Du Toit N.O. and Another v Clarensville Shareblock Limited (15955 / 2019) [2022] ZAWCHC 113 (6 June 2022)

78 Reportability
Civil Procedure

Brief Summary

Interlocutory Applications — Supplementary Expert Report — Applicants sought to file a supplementary expert report without the respondent’s consent or court leave after a variation application was dismissed — Respondent contended that this constituted irregular proceedings and was prejudicial — Court held that the filing of the supplementary report was impermissible as it violated the terms of the oral evidence order, which required court leave for such submissions, and was substantively different from the initial proposal, thereby causing manifest prejudice to the respondent.

Comprehensive Summary

Summary of Judgment


1. Introduction


This judgment concerns an opposed interlocutory application in motion proceedings in the Western Cape Division of the High Court, Cape Town. The interlocutory dispute arose within a broader, still-pending main application relating to alterations to a share-block apartment and, in particular, the proposed modification of a structural concrete element referred to as an upstand beam.


The applicants were Francois Arnold du Toit N.O. and Henri du Toit N.O., acting in their capacities as trustees for the time being of the Rijsel Trust. The respondent was Clarensville Shareblock Limited, a share-block company owning an apartment building in Sea Point. The trust, as a shareholder, held rights of use and occupation in respect of a particular apartment in the building.


Procedurally, the matter had a history of interlocutory litigation. An earlier interlocutory variation application had been argued before the same judge and dismissed. That earlier interlocutory stage related to a prior order referring a limited issue to oral evidence under Rule 6(5)(g). Following the dismissal of the variation application, the present interlocutory application was launched by the respondent on the basis that the applicants had taken an irregular procedural step by delivering a supplementary expert report without consent or leave of court, in circumstances where an order regulating oral evidence had already been made.


The general subject-matter of the dispute in the main application was whether the respondent’s board had unreasonably withheld consent to a proposed alteration to the apartment (namely, modification of the upstand beam), and whether the trust should be permitted to proceed with the alteration as proposed by its engineer. The present interlocutory application focused more narrowly on case management and procedural regularity, specifically whether a late supplementary expert report could be introduced without leave and what consequences should follow.


2. Material Facts


The respondent was a share-block company that owned a block of apartments in Sea Point. The building was approximately sixty years old. The Rijsel Trust, as a shareholder, enjoyed rights of use and occupation of apartment 805.


During 2019, the trust applied to the respondent’s directors for permission to make alterations to the apartment. This application was approved in April 2019 and building works commenced. In May 2019, the trust’s contractor discovered an upstand beam in the wall which the trust wished to remove or modify to install a sliding door between a proposed lounge and the balcony.


A material background fact was that the purpose and precise location of the beam, and the implications for structural integrity, were not entirely clear, partly because of the building’s age and the absence of plans providing structural detail. The trust obtained an engineer’s opinion that the beam was “oversized” and that a designed detail would allow the alteration without compromising structural integrity. The trust was also advised that the respondent’s board had previously resolved not to allow modifications to the building’s concrete frame, which would include the beam in question.


The board’s stance evolved into a conditional permission: the alterations could proceed, but the beam had to be restored to its original condition. The trustees disputed that condition and contended that the board’s decision was ultra vires and unreasonable. A further request to allow alteration of the beam, supported by the trust’s engineer’s opinion, was refused by the respondent’s board. This refusal led to the substantive main application seeking an order declaring the withholding of consent unreasonable and authorising the proposed alteration.


For purposes of this interlocutory judgment, the critical procedural facts were as follows. An order had previously been made (by agreement) referring a limited issue to oral evidence under Rule 6(5)(g), framed around whether the beam could be altered in the manner proposed without adversely affecting the building’s structural integrity. The applicants later brought a variation application seeking, among other things, to introduce a different expert; that variation application was dismissed.


After the refusal of the variation application, the applicants sent a supplementary report to the respondent’s expert on 3 March 2022, apparently in anticipation of a joint meeting of experts scheduled for 7 March 2022. The experts met and a joint minute was produced and signed on 9 March 2022. The supplementary expert report was only filed on the respondent’s attorneys on 7 March 2022, after the experts’ meeting had already occurred.


The respondent contended that the supplementary report was delivered without consent and without leave of court, contrary to the governing court order and in a manner that was prejudicial and irregular. The applicants contended that the supplementary report was not strictly prohibited by the oral evidence order and was therefore permissible without leave.


