environmental authorisat ion, the
Department of Mineral Resources and Energy is at present prevented from
considering or granting the 3 March 2023 renewal application as per Section
96(2)(b) of the Mineral and Petroleum Resources Development Amendmen t Act,
Act 49 of 2008.
[55] Despite the events as described above and in addition to the objections of the
Applicant, the First and Tenth Respondent continues with their mining activities
unabatedly , whilst the authorities are sitting with their arms folded.
[56] It is therefore evident that neither the Department of Mineral Resources and
Energy nor the SAPS fulfilled their legislative obligations.
Points in limine :
[57] The Respondent raised the following points-in-limine:
(a) Locus standi in judicio;
(b) Non-joinder;
15
(c) Non-comp liance with Rule 41 of the Uniform Rules;
(d) Non-compliance with section 96 read with regulation 74 of the Mineral
and Petroleum Development Regulations of Act 28 of 2002;
( e) Lis pendens;
(f) The application is moot and academic .
Locus standi in iudicio
[58] The Responden t contends that the Applicant has no locus standi. This is based
on the argument that the Applicant is not the registered owner of the farm
Vrouwensbrom, seeing that the Deeds Office records still reflect the owner
thereof to be the South African Government.
[59] In the Applicant's founding affidavit a very detailed explanation is given by the
Applicant setting out the actual purchase of the farm Vrouwensbrom.
[60] It is further submitted by the Applicant that it has been in sole and undisturbed
possession of the farm since its acquisition and that its position as owner has
never been challenged by a third party.
[61] The Applicant argued that it did not approach this court on the basis of ownership
but in terms of Section 32 of the National Environmental Management Act,
Act 107 of 1998 which clothes the Applicant with the necessary locus standi.
[62] Section 32 of the National Environmental Managemen t Act provides as follows:
16
"(1) Any person or group of persons may seek appropriate relief in respect
of any breach or threatened breach of any provision of this Act, including a
principle contained in Chapter 1, or any other statutory provision concerned with
the protection of the environmen t or the use of natural resources -
(a) in that person's or group of persons own interest;
(b) in the interest of, or on behalf of, a person who is for practical reasons,
unable to institute such proceedings:
(c) in the interest of or on behalf of a group or class of persons whose
interests are affected;
(d) in the public interest; and
(e) in the interest of protecting the environment."6
[63] It is evident from Section 32 of the National Environmental Management Act, 107
of 1998 that the Applicant is vested with the necessary locus standi to bring this
application in terms of the Act.
[64] The basis for the Applicant's locus standi is further also entrenched in Section
38 of the Constitution 7, which states the following:
"Anyone listed in this section has the right to approach a competent
court, alleging that a right in the Bill of Rights has been infringed or threatened,
and the court may grant appropriate relief, including a declaration of rights. The
persons who may approach a court are-
(a) anyone acting in their own interest;
6 My own emphasis.
7 The Constitution of the Republic of South Africa, Act 108 of 1996.
17
(b) anyone acting on behalf of another person who cannot act in their own
name;
(c) anyone acting as a member of, or in the interest of, a group or class of
persons;
(d) anyone acting in the public interest; and
(e) an association acting in the interest of its members ."8
[65] The Respondents ' point-in-limine of lack of locus standi in judicio is therefore
dismissed.
Non-joinder
[66] The Respondent contends that the Applicant had to join the Department of Public
Works in this Application. This is based on the argument that the Applicant is not
the registered owner of the farm Vrouwensbrom , seeing that the Deeds Office
records still reflect the owner thereof to be the South African Government.
[67] It is the Respondents' argument that the Applicant should have joined the
Department of Public Works seeing that the Department of Public Works is the
custodian and portfolio manager of the national government's immovable assets.