The court also treated as material that the supplementary report was substantively different from what had originally been placed before the respondent’s board. The initial engineering material consisted of a letter and a drawing, whereas the later report was fifteen pages long and included nineteen drawings. The court further considered it material that the correspondence arranging the experts’ meeting did not record that the meeting was to consider the new supplementary report, and that the joint minute was drafted by the applicants’ counsel without the respondent and its counsel knowing this at the time.


3. Legal Issues


The central legal questions were procedural and concerned the application of procedural rules and prior court orders to the facts, rather than the determination of the substantive merits of the main dispute about reasonableness of consent.


The principal issues were whether, given the existing Rule 6(5)(g) referral order regulating oral evidence on a defined issue, the applicants were entitled to deliver a supplementary expert report without the leave of court or the respondent’s consent, and whether doing so constituted an irregular step capable of being set aside.


Closely linked to that question were issues of prejudice and fairness: whether the late and unilateral filing of the supplementary report, and the circumstances under which the experts’ joint minute was produced, undermined the respondent’s right to a fair hearing free of procedural taint.


A further issue concerned the consequences of the applicants’ prior conduct and litigation stance, in particular whether the applicants were bound by a judicial admission regarding the necessity of obtaining leave to file a further expert report, and whether they were impermissibly attempting to depart from it.


The costs issue required the court to exercise a value judgment and discretion, including whether the circumstances justified departing from the ordinary costs rule and granting a punitive costs order, at least for part of the period.


4. Court’s Reasoning


The court approached the matter from the perspective that a court order referring a matter to oral evidence under Rule 6(5)(g) defines and regulates the parties’ procedural rights and obligations for the conduct of that referral. On the court’s reasoning, the referral order did not confer a general entitlement on a party to supplement its expert case unilaterally at a later stage; rather, the proper mechanism for introducing further expert material, outside what the order contemplated, was to obtain leave of court.


In addressing the applicants’ contention that what is not expressly prohibited is permitted, the court rejected that approach in the context of an existing order governing a limited referral. The court treated the need for leave as flowing logically from the procedural framework created by the referral order. In that sense, the issue was not whether the applicants could find an express prohibition, but whether they had authorisation, within the governing procedural context, to file additional expert material.


The court also considered the expert evidence context as one that requires particular procedural discipline. It noted generally that expert witnesses often carry an aura of respectability and that the court must be attentive to the manner in which expert evidence is introduced and managed. Against that background, the court treated the lateness of the supplementary report and the unilateral manner of its delivery as significant, particularly given the long procedural history and the fact that the main application had originally been launched on urgency nearly three years earlier.


A substantial part of the reasoning turned on prejudice and the mismatch between the supplementary report and the case originally presented to the respondent’s decision-maker. The court held that the further report was not merely an elaboration of what had been before the respondent’s board, but was substantively different in design concept and detail. It had never been placed before the respondent’s board for consideration and did not, on the court’s description, align with the relief sought in the main application as originally formulated. This compounded the irregularity because the respondent would face a materially altered technical case midstream, with attendant implications of cost and fairness.


The court further evaluated the circumstances under which the experts’ joint minute came into being. It considered it material that the respondent’s attorneys were not timeously notified of the supplementary report before the experts met, and that the correspondence arranging the meeting did not reflect that the new report would be considered. The court reasoned that this lack of transparency affected the integrity of the process and could not be reconciled with a fair procedural approach. The court added that the respondent’s expert could not know whether what was presented to him was procedurally regular or whether authority was required from the respondent’s board, and therefore the court considered that little probative weight could be attached to the resulting joint minute.


In addition, the court held that the applicants’ acceptance and adoption of the position that they needed to ask the court for leave to file a further report constituted a judicial admission, relying on the authority it cited, and that the applicants were precluded from later departing from that admission. This reinforced the conclusion that the attempt to introduce the supplementary report without leave was impermissible.


On costs, the court applied the general principle that costs serve to indemnify a successful party and that costs ordinarily follow the event. It emphasised the discretionary nature of costs awards and that the discretion must be exercised judicially with regard to fairness and the circumstances of the case. While the respondent sought a punitive order for the entire interlocutory application, the court concluded that a punitive order was warranted only for a portion of the costs. The court’s explanation was that it should have become clear to the applicants, shortly after the replying papers were filed, that their opposition was doomed, and that this justified an attorney-and-client scale from a defined point in time.


5. Outcome and Relief


The court set aside the applicants’ supplementary notice delivered under Rule 36(9)(b) dated 7 March 2022, together with the attached further report of Mr Woudberg dated 3 March 2022, on the basis that it constituted an irregular step.


The court ordered the applicants, jointly and severally, to pay the respondent’s costs of and incidental to the interlocutory application on a mixed scale. Costs were awarded on the party-and-party scale from the inception of the interlocutory application up to and including 18 May 2022, and on the attorney-and-client scale from 19 May 2022 onwards.


Cases Cited


Gordon v Tarnow 1947 (3) SA 525 (A) at 531.


Union Government v Gass 1959 4 SA 401 (A) 413.


Socratous v Grindstone Investments (149/10) [2011] ZASCA 8 (10 March 2011) at [16].


Intercontinental Exports (Pty) Ltd v Fowles 1999 (2) SA 1045 (SCA) at 1055F–G.


Fripp v Gibbon & Co 1913 AD 354 at 364.


Gamlan Investments (Pty) Ltd v Trilion Cape (Pty) Ltd 1996 3 SA 692 (C).


Legislation Cited


No legislation was cited in the judgment.


Rules of Court Cited


Uniform Rule of Court 6(5)(g).


Uniform Rule of Court 36(9)(b).


Held


The court held that, in the context of an existing Rule 6(5)(g) referral order regulating a limited issue for oral evidence, the applicants were not entitled to deliver a further supplementary expert report without obtaining leave of court. The unilateral filing of the report was an irregular step, was prejudicial, and tainted the expert engagement process, including the probative value of the resultant joint minute. The supplementary notice and report were therefore set aside, and the respondent was awarded costs, including a partially punitive costs order from a specified date.


LEGAL PRINCIPLES


The judgment applied the principle that where a court has made an order regulating the procedural conduct of a matter, including a defined referral to oral evidence under Rule 6(5)(g), parties are required to adhere to that framework. The introduction of further expert material outside the scope contemplated by such an order requires leave of court, and unilateral supplementation may constitute an irregular step.


The judgment further applied the principle that litigation must be conducted in a manner consistent with procedural fairness, and that irregular steps which create manifest prejudice to an opposing party, particularly in the management and exchange of expert evidence, may be set aside. The court treated the integrity of the expert process as materially affected where new expert material is introduced late and without proper notice, especially where it changes the substance of what was previously presented.


The judgment applied the principle that a party may be bound by a judicial admission made in the course of litigation and may be precluded from later departing from it in an attempt to justify procedurally impermissible conduct.


On costs, the judgment applied the general rule that costs follow the event, subject to the court’s discretion exercised judicially in light of fairness and the circumstances. It further applied the principle that punitive costs may be warranted where a party’s conduct justifies such sanction, including where continued opposition becomes untenable and unnecessarily burdens the other party and the court process.

About SAFLII
Databases
Search
Terms of Use
RSS Feeds
South Africa: Western Cape High Court, Cape Town
SAFLII
>>
Databases
>>
South Africa: Western Cape High Court, Cape Town
>>
2022
>>
[2022] ZAWCHC 113
|

|

Du Toit N.O. and Another v Clarensville Shareblock Limited (15955 / 2019) [2022] ZAWCHC 113 (6 June 2022)

IN
THE HIGH COURT OF SOUTH AFRICA
(WESTERN
CAPE DIVISION, CAPE TOWN)
Case
Number: 15955 / 2019
In
the matter between:
FRANCOIS
ARNOLD DU TOIT N. O.
First
Applicant
HENRI
DU TOIT N. O.
Second Applicant
(Trustees
for the time being of the Rijsel Trust)
and
CLARENSVILLE
SHAREBLOCK LIMITED
Respondent
Coram:
Wille, J
Heard:
25
th
of May 2022
Delivered:
6
th
of June 2022
judgment
WILLE,
J:
Introduction
[1]
I previously heard and determined an interlocutory
variation
application in connection with this very unfortunate matter.
After judgment was delivered in the
variation
matter, I
discussed with counsel the issue of whether or not I should remain
seized with the further determination of the matter
in any form or
manner. This was pertinently raised by me as in the variation matter
I was obliged to some extent to express a view
regarding the overall
prospects of success in connection with the main application. I was
assured by both the legal teams that
they were in agreement that I
was in no manner precluded from further dealing with this matter. It
is on this basis that I agreed
to hear this second interlocutory
application to which this judgment relates.
[2]
During the course of my judgment in the first variation interlocutory
application,
I endeavored to set out some of the background facts to
the main application. Of necessity, I do so again in order to
position
this second application in its correct context taking into
account the core relief contended for in the main application which
has yet to be determined.
[3]
The first applicant is an experienced architect and is a duly
authorized trustee of
the trust. The respondent is a share-block
company.
[1]
The company owns a
block of apartments in Sea Point.
[2]
The building is approximately (60) years old. As a shareholder of the
company, the trust enjoys certain rights to the use and the