[68] When a party raises a point of non-joinder it is required to provide an argument
that the third party or the parties which in its opinion should have been joined in
the proceedings not only have an interest in the case but that their interest is (a)
8 My own emphasis
18
direct, and (b) Substantial in the issues to be adjudicated by Court. In the matter
of Judicial Service Commission v Cape Bar Council 2013(1) SA 170 (SCA)
para 12 it was held that:
"It has by now become settled law that the joinder of a party is only required as
a matter of necessity-as opposed to a matter of convenience -if that party has
a direct and substantial interest which may be affected prejudicially by the
judgment of the court in the proceedings concerned (see eg Bowring NO v
Vrededorp Properties CC 2007 (5) SA 391 (SCA) para 21 ). The mere fact that a
party may have an interest in the outcome of the litigation does not warrant a
non-joinder plea. The right of a party to validly raise the objection that other
parties should have been joined to the proceedings, has thus been held to be a
limited one (see eg Burger v Rand Water Board 2007 (1) SA 30 (SCA) para 7;
Andries Chari Cilliers, Cheryl Loots and Hendrik Christoffel Nel Herbstein & Van
Winsen The Civil Practice of the High Courts of South Africa 5 ed vol 1 at 239
and the cases there cited.)"
[69] In the Applicant's founding affidavit a very detailed explanation is given by the
Applicant setting out the actual purchase of the farm Vrouwensbrom.
[70] It is further submitted by the Applicant that it has been in sole and undisturbed
possession of the farm since its acquisition and that its position as owner has
never been challenged by a third party, including the Department of Public
Works.
[71] 19
In Gauteng Provincial Government Department of Human Settlement s and
Others v Busha and Others (90742020) 2024 ZAGPJH C 154, Wilson J stated
that: "South Africa operates a negative system of deeds registration. That means
that the deeds register is not conclusive evidence of its own correctness. In other
words, the register may be corrected where there is legal cause to do so."
[72] The Applicant has provided documentary proof of the purchase as set out in
Paragraph 44 of the Founding Affidavit in addition to Annexures FA5.1 -FA5.4.9
[73] The fact that the Applicant is in sole and undisturbed possession of the farm
since its acquisition and that its position as owner has never been challenged by
a third party proves that the Departmen t of Public Works does not have any
interest in the property and therefore no interest in this application.
[74] On the other hand, the Respondents are not before the Court with clean hands
in respect of this point. The Departmen t of Mineral Resources and Energy are
required to consult with all interested parties when it issues a mining permit and
one would expect that it would consult with the Department of Public Works if it
had a direct and substantial interest in this matter. It is evident from the papers
that the Second Respondent did not do so.
[75] Therefore the Court is of the view that the Department of Public Works does not
have a direct and substantial interest in this application. The point-in-limine is
therefore dismissed.
9 FA, at page 22 and Annexures FA5.1 -FA5.4 at pp 150 -156
20
Non-compliance with Rule 41 of the Uniform Rules
[76] This point in limine has been abandoned by the Responden ts during argument
before Court.
Non-compliance with section 96 read with regulation 7 4 of the Mineral and
Petroleum Development Regulations of Act 28 of 2002
[77] The Respondents argued that the decision by the Second, Third and Ninth
Respondents of approval and granting a renewal of the First Respondent's
mining permit is an administrative decision.
[78] The Respondents further argue that due to the fact that it is an administrative
decision, the Applicant ought to first comply with the internal appeal process as
provided for in terms of section 96 read with regulation 74 of the Mineral and
Petroleum Development Regulations of Act 28 of 2002.
[79] The Applicant however, explained to the Court that it has indeed submitted
appeals to the National Minister of Forestry, Fisheries and the Environment ,
being the Eighth Respondent , in terms of Section 43 of the National
Environmen tal Act, 107 of 1998 and in respect of the renewal of the mining
permit. An appeal was further also submitted to the Director-Gene ral of the
Second Respondent in terms of Section 96 of the Mineral and Petroleum
Resources Development Amendment Act, Act 49 of 2008.
21
[80] The Appeal was filed against the extension of the Environmental Authorisation
on the 23rd of June 2022.
[81] The Eighth Respondent issued a ruling on the appeal, however she incorrectly
determined the appeal as being one against the granting of the original
Environmental Authorisation during 2020 rather than against the extension of the
Environmental Authorisation during March 2022.
[82] This effectively caused the appeal against the March 2022 extension of the
Environmental Authorisation to remain undetermined until the lapse of the
Environmental Authorisation through effluxion of time on 17 March 2023.