occupation of an apartment.
[3]
[4]
During the course of 2019, the trust made an application to the
respondent’s
directors, so as to make certain alterations to
the apartment. This application was approved in April 2019 and the
works commenced.
Thereafter, and during May 2019, the trust’s
contractor discovered that a certain upstand-beam existed in the wall
of the
apartment, which the trust sought to be removed in order to
install a sliding door between the proposed lounge and, the balcony

of the apartment.
[5]
The purpose and the precise location of this upstand-beam did not
seem entirely clear
due to,
inter alia
, the building’s
age and also because no plans were available that indicated any
specific detail of the structural integrity
of the building and,
presumably how this would be compromised (if at all), by the proposed
alterations.
[6]
An engineer employed by the trust held the view that the beam was

oversized’
and designed a ‘
detail’
for the alteration of the beam which, in his opinion, would mean that
the proposed alteration could continue, without having any
impact on
the structural integrity of the building. The trust was advised by a
different engineer (employed by the company), that
the respondent’s
board had resolved many years ago not to allow any modifications to
the concrete frame of the building,
which would include,
inter
alia,
this upstand-beam of the building.
[7]
Thereafter, the trust was advised that the board would permit the
alterations as sought
by the trust to continue, save for the fact
that the beam fell to be restored to its original condition. The
trustees of the trust
disagreed with this condition imposed by the
respondent. The subsequent confrontation by the trust was essentially
one to the effect
that the decision taken by the board was both
ultra
vires
and
unreasonable
.
[8]
This, in turn, led to a further application by the trust for
permission to alter the
beam on the strength of the opinions
expressed by their engineer. In his letter of support, this engineer
expressed,
inter alia
, the following opinion:
‘…
I,
Martin Woudberg, director at Ekcon Engineers, hereby state that the
proposed modification of the concrete beam at 805 Clarensville
is
adequate. The execution of the detail will not compromise nor have
any impact on the structural integrity of the building, in
any way
whatsoever…’
[9]
The respondent’s board refused this second approach by the
trust. Aggrieved
by this refusal, the trust launched a substantive
application for specific relief to the effect that the board’s
withholding
of its consent to the proposed alteration be declared
unreasonable
and sought an order that the trust is permitted
to alter the beam, as proposed by the engineer for the trust. In
summary, the main
relief sought by the trust was the following: (a)
that the respondent’s withholding of its consent to the
proposed alteration
be declared
unreasonable
and, (b) that the
applicants be allowed to alter the beam as proposed.
The
History of the Litigation
[10]
The principal application initially fell to be determined many months
ago. At one of these scheduled
hearings, the trust sought a variation
order and postponement of the main application. This was piloted by a
formal application.
This latter application was opposed and a full
buffet of affidavits was filed. The trust sought to vary the order
that I initially
issued out on the 4
th
of March 2020 and
it sought an order postponing the hearing and argument in the main
application. The variation order stood opposed,
but the inevitable
postponement of the main application was not opposed, save that
different terms were sought by the respondent,
governing the further
conduct of the matter, going forward.
[11]
This variation application dealt with the fact that I initially
referred an issue identified
by the trust, by agreement, to oral
evidence in terms of rule 6(5)(g). The terms of the referral were,
inter alia
, as follows;
‘…
The
oral evidence shall comprise the expert evidence of Mr Len Nyenes and
Mr Martin Woudberg (‘the experts’) on the
question of
whether the upstand beam referred to in the papers can be altered in
the manner proposed by the applicants without
adversely affecting the
structural integrity of the building owned by the respondent…’
[12]
A variation of this order was sought so
that the trust could introduce another different expert who was
alleged to have been better
qualified than the first expert employed
by the trust.
Significantly, it was also
this expert's opinion that underpinned the second application by the
trust, to the board of the respondent.
I dismissed the variation
application for the reasons set out in that judgment.
Subsequent
Developments
[13]
What followed post the refusal of the variation application is
directly relevant to the determination
of this application. In this
new application, the respondent seeks an order against the applicants
for embarking on irregular proceedings.
They say this because the
applicants delivered a supplementary report and opinion without the
consent of the respondent and without
the leave of the court.
[14]
This
supplementary
report was sent to the respondent’s
expert on the 3
rd
of March 2022. This was presumably so
done in anticipation of the looming meeting of the experts scheduled
for the 7
th
March 2022. The joint meeting of the experts
followed and a joint minute prepared by the applicants’ counsel
was then signed
by both the experts on the 9
th
of March
2022. The supplementary expert report was only filed on the
respondent’s attorneys of record on the 7
th
of March
2022. Significantly, this was only filed after the joint meeting of
the experts had already taken place.
The
Respondent’s Position
[15]
The respondent’s counsel makes a powerful point that the filing
of this supplementary expert
report by the applicants is
irreconcilable with their conduct and the position which they
previously adopted in this matter. In
addition, it is submitted, that
this conduct is prohibited because it amounts to approbating and
reprobating at the same time.
[16]
This, the respondent says, confirms the
irregularity
of the
irregular step in issue in this current opposed interlocutory
application. Further, it is advanced that the filing of the
further
supplementary report is at odds with the terms of the court order
made pursuant to the parties agreeing to its terms in
good faith. It
is also, so it is contended, automatically manifestly prejudicial to
the respondent.
The
Applicants’ Position
[17]
The applicants’ position in connection with the belated filing
of the further supplementary
report by their expert is a relatively
simple one. They contend that the delivery of this further
supplementary report without
the leave of this court is
per se
valid because it is not strictly prohibited by the oral evidence
order. Put in another way, they say the oral evidence order regulates