[83] The Department of Mineral Resources and Energy never responded to the
appeal under Section 96 (as read with Regulation 7 4) of the Mineral and
Petroleum Resources Development Amendment Act, Act 49 of 2008 and did not
proceed with any of the steps as prescribed in Regulation 74.
[84] Both of the appeals are currently the subject matter of Rule 53 review
proceedings in the Gauteng Division, Pretoria High Court under case number
2023/13831 and was a copy of the Notice of Motion attached to the Applicant's
replying affidavit to the Second, Third and Ninth Respondent's Answering
Affidavit.
[85] It is clear that the Applicant did comply with the internal appeal process as
provided for in terms of section 96 read with regulation 7 4 of the Mineral and
Petroleum Development Regulations of Act 28 of 2002.
22
[86] This point-in-limine is therefore dismissed.
Lis Pendens
[87] The First and Tenth Respondents raised the point of /is pendens, submitting to
this Court that there is a pending application under case number 1265/2020 in
the High Court, Limpopo Division, Thohoyandou.
[88] The last time that the above mentioned matter was heard in Court was on 15
September 2020, before the retired Makhafola J. A copy of the order made by
the Court was attached to the First and Tenth Responden ts' Answering Affidavit
as Annexure "N2."
[89] The First and Tenth Responden ts further submitted that the matter was
postponed pending a mediation process.
[90] The Applicant argued that the First and Tenth Respondents were also the
Applicants in a further application under case number 1391 /2020 issued from
the High Court, Limpopo Division, Thohoyandou in respect of which the Court
issued a Court order on 27 October 2020 in terms of which case number
1265/2020 was consolidated with case number 1391/2020. The matter was
further referred to mediation in terms of Rule 41 A.
[91] The three requirements for a successful reliance on the plea of /is pendens are:10
10 See Standard Bank of SA Ltd v Tsheo/a Dinare Tours and Transport Brokers (Pty)Ltd (22011/2021)
[2022] ZAGPJHC 311 (6 May 2022) at para [14].
23
91.1 The litigation is between the same parties;
91.2 That the cause of action is the same; and
91.3 That the same relief is sought in both sets of proceedings.
[92] Wallis J in Caesarstone Sdot-Yam Ltd v The World of Marble and Granite
2000 CC and Others11 explained the doctrine of /is pendens as follows:
"[2] As its name indicates, a plea of /is alibi pendens is based on the
proposition that the dispute (/is) between the parties is being litigated elsewhere
and therefore it is inappropriate for it to be litigated in the court in which the plea
is raised. The policy underpinning it is that there should be a limit to the extent to
which the same issue is litigated between the same parties and that it is desirable
that there be finality in litigation. The courts are also concerned to avoid a situation
where different courts pronounce on the same issue with the risk that they may
reach differing conclusions. It is a plea that has been recognised by our courts for
over 100 years."
[93] It must be noted that the matter under case number 1265/2020 as consolidated
with case number 1391/2020 does not fulfil the requirements as set out, as it
definitely did not have the same cause of action and the relief sought was
completely different.
[94] The Court finds that, seeing that there are various applications between the
parties, the point-in-limine is very selectively raised seeing that the Court ordered
mediation in the matters which the parties specifically referred to under this point,
in 2020 -which is 5 years ago.
11 [2013] ZASCA 129; 2013 (6) SA499 (SCA).
24
[95] This Court is of the view that the First and Tenth Respondents are not raising
this point-in-limine with clean hands, by virtue of the fact that they trying to use
a Court Order to their benefit, however they wilfully disregarded the Order of the
Court by refusing to enter into mediation with the Applicant herein.
[96] The Court further finds that this point is merely raised because it benefits the
First and Tenth Respondent under the circumstances , but it did not prevent the
First and Tenth Respondent to approach the Court in a further application as set
out above.
[97] What the First and Tenth Respondents omit to state is that case number
1391 /2020 ( as consolidated with case number 1265/2020) has been
consolidated further under case number 538/2022 , which is the matter being
heard by this Court. This fact, in itself, renders the point of /is pendens moot.
[98] There needs to be finality to the dispute between the parties and finality in the
various matters before Court, the respective matters cannot be held hostage by
a matter that is wilfully left pending and unattended by the Respondent and that
does not comply with the requirements for raising the point of /is pendens.
[99] On this basis this point-in-limine is dismissed.
The application is moot and academic
25
[100] The Respondents argued that the order granted in terms of Part A of the
application on 1 April 2022 is moot and academic by virtue of the fact that there
was a mining permit, which permit which was renewed on 16 March 2016 and
expired on 17 March 2023.
[101] The Applicant argued that the mining activities of the First and Tenth
Respondents are conducted outside of the permitted mining area. It was further
submitted that the First and Tenth Respondent are in ongoing breach and
contempt of Court Orders and legislative provisions.
[102] The Applicant further submitted that the Department of Mineral Resources and
Energy Responden ts, in this matter the Second and Third Respondents , are
tolerating this conduct and that they fail to enforce the Final Notice and also fail
to act against the First and Tenth Respondents for mining outside of the
permitted mining area.
[103] It is evident that the application is neither moot nor academic, seeing that the
First and Tenth Respondents are still continuing their mining activities and that
they are still in contempt of previous Court Orders.
[104] This point-in-lim ine is therefore dismissed.
Legal Framework:
26
[105] As a starting point it is necessary to consider Section 5A of the Mineral and
Petroleum Resources Developmen t Amendment Act, Act 49 of 2008 which reads
as follows:
"5A No person may prospect for or remove, !!!!.!!!, or conduct technical co­
operation operations, reconnaissance operations , explore for and produce
any mineral or petroleum or commence with any work incidental
thereto on any area without -
(a) An environmental authorisation ;
(b) A reconnaissance permission, prospecting right, permission to
remove, mining right, mining permit, retention permit, technical co­
operation permit, reconnaissance permit, exploration right or
production right, as the case may be; and
(c) Giving the landowner or lawful occupier of the land in question at least
21 days' written notice" .12
[106] It is evident from the background facts that the First and Tenth Respondents are
mining outside of the boundary of the initial mining permit, especially during the
rainy season when the permitted mining area is under water. They admitted to
the same.
[107] The First and Tenth Respondents also stockpiled the sand outside of the
permitted mining area.
12 My own emphasis
27
[108] It is also common cause that the mining permit of the First Respondent has
lapsed on 17 March 2023 and together with it also the Environmental
Authorisation.
[109] In this respect one should consider Section 56(a) of the Mineral and Petroleum
Resources Development Act, 28 of 2008 that provides expressly that any right,
permit, permission or license granted or issued in terms of the Act shall lapse
whenever it expires.
[11 O] The First Respondent has submitted an application for the renewal of the mining
permit on 3 March 2023, but the Applicant has not received any notification of
any consultative processes as is required in terms of Section 10 of the Mineral
and Petroleum Resources Developmen t Act, Act 28 of 2002.
[111] Section 27 of the Mineral and Petroleum Resources Development Amendment
Act, Act 49 of 2008 also deals with the application for the issuing and the duration
of mining permits and provides in section 27(5) that the Regional Manager, when
accepting an application for a mining permit must within 14 days notify the
Applicant in writing to submit an environmental managemen t plan and to notify
in writing and consult with the landowner and lawful occupier and any other
affected parties and submit the result of the said consultation within thirty days
form the date of the notice.
[112] Once again it must be stated that the Applicant has not received the required
notification nor was the Applicant consulted in this regard.
28
[113] As previously mentioned in the discussion of the factual background , the Court
has taken note that on 18 December 2022 the Third Responden t served a final
Compliance Notice in terms of Section 31 L of the National Environmental
Management Act, 107 of 1998 in terms of which the First Respondent was
directed to cease mining and to rehabilitate the mining area.
[114] The Court takes further note that despite the fact that this final Compliance
Notice has neither been challenged nor withdrawn and remains in full force and
effect, the Department of Mineral Resources and Energy failed to take any
enforcement action against the First Responden t and it even renewed the First
Respondent's mining permit and the Environmental Authorisation on or about 23
March 2022.
[115] This is highly irregular and contrary to the requirements as set out in the National
Environmen tal Management Act, 107 of 1998.
[116] Due to the Applicant's review application that is pending in the Gauteng Division,
Pretoria, in respect of appeals lodged against the renewal alternatively extension
of the First Responden t's mining permit and environmental authorisat ion, the
Department of Mineral Resources and Energy is at present, in any event,
prevented from considering or granting the 3 March 2023 renewal application as
per Section 96(2)(b) of the Mineral and Petroleum Resources Development
Amendment Act, Act 49 of 2008.
29
[117] Finally, it must be noted that the Respondents have laid a bare denial before this
Court in answer to the claim of the Applicant. The Responden ts have not placed
their version before Court for the consideration thereof.
[118] In the matter of Plascon-Evans Paints Ltd v Van Riebeeck Paints (Pty) Ltd
(19841 (3) SA 623 (A) it is provided that the general rule is still that in proceedings
where disputes offact have arisen on affidavits, a final order, whether an interdict
or some other form of relief, may be granted if the facts averred in the applicant's
affidavits, which have been admitted by the respondent , together with the facts
alleged by the respondent , justify such an order.
[119] The weight of evidence is further also discussed in the matter of Wightman t/a
JW construction v Headfour (Pty) Ltd and Another [20081 (3) SA 371, where
Heher JA held that:
"A real, genuine and bona fide dispute of fact can exist only where the court is
satisfied that the party who purports to raise the dispute has in his affidavit
seriously and unambiguously addressed the fact said to be disputed. There will
of course be instances where a bare denial meets the requirement because there
is no other way open to the disputing party and nothing more can therefore be
expected of him. But even that may not be sufficient if the fact averred lies purely
within the knowledge of the averring party and no basis is laid for disputing the
veracity or accuracy of the averment. When the facts averred are such that the
disputing party must necessarily possess knowledge of them and be able to
provide an answer (or counterva iling evidence) if they be not true or accurate
but, instead of doing so, rests his case on a bare or ambiguous denial the court
30
will generally have difficulty in finding that the test is satisfied. I say 'generally'
because factual averments seldom stand apart from a broader matrix of
circumstances all of which needs to be borne in mind when arriving at a decision.
A litigant may not necessarily recognise or understand the nuances of a bare or
general denial as against a real attempt to grapple with all relevant factual
allegations made by the other party. But when he signs the answering affidavit,
he commits himself to its contents inadequate as they may be and will only in
exceptional circumstances be permitted to disavow them. There is this a serious
duty imposed upon a legal adviser who settles an answering affidavit to ascertain
and engage with facts which his client disputes and to reflect such disputes duly
and accurately in the answering affidavit. If that does not happen it should come
as no surprise that the court takes a robust view of the matter."
Conclusion
[120] This Court finds that the Responden ts have not adequately answered the case
made against them and for the reasons set out above, the application was
successful. I, accordingly, grant the order sought by the Applicant.
Order:
In the result the following order is made:
1. The First Responden t is declared to be in contempt of the Court Order
granted on 27 October 2020;
31
2. The Tenth Responden t be declared to be in contempt of the Court Order
granted on 27 October 2020;
3. That interdict granted in paragraphs 2 and 3 of "PART A" is made final;
4. To the extent that the mining permit issued to the First Respondent in
respect of any of the Farms remains valid or has been renewed when this
matter is heard, it is reviewed and set aside;
5. The First, Second, Third, Fourth, Fifth, Sixth, Eighth, Ninth and Tenth
Respondents are ordered to pay the costs on an attorney and own client
scale, jointly and severally, the one to pay the others to be absolved.
APPEARANCES:
DATE OF HEARING
DATE OF JUDGMENT S DU PLESSIS
ACTING JUDGE OF THE HIGH COURT,
LIMPOPO DIVISION , POLOKWANE
5 -6 FEBRUARY 2025
19 JUNE 2025
FOR THE APPLICANT
INSTRUCTED BY
FOR THE 1st & 10th
RESPONDENT
INSTRUCTED BY
sth & gth RESPONDENTS
INSTRUCTED BY 32
Adv. JG Smit
Christo Rheeders Attorneys
hcr@crattorneys.co.za
Adv. S. Shikwari S.C.
MK Mulaudzi Attorneys Inc
mkmulaudziattorneys@gmail.com
Adv. S Mathebathe
State Attorney