what they must do and not what they are prohibited from doing.
Consideration
[18]
It is so that all witnesses must only say what they know to be true.
But, they must not also
omit anything that would potentially cause
their evidence to be misleading.
[4]
I say this because it was precisely the oral evidence order which
regulated the parties' respective legal rights in respect of
the
referral to oral evidence. This order did not afford the applicants
any right to file a supplementary expert report. The leave
of this
court was and is required.
[19]
As a matter of logic, an expert witness generally enters the fray
with an aura of respectability
and this may cause the judicial
officer to assume that this witness may be trusted. The factual
canvass also needs to be considered
to understand the opposition
position adopted by the respondent.
[20]
The main application was launched as a matter of urgency nearly (3)
years ago. About a year later
the variation application was argued
and dismissed. No doubt this triggered the further steps by the
applicants to which the respondent
protested.
[21]
The purpose of the oral evidence order was for a limited issue to be
determined by oral evidence.
Accordingly, it is contended by the
respondent that there is absent any purposive or contextual basis
upon which the applicants
are now permitted to file a further
supplementary expert report. This, without the leave of the court and
after the expiry of a
period of nearly (2) years. On this, I agree.
[22]
Further, the further report that the applicants unilaterally filed is
substantively different
from the design concept initially represented
to the respondent for their consideration.
Put
in another way, the
new design concept has never been placed
before the respondent’s board for consideration and does not
touch upon the relief
sought in the main application. As a matter of
logic, it must be so that this compounds its irregularity. To
interpret the order
in any other manner would be to the manifest
prejudice of the respondent.
[23]
Factually, the engineering component of the initial proposal placed
before the respondent’s
board was made up of the following,
namely; (a) a letter from the expert and, (b) his drawing attached
thereto. Whereas, the further
report is (15) pages long and contains
no less than (19) drawings all of which were absent from the initial
proposal. The further
report now contended for is substantively
different from the one initially placed before the respondent’s
board and therefore
the filing thereof is prejudicial to the
respondent for reasons not only of inconvenience, but also that of
costs.
[24]
Further
correspondence followed
between the respective legal teams culminating in an arrangement
being made for the experts to meet and
for the joint minute of the
experts to be agreed. The correspondence from the applicants’
attorneys notably omitted to record
that the meeting was for them to
consider the now new supplementary report compiled on behalf of the
applicants.
[25]
In ignorance of what was taking place behind the scenes with regard
to the now new supplementary
report, the experts met and a joint
minute was signed. The joint minute was drafted by the applicant’s
counsel, this unbeknown
to the respondent and the respondent’s
counsel. After the meeting of the experts, the respondent received
for the first time
a copy of the now new supplementary expert report
by the applicants’ expert. It goes without saying that this
leaves a lot
to be desired and the less said about this the better.
Its irregularity is self-evident.
[26]
This manifest failure to give timeous notice to the respondent’s
attorneys compounds the
nature and extent of the irregularity and the
filing of the further new report accordingly falls to be tainted.
This is because
the respondent’s expert did not know whether
what was being presented to him for consideration was in any legal
context irregular
and, whether this required authority from the board
of the respondent. As a matter of pure logic very little probative
weight (if
any) can be attached to the joint minute.
As
a matter of law the applicants’ acceptance and adoption of the
position being that they
had to ask the court for leave to file a further report constitutes a
judicial admission which they cannot now seek an exodus.
[5]
[27]
In the circumstances, it must be so that the applicants are precluded
from departing from the
judicial admission which they previously
made, and by the applicants to litigate in this fashion is
impermissible. Further, it
is also prejudicial to the respondent’s
right to a fair hearing which is not tainted by any irregularity. It
follows that
the filing of the further report at the instance of the
applicants is not only irregular but manifestly to the prejudice of
the
respondent.
Costs
[28]
One of the fundamental principles of costs is to indemnify a
successful litigant for the expense
put through in unjustly having to
initiate or defend litigation. The successful party should be awarded
costs.
[6]
The last thing that our already congested court rolls require is
further congestion by an unwarranted proliferation of litigation.
[7]
[29]
It is so that when awarding costs, a court has a discretion, which it
must exercise judiciously
and, after due consideration of the salient
facts of each case at that moment. The decision a court takes is a
matter of fairness
to both sides.
[8]
[30]
The court is expected to take into consideration the peculiar
circumstances of each case, carefully
weighing the issues in each
case, the conduct of the parties as well as any other circumstances
which may have a bearing on the
issue of costs, and then make such
order as to costs as would be fair in the discretion of the court.
[31]
No hard and fast rules have been set for compliance and conformity by
the courts unless there
are special circumstances.
[9]
Costs follow the event in that the successful party should be awarded
costs.
[10]
This rule should be departed from only where good grounds for doing
so exist.
[11]
[32]
The respondent seeks a special punitive costs
order against the applicants. In support of this request, the
following issues were
emphasized; (a) that the applicants had no
basis in fact or law to file the supplementary report and, (b) that
the applicants simply
had no basis in fact or in law to only advise
the respondent of the existence of this supplementary expert report
after the joint
meeting of the experts had taken place.
[33]
In all the circumstances of the matter, I hold the view that a
punitive costs order in this matter
is warranted for some of the
reasons set out in this judgment and, for some of the costs incurred
by the respondent.
[34]
I say this because it must have dawned on the applicants shortly
after the filing of the replying
papers to this application that
their opposition to this application was doomed to failure. It is for
these reasons that a portion
of the costs awarded in this matter will
be awarded against the applicants on a punitive scale.
Order
[35]
In the result, the following order is granted, namely:
1.
That the applicants’ supplementary notice in terms of rule
36(9)(b) dated
the 7
th
of March 2022 (attached to which is
the further report of Mr Woudberg dated the 3
rd
of March
2022), is hereby set aside as an irregular step.
2.
That the applicants (jointly and severally, the one paying the other
to be absolved),
shall be liable for the respondent’s costs of
and incidental to this application, on the scale as between party and
party,
as taxed or agreed, from the inception of this application up
and until (and including) the 18
th
of May 2022.
3.
That the applicants (jointly and severally, the one paying the other
to be absolved),
shall be liable for the respondent’s costs of
and incidental to this application, on the scale as between attorney
and client,
as taxed or agreed, from the 19
th
of May 2022
and thereafter.
E.D.
WILLE
Judge
of the High Court
Cape
Town
[1]
The
share block company (the ‘company’).
[2]
The
building consists of (110) apartments.
[3]
The
‘apartment’ - (apartment number 805).
[4]
Argument
and Opinion: Advocate and Expert

By
Mr. Justice Owen Rogers – ‘Advocate’ (April 2019).
[5]
Gordon
v Tarnow
1947
(3) SA 525
(A) at 531
.
[6]
Union
Government v Gass
1959
4 SA 401 (A) 413.
[7]
Socratous
v Grindstone Investments
(149/10)
[2011] ZASCA 8
(10 March 2011) at [16].
[8]
Intercontinental
Exports (Pty) Ltd v Fowles
1999
(2) SA 1045
(SCA)
at 1055F- G
[9]
Fripp
v Gibbon & Co
1913
AD 354
at 364.
[10]
Union
Government v Gass
1959
4 SA 401 (A) 413.
[11]
Gamlan
Investments (Pty) Ltd v Trilion Cape (Pty) Ltd
1996 3 SA 692
(C